Classroom shortages
Student pull-out and small-group instruction areas do not exist
Security concerns related to front office design and the number of entry points located throughout the existing building
Student, staff, and visitor accessibility to different areas of the building
Library square footage has been reduced by over 65% in the past 10 years, we have used the space for 2 additional classrooms as well as office space for our Special Education Department
Cafeteria
Storage
Student pick-up and drop-off is unsafe, congested and creates traffic issues on Oak Park Ave
The new addition will provide 8 additional classrooms and 2 science labs
Additional small-group instruction areas are included in the plan and will free up smaller spaces in the current building for small-group instruction
Redesigned front office with modern security upgrades and review current entry points throughout the existing building
Add two elevators to the existing building
The current plan calls for a new library
The new addition will have a cafeteria on the first level
Storage space will be included in the new construction
Relocate parking lot to allow for pick-up and drop-off away from Oak Park Ave