This is the bridge made by us (Group 10) at USC's Discover Engineering Program -
Our team was instructed to make a bridge capable of holding the most amount of bricks on a moving cart being made entirely of balsa wood
The initial base/road of the bridge being built
The beginning of the construction of the truss
Ashton and Ruben constructing the legs of the bridge
Our finished product!!
Our Goal and Building Process
Our bridge was constructed entirely from balsa wood slats and hot glue. We began by building a flat base for the floor, then added evenly spaced vertical slats to create a strong structural foundation. Next, we attached the inverted trusses, which helped distribute the load across the bridge. Finally, we built and attached the legs, connecting them to the trusses and reinforcing the structure with horizontal support slats. Every piece was carefully measured and cut with an X-Acto knife to ensure accurate sizing, resulting in a bridge that measured 4 feet long and 1 foot wide. Throughout the project, we relied on strong teamwork, communication, and problem-solving skills to build the strongest bridge possible. The goal was to support the greatest number of bricks on a cart that traveled back and forth across the bridge. Our bridge ultimately held 12 bricks before failing, but the failure was caused by the cart's wheels puncturing the thin floor between the reinforced vertical slats rather than the overall frame collapsing. In fact, the bridge was strong enough to support two of us standing on it, with a combined weight of over 250 pounds. Overall, we were very pleased with the strength of our design, and the experience showed us the importance of reinforcing not only the frame but also the bridge deck itself.
Our initial concept for our bridge
The video showcasing the bridges abilty to carry bricks alon the top
Our second project at the USC Discover Engineering Program -Â
We created a balsa wood windmill capable of generating enough electricity to power a small lightbulb. This project was also created entirely out of balsa wood.
Our second project was constructing a functional windmill entirely out of balsa wood that was capable of generating enough electricity to power a small lightbulb. We began by building a sturdy triangular frame to provide a stable foundation for the windmill. Next, we mounted the main windshaft at the top of the frame, ensuring it was properly aligned so it could rotate freely. After that, we added additional supports for the main shaft to increase stability and reduce movement while the blades spun. Finally, we attached the completed rotor blades and finished assembling the windmill, making sure each component was securely fastened and properly balanced. Throughout the project, we carefully measured, cut, and assembled each piece using balsa wood and hot glue while relying on teamwork, communication, and problem-solving skills. Unfortunately, our windmill was unable to successfully generate enough electrical energy to power a small lightbulb due to friction generated by the balsa wood and our blade unable to generate enough torque to power the ligthbulb. Overall, this project taught us the importance of precision, structural stability, and efficient energy transfer when designing renewable energy systems.
The beginnging of our windmill frame being constructed
The windshaft being mounted at the top
Added the support for the main shaft in preparation for the rotor blades
The finished windmill product with everything attatched!
These two images are our 3d models of our designs for both the windmill and its fan blades