Rockton
Addition {2020}
This is the addition on the back of the house to add a shower and a larger room on the entrance of the back of the house. I got a building permit with WINNEBAGO County applied for on 9/1/20 issued 10/27/20. Project finally started on November 5th 2020 after numerous delays.
Address:
1314 N. Blackhawk Blvd. Rockton, IL.
Owner's:
Mark, Cathy and Bryce Micka
For my Mom Margret Micka
815-222-4803
email: hoppinhal@charter.net
List of Contractors below:
- Concrete work: HMH Concrete and Construction Owner Mike Fasula 815-633-0541
- Carpenter Framing: Kim A. Peterson Construction 815-703-6841
- Electrical work: Me
- Plumbing work: Brian Elmer Plumbing Owner Brain Elmer 815-624-7681 Trish, Jerad and especially Dave Wilson.
- Plastering work: Executive Plastering Services LLC Owner Jeff Ross 815-633-6655
- Misc. work and Carpenter: Chris Steward majority of the finish work inside and outside. 815-242-0022
- Tile & Flooring: Shaun & Ryan Minnahan 815-323-3203
- Painter:
Proposed drawings submitted to Winnebago County, IL.
Winnebago County Building Permit Number NO. 202062880
BEFORE;
Before we start this is what it looks like.
Wednesday November 4th 2020 concrete scored and cut.
Thursday November 5th 2020 concrete broke up and removed.
Thursday November 5th 2020 concrete broke up and removed.
Thursday November 5th 2020 concrete broke up and removed. Excavated..
Thursday November 5th 2020 concrete broke up and removed.
Thursday November 5th 2020 concrete broke up and removed. Scuttle hole cut into foundation.
Thursday November 5th 2020. Excavated down below the freeze line.
Thursday November 5th 2020. Foundation forms made rebar in place.
Footing Inspection Winnebago County, IL.
Foundation forms made rebar in place and inspected Friday November 6th 1st thing.
Friday November 6th 2020.
Friday November 6th 2020 foundation poured in the AM. Then in the PM the walls forms are built and poured in the PM
Friday November 6th 2020 foundation poured in the AM. Then in the PM the walls forms are built and poured in the PM
Friday November 6th 2020 the wall forms are built and the walls are poured.
Saturday November 7th 2020 the wall forms are removed and tar on the wall below grade to water protection.
Saturday Nov 7th 2020 ready for backfill and pourr the entrance floor and dust cover in the crawl space.
Saturday Nov 7th 2020 ready for backfill and pourr the entrance floor and dust cover in the crawl space. HMH Concrete and Construction. Mike Fasula and crew.
Saturday Nov 7th 2020 ready for backfill and pourr the entrance floor and dust cover in the crawl space
Saturday Nov 7th 2020 ready for the pour of the entrance floor and dust cover in the crawl space.
Saturday Nov 7th 2020 ready for the pour of the entrance floor and dust cover in the crawl space.
Saturday Nov 7th 2020 ready for the pour the approach.
Friday November 6th 2020. HMH Concrete and Construction and crew.
Saturday Nov 7th 2020 ready for the pour of the entrance floor and dust cover in the crawl space and approach.
Saturday November 7th 2020. HMH Concrete and Construction and crew
Tuesday November 10th 2010: Moved the wood from the barn to the house and loaded the trailer incorrectly and all the weight was on the tongue and destroyed the truck hitch receiver.
Walls fondation done and set ready to frame..
Thursday November 12th ready to go.
Friday November 13th before the floor in the addition can be done the deck under needs to be raised for I can tass my boots under the floor it needs to be raised approx. 2 feet. The scuttle hole is still blocked.
Start of day Saturday November 14th 2020 scuttle hole deck and seal plate. I got Kim Peterson and his guys Fred and Mike to frame it up in 2 days plus.
Saturday November 14th 2020 floor and engineered floor joist installed
Saturday November 14th 2020 engineered floor joist
Saturday November 14th 2020 floor and first wall 2x6 construction
Saturday November 14th 2020
Saturday November 14th 2020 Truss, rafters and tar paper the roof. supposed to rain tonight and boy did it.
Sunday November 15th 2020 dito. Change of plans and roof line, two peaks instead of of one which would have had a 3.2 :12. Now 6:12 on old and 4:12 on addition.
Sunday November 15th 2020 roof bridge installed between gables
Sunday November 15th 2020 house wrap
Sunday November 15th 2020
Sunday November 15th 2020 End of Day
Bathroom Before and After the sink and toilet removed.
Bathