1…CONCRETE GRADES:
M5 = 1:4:8
M10= 1:3:6
M15= 1:2:4
M20= 1:1.5:3
M25= 1:1:2
2…CLEAR COVER TO MAIN REINFORCEMENT:
1.FOOTINGS : 50 mm
2.RAFT FOUNDATION.TOP : 50 mm
3.RAFT FOUNDATION.BOTTOM/SIDES : 75 mm
4.STRAP BEAM : 50 mm
5.GRADE SLAB : 20 mm
6.COLUMN : 40 mm
7.SHEAR WALL : 25 mm
8.BEAMS : 25 mm
9.SLABS : 15 mm
10.FLAT SLAB : 20 mm
11.STAIRCASE : 15 mm
12.RET. WALL : 20/ 25 mm on earth
13.WATER RETAINING STRUCTURES : 20/30 mm
3…WEIGHT OF ROD PER METER LENGTH:
DIA WEIGHT PER METER
6mm = 0.222Kg
8mm = 0.395 Kg
10mm = 0.616 Kg
12mm = 0.888 Kg
16mm = 1.578 Kg
20mm = 2.466 Kg
25mm = 3.853 Kg
32mm = 6.313 Kg
40mm = 9.865 Kg
1bag cement-50kg
1feet-0.3048m
1m-3.28ft
1sq.m-10.76sq.f t
1cu.m-35.28cu.ft
1acre-43560sq.ft
1hectare-2.47acre
4…DESIGN MIX:
M10 ( 1 : 3.92 : 5.62)
Cement : 210 Kg/ M 3
20 mm Jelly : 708 Kg/ M 3
12.5 mm Jelly : 472 Kg/ M 3
River sand : 823 Kg/ M 3
Total water : 185 Kg/ M 3
Fresh concrete density: 2398 Kg/M 3
M20 ( 1 : 2.48 : 3.55)
Cement : 320 Kg/ M 3
20 mm Jelly : 683 Kg/ M 3
12.5 mm Jelly : 455 Kg/ M 3
River sand : 794 Kg/ M 3
Total water : 176 Kg/ M 3
Admixture : 0.7%
Fresh concrete density: 2430 Kg/ M 3
M25 ( 1 : 2.28 : 3.27)
Cement : 340 Kg/ M 3
20 mm Jelly : 667 Kg/ M 3
12.5 mm Jelly : 445 Kg/ M 3
River sand : 775 Kg/ M 3
Total water : 185 Kg/ M 3
Admixture : 0.6%
Fresh concrete density: 2414 Kg/ M 3
Note: sand 775 + 2% moisture, Water185 -20.5 =
164 Liters,
Admixture = 0.5% is 100ml
M30 ( 1 : 2 : 2.87)
Cement : 380 Kg/ M 3
20 mm Jelly : 654 Kg/ M 3
12.5 mm Jelly : 436 Kg/ M 3
River sand : 760 Kg/ M 3
Total water : 187 Kg/ M 3
Admixture : 0.7%
Fresh concrete density: 2420 Kg/ M 3
Note: Sand = 760 Kg with 2% moisture
(170.80+15.20)
5…STANDARD CONVERSION FACTORS
INCH = 25.4 MILLIMETRE
FOOT = 0.3048 METRE
YARD = 0.9144 METRE
MILE = 1.6093 KILOMETER
ACRE = 0.4047 HECTARE
POUND = 0.4536 KILOGRAM
DEGREE FARENHEIT X 5/9 – 32 = DEGREE
CELSIUS
MILLIMETRE= 0.0394 INCH
METRE = 3.2808FOOT
METRE = 1.0936YARD
6…MATERIAL CALCULATION:
CEMENT IN BAGS
01. PCC 1:5:10 1440/5*0.45 129.60Kg 2.59
02. PCC 1:4:8(M 7.5) 1440/4*0.45 162.00Kg 3.24
03. PCC 1:2:4(M 15) 1440/2*0.45 324.00Kg 6.48
04. PCC 1:3:6(M 10) 1440/3*0.45 216.00Kg 4.32
05. RCC 1:2:4(M 15) 144/2*0.45 324.00Kg 6.48
06. RCC 1:1.5:3(M 20) 1440/1.5*0.45 32.00Kg 8.64
07. RCC 1:1:2(M 25) 370.00Kg 7.40
08. RCC M 30 410.00Kg 8.20
09. RCC M35 445.00Kg 8.90
10. RCC M40 480.00Kg 9.60
11. Damp Proof Course CM 1:3,20mm tk 1440/3*0.022 10.56Kg 0.21
12. 2"tk precast slab M15 324*0.05 16.20Kg 0.32
13. 3"tk precast slab M15 324*0.075 24.30Kg 0.49
14. GC Masonry CM 1:7 1440/7*0.34 70.00Kg1.40
