Pre Design architectural Services
Pre-Design is a a general term for what we do before we start designing a building. This will include preliminary research on the property owner’s part and the architect. Clients do not always hire an architect for this portion. At our firm we provide pre-design architectural services quite often. This can include helping developers decide if they should purchase a property. We often do a zoning analysis in pre-design to determine what we can build. Land Surveys and site analysis are part of pre-design. The client gets a property survey by a licensed land surveyor, not an architect.
The developer may want to establish a project budget in the Pre-Design Architecture phase. To learn more about pre-design, check out another post we wrote on Pre Design Architecture. Pre-design will be determining the information we need to begin design. Here are a few factors to consider:
Site Analysis
Survey, Geo technical, financial, etc…
If we are dealing with an existing building: asbestos testing, lead testing, or other hazardous materials investigation.
Zoning Analysis / Code analysis
Establish what you can build, as for use and size.
Specific Code Issues that may affect the project.
Project Scope
Client must identify to the best of their ability the project scope of work.
Project Goals
Building Program
A Building Program is a list of the proposed uses.
Project Budgeting
Project Schedule
Sometimes this may be too preliminary to establish.
Selection Of Project team
Schematic Design is the first phase of design. It will account for approximately 15% of the architect’s work, and therefore the fees on the entire project as well. Of course, the percentages can fluctuate. In schematic design the architect and the owner discuss the project and any requirements provided by the owner. The architect does precedent research and analysis of the property. The analysis will include zoning and building code issues that may affect the development, as well as site analysis. Programming is part of schematic design. This is when the client provides the architect with a list of what spaces are going into the building. The architect establishes the size, location, and relationships between all the spaces.
The basic goal of schematic design is to develop the shape and size of the building with some basic design. We develop the general plan and basic exterior design in Schematic. During the schematic design phase, we figure out more or less how the building will look and operate. Schematic phase has a great deal of sketching, lots of meetings with the clients, and basic design. It is overall the fun part for the clients. Schematic is where you are really doing the general design, but not getting into deep detail.
Once the basic design is locked down and the architect provides the client with drawings, the architect and owner will agree to proceed to the next phase of design.
The Design Development Phase is going to be approximately 20% of the architects work and fees. In Design Development the architect and owner will work together to select materials including interior finishes and products such as windows. doors, fixtures, appliances, etc… The architect will revise the drawings with more specificity and detail than in Schematic Design. Engineering will commence on the structure, plumbing, electrical, heating/ventilation systems, energy analysis and any other project specific systems. At the end of design development, a good deal of product selection and systems design should be progressing. This phase concludes when the interior and exterior design of the building is locked in by the owner and architect.
The Construction Documents Phase is the largest of all the phases for the architect and will be about 40% of the architects work and fees. Although the percentage may vary a little from project to project or with Different Architecture Firms. In the construction document phase the architect and engineers finalize all the technical design and engineering including structural engineering and detailing, heating air conditioning and ventilation systems, plumbing, electrical, gas, energy calculations, and all products and materials are selected and scheduled.
The architect produces multiple drawing sets including a filing set for approval from the Department Of Buildings and a separate set of Construction Drawings. You do not need to submit a full CD set to the Department Of Buildings. For example the DOB does not care what type of bathroom tiles or cabinets you are going to use. At our Architecture Firm we typically do our construction documents by making separate drawings customized for each work type. For example the electrician gets his own drawings that only show the electrical work, and the concrete contractor only gets drawings for foundations and concrete work. This reduces confusion on job sites and makes it easier for everyone to price the job and know exactly what they are responsible for. Below is a sheet from our construction documents with details of the exterior wall construction.
Bidding should be self explanatory. At this time the owner prepares to select the contractor for the job and sign contracts to proceed with construction. This will typically take up 5% of the architects time and fees. Multiple contractors submit bids on the job or the client can directly hire a contractor without getting competitive bids The architect’s role here will be to assist the client. We will answer contractor’s questions, provide any additional documentation if requested by the contractor. This phase can be started at the beginning of the project. You do not need to wait until all of the construction documents are completed but the price will be more accurate if you do.
