Electrical had a shop which did not have any lifts, a shop classroom, a second shop space, which had 2 lifts, and the 'breezeway' which had no lifts but an extremely high ceiling with a roll-up high bay door on each end. Electrical went to TEC for this temporary relocation.
A typical day,,,
This space had a shop connected to a classroom with an office in-between the breezeway.
We used this space to funnel all the recycle, surplus, trash items because it had easy in/out access
Above is looking east to west (left to right), below is looking north with the backyard to the left
Looking north to the breezeway
Above is looking south, below is looking north
Looking south, shop space w/lifts removed
PHASE II
The finished pictures for this space were too large to for this site.
Old computer lab, to the right of the glass
Here are some of what I call, Learning Objective Materials (LOMs) for electrical