15. Brick Work CM 1:6 1440/6*0.25 60.00Kg 1.20
16. Brick Work CM 1:4, 115tk 1440/4*0.25*0.115 10.35Kg 0.21
17. Grano Flooring CC 1:1.5:3 1440/1.5*0.45*0.05 21.60Kg 0.43
18. Plastering CM 1:3, 12mm tk 1440/3*0.014 6.72Kg 0.13
19. Wall Plastering CM 1:4, 12mm tk 1440/4*0.014 5.00Kg 0.10
20. Laying Pressed Tiles Over
a CM 1:4, 20mm tk 1440/4*0.022 7.92Kg 0.16
01. Any Concrete Work
(PCC, RCC) 0.45*35.315= 20.00
02. Damp Proof Course
CM `1:3, 20mm tk 1.00
03. 2"tk Precast slab M15 1.00
04. 3"tk Precast slab M15 1.50
05. SS Masonry in CM 1:7 15.00
06. Brick Work in CM 1:6 15.00
07. Brick Work in CM 1:4,115mm tk 2.00
08. Grano Flooring in CC 1:1.5:3 1.00
09. Plastering in CM 1:3, 12mm tk 1.00
10. Wall Plastering CM 1:4, 12mm tk 1.00
11. Laying Pressed Tiles over a CM 1:4, 20mm tk 1.00
12. Ceramic Tiles, Marble, Granite, Cuddapah slab CM 1:4, 20mm tk 1.00
7…UNIT WEIGHT:
01. Concrete 25 kN/m3
02. Brick 19 kN/m3
03. Steel 7850 Kg/m3
04. Water 1000 Lt/m3
05. Cement 1440 Kg/m3
06. 1Gallon 4.81 Litres
07. Link 8" = 200mm
08. 1 Hectare 2.471 acr(10000m2)
09. 1 Acr 4046.82m2 = 100 cent
8…DEVELOPMENT LENGTH:
01. Compression 38d
02. Tension 47 & 60d
03. 1 Cent 435.60 Sft
04. 1 Meter 3.2808 ft
05. 1 M2 10.76 ft2
06. 1 Feet 0.3048m
07. 1 KN 100Kg
08. 1kN 1000N
09. 1 Ton 1000Kg = 10,000 N = 10 kN
10. 1 kG 9.81N
9…BRICK:
Weight = 3.17 - 3.80 Kg
Water absorption 12 to 15%
Compressive strength = 36Kn/cm2
230mm Wall/m3 = 460 Bricks + 20Cft Sand +
66Kg Cement
There are many basics civil engg fact which i will be adding more in the future.
Following are few general points to remember for civil site engineers to make the construction work easier while maintaining quality of construction.
Density of Materials:
Material Density
Bricks 1600 – 1920 kg/m3
Concrete block 1920 kg/ m3
Reinforced concrete 2310 – 2700 kg/ m3
Curing time of RCC Members for different types of cement:
Super Sulphate cement: 7 days
Ordinary Portland cement OPC: 10 days
Minerals & Admixture added cement: 14 days
De-Shuttering time of different RCC Members:
RCC Member De-shuttering time
For columns, walls, vertical form works 16-24 hrs.
Soffit formwork to slabs 3 days (props to be refixed after removal)
Soffit to beams props 7 days (props to refixed after removal)
Beams spanning upto 4.5m 7 days
Beams spanning over 4.5m 14 days
Arches spanning up to 6m 14 days
Arches spanning over 6m 21 days
Cube samples required for different quantity of concrete:
Quantity of Concrete No. of cubes required
1 – 5 m3 1 No’s
6 - 15 m3 2 No’s
16 – 30 m3 3 No’s
31 – 50 m3 4 No’s
Above 50 m3 4 + 1 No’s of addition of each 50 m3