Making the concrete form.
Setting bolts in place that will later secure the stud wall.
Mixing the concrete.
Pouring concrete into forms.
Taking forms off concrete after it had set.
Picture of what the concrete looked like when it had set.
Frame of stud wall being fitted to the bolts.
Securing stud frame to wall with a nail gun.
My mentor, my client, and myself checking to see if door was level.
My mentor, my client, and myself shimming the door till it is tight.
Final product of the door. This picture also shows the finished stud walls on the side of the doors.
Cutting the J -channel to go around the tin.
Screwing the J-channel along the outside perimeter of where the tin will go.
The final product of the tin I installed that day.
Cutting the insulation to fit the area.
Putting in the insulation in the wall.
Working on putting insulation around electrical wires.
Working around doorway on north wall.
Working on outlets on the west wall.
Working on the North Wall underneath the loft.
Pinning the car siding on the North wall.
Screwing tin to the rafters along the south wall.
Screwing tin to the rafters along the north wall.
A look of the finished product of the tin ceiling.
A point of view as you first walk in the man cave.
A point of view from the southeast corner.
A point of view from the northwest corner.
A point of view from southwest corner.