If you have an exact budget in mind at the beginning of the process, we may recommend you hire a contractor early to consult. The GC can and review the schematic design, design development, and construction drawings from the beginning in order to ensure the project is within the specified budget. Only a contractor can guarantee a price for construction. Architects and cost estimators who provided budgets cannot guarantee those prices, but can provided and educated budget price.
The Construction Administration phase of architectural services is the final phase. CA and accounts for at most 20% of the architects time and fees on a project in most cases. While this phase is the longest, it does not usually comprise the majority of the architects work. On typical projects the architect does NOT supervise construction. The architect will periodically visit the job site to see progress and ensure the contractor is following the plans. If needed the architect can review contractor’s monthly invoices to confirm work completion. The architect will be available to answer questions and provide additional information to issues that arise. During this phase it is not uncommon that some additional services for the architect arise due to change orders.
In New York City the Department Of Buildings (DOB) requires architects to perform multiple progress inspections and special inspections. The architect and engineers must submit Technical Reports to the DOB. Progress inspections are conducted by the architect. Special inspections may require a third party Inspection Agency with a specialized license.
The architect stays on the project until the the building is finished. Final inspections are all completed, and the owner obtains a Certificate of Occupancy.
Much often we here that of negative thought or view on contractors. It seems that everything that the contractor do are being bad and the irony is that everything that we see around us is the work of contractors and tradesperson.
Contractor disappear as payment are made.
This is the most popular problem or issue that are facing with homeowner or project owner.
Slow progress
Another common issue
Low quality materials or workmanship
We saw contractor as making easy money
4.Defects and warranty.
Unable to get in touch to solve this issue.
These are some of the many issues that usually occur when dealing with contractor. However the home owner should understand that all the above matter is not somewhat new. The construction industry had been here for ages.
Many law and method had been implemented to cope these issues. Just to save up a few extra cost on contracts and consultant services, the homeowners decided to skip the process as it seem not really contributing to the real physical result of the project. Which come to worse sometime without this process the homeowner had to come out extra cash or get in the risk of the project not able to be finished.
The SSM and CIDB offer help to tackle this by being a body that ensure the contractor as a legit registered company. The company or contractor that are registered are accountable and they are people with liability if there any dispute. Of course hiring these registered contractor will increase the cost of the project but bare in mind they also have other expenses to maintain their company to comply with the CIDB guidelines.
Taking from my experience working in project management roles before this until now, it is clear that the initial part of project management play an integral part in the well being of the project as a whole.
This come with many famous quotes and sayings that if we are fail to plan, we are planning to fail. With that in mind, I had encounter numerous issues and setbacks that can be mitigated early on with solid planning had be done. On the other hand, I had the chance to work with project that run rigorous planning early on which delayed the execution of the project. However, I much prefer the later one.
From both perspective, I actually prefer the early rigorous planning rather than have to cope with issues and barriers while the project is on going on the site. These because that the early planning cost is much more low compared to the execution process if there any issues that will hinder the progress of that phase. Much worse if any issues that occur during execution phase could affect the productivity of the site and final result of the project.
As the above figure show that, the planning phase should able provide certainty of decisions as well as answers to issues and risks that might occur. Detail plan should be precise and take into account any possibilities and nuance variation.
My final takes is that planning is an art, much like the Malay martial art moves, that includes many various of non-combatant movements that prep the person for their next move either to counter an opponent moves or strike that lethal blow. It is less exhaustive than the real strike and at the same time efficiently give the real impact at the most critical situation. Art in Malay word is seni which gives meaning to miniscule and beautiful. So planning is a work of art that give details to every minutes or nuances aspects of the project which in turn produce beautiful and high quality result.
The minimum wage set by malaysia is RM1200.00.
An example of worker working 8 to 5 with one hour break for 20 days will work around 160 hours a month. The wages per hour will be RM7.50 compared to australia of AUD19.84.
Taking into account of tax, the paid out will be AUD 15.00 per hour. The minimum wage worker can still afford a meal of mcdonalds by an hour at AUD 12.00 . Whereas our minimum wage worker need to work for 2 hours to be able to buy a meal at RM15.00.
I'm not an economist nor politicians. Just intrigue.
While our parliament bickering on who are right and wrong. No one actually thinking for the sake of people who vote them.
ps: why 20 days/month? Malaysia got darn too many holidays.
Since our minister of finance have banking background hope he can give better service to the people.