Group 4 (Structural Performance Priority)
Group 4 (Structural Performance Priority)
Group 4 aimed to develop their ideal form of a truss without heavy consideration towards material inventory, but rather limiting deficiencies in the structure like buckling and undesired compression.
Taped layout of offcut lengths with Hololens assistance (Riddhi P.)
Creating doweled joints as form of connection (Xinhong W.)
(Picture by Xinhong W.)
(Picture by Robert S.)
Tilting completed truss upwards (Fadila Z.)