The cost of BIS ISI Mark Certification Cost and Timeline depends on the product category, applicable Indian Standard, testing requirements, and manufacturing scale.
Application Fee: ₹1,000
Factory Inspection Fee: ₹7,000 per man-day
Annual Licence Fee: ₹1,000
Renewal Application Fee: ₹1,000
Late Renewal Fee: ₹5,000
Inclusion of New Varieties: ₹5,000 per variety/group
Duplicate Licence Fee: ₹1,000
Design and Drawing Approval: ₹5,000, where applicable.
Product Testing Charges: As applicable, depending on the product and laboratory.
Minimum Marking Fee (MMF): Product-specific.
Marking Fee: Based on applicable rates and production quantity.
GST: As per prevailing government rules.
Additional Inspection: Charges apply if additional visits are required.
Consultancy Charges: Depend on the service provider and scope of work.
Large-Scale Manufacturers: 100% of applicable MMF.
Medium-Scale Manufacturers: As per applicable BIS fee schedule.
Small-Scale Manufacturers: 50% of large-scale MMF.
Micro-Scale Manufacturers: 20% of large-scale MMF.
Eligible small and micro manufacturers may receive applicable concessions under BIS rules.
Average Certification Timeline: 90 days.
Application submission and scrutiny.
Factory inspection by BIS officials.
Product sample collection.
Testing in a BIS-recognised laboratory.
Verification of test reports.
Final assessment and licence grant.
Average Certification Timeline: 30 days.
Online application submission.
Product testing through the prescribed BIS-recognised laboratory.
Submission of test reports and supporting documents.
Application scrutiny by BIS.
Factory inspection as prescribed.
Final verification and licence grant.
3. Factors Affecting Certification Timeline
Product category and applicable Indian Standard.
Completeness of application documents.
Manufacturing facility readiness.
Availability of testing equipment.
Laboratory availability and testing duration.
Factory inspection scheduling.
Non-conformities and corrective actions.
Additional testing requirements.
Note: The 90-day and 30-day timelines are average overall processing timelines, not guaranteed durations. Actual processing may vary depending on the application and applicable BIS requirements.