Group 1 (Material Inventory + Structural Performance Priority)
Group 1 (Material Inventory + Structural Performance Priority)
Group 1 aimed to prioritize the optimal use of the materials available to them and the structural efficiency of the truss to limit buckling along with undesired stresses.
Taped layout of offcut lengths with Hololens assistance (Srabontee C.)
Layout of offcuts over taped markers (Srabontee C.)
Creating of doweled joints as form of connection (Drue B.)
Overlaying completed trusses (Marie B.)
Assembling two trusses together (Riley C.)
(Picture by Drue B.)