Professional Work at National and International Levels:

(a) Academic/Research:

Engaged in research work funded by European Research Council in the University of Southampton, Southampton UK

(b) Technical Consultancy and Testing:

Performance testing of various water meter discharge under BRTC, BUET.

(c) Contributed to the preparation of lecture material for basic training course for fresh recruits of IWM under BRTC.

(d) Involved in various water sector projects of National Interest under BRTC such as:

1. Advisory services for the project `Community Based Sustainable Management of Tanguar Haor’.

2. Cyclone-Induced Storm Surge Modelling and Assessment of Storm Surge Height for the Construction of Cyclone Shelters in the Coastal Region of Bangladesh”.

3. Hydrological and Morphological Study of Proposed 433.00 m PC Girder Bridge over Shitalakhya River at 10th K.M. of Gazipur-Ajmatpur-Itakhola Road under Narsingdi Road Division

4. Hydrological and Morphological Study for proposed Road Bridge on “Ramnabad River” of Golachipa Upazilla under Patuakhali District.

5. Hydrological & Morphological Study and Review Pier Foundation Design of Pier P1 & P2 for the 135.318 m long PC Girder Bridge at 3rd Km of Neamatpur-Taherpur Road over Abua River under Sunamganj Road Division, Sunamganj using Mathermatical Model.

6. Hydrological & Morphological Study for construction of 200.00 meter long Baradal Bridge over the Kabadak River at 36th km on Assasuni-Paikgacha Road under Satkhira Division.

7. Hydrological & Morphological Study and Environmental Impact Assessment (EIA) of Proposed 2 (Two) Bridges to be implemented over Brahmaputra Rivers in Jamalpur District under “Construction of two Bridges on Brahmaputra river under Islampur Upazila of Jamalpur District

8. Mathematical Model Study on the Effect of Construction of a 1 km Long RCC Jetty by Chittagong Port Authority on the Right Bank of the Karnafuli River in a place between Khal No. 14 and Khal No. 15 at Laldiar Char area.

9. Hydrological and Morphological study for the proposed Road Bridge on Balabhadra River at Nasirnagar Upzila under Brahmanbaria district RHD as Mathematical Modeler.

10. Hydrological and Morphological study for the proposed Road Bridge on Sutia River at Trimohini of Sherpur Upzila under Gazipur district RHD.

11. Coastal Hydraulic and Morphological study and design of protection measures of Marine Drive Road.

12. Consultation on Irrigation Project at the tea gardens of Duncan Brothers (BD) ltd.

13. Mathematical Model study for the proposed dolphin jetty and dry dock at the left bank in the Karnafuli River.

14. A Hydrological Assessment of the land-filling project of Amin-Mohammad city at Sirajdikhan, Munshiganj.

15. Physical model study of Ganges barrage.

16. Capital dredging and Bank protection with Jetty facilities.

17. Coastal hydraulic and Morphological study and design of protection measures of marine drive road.

18. Survey and investigation of water resources management by mathematical modelling of Panchagarh, Thakurgaon, Dinajpur and Joypurhat integrated agricultural development project areas.

19. Hydrologic and hydraulic assessment of direct runoff in the catchment and design of proposed storm water channels on both sides of 300 ft wide Kuril-Purbachal link road.

20. Environmental impact assessment of upstream water withdrawal to conserve natural breeding habitat of major carps in river Halda.

21. Hydrological and Morphological study for the proposed Puna bridge over the river Puna at 46th K. M. of Barisal-Jhalokathi-Rajpur-Bhandaria-Pirojpur road under Pirojpur road division.

22. Hydrological and Morphological study for the proposed Goma bridge over the Rangamati river at 14th K.M. of Dinererpool (Barisal) Laxmipasha Dumki road under Barisal road division.

23. Hydrological and Morphological study for the proposed Ghior bridge over the river Dhaleswari at 6th K. M. of Aricha-Ghior Tangail road under Manikganj road dividion, Manikganj.

24. Hydrological and Morphological study and Environmental impact assessment for the proposed Mathabanga Bridge at 79th K. M. of Kushtia-Meherpur-Chuadanga-Jenaidah road under Chuadanga road dividion.

25. Checking and measuring the leakage of Rampura sluice gate.

26. Impact assessment of upstream water withdrawal to conserve natural breeding habitat of major carps in River Halda.

27. Environmental flow assessment of Gorai River under Gorai River restoration project (Phase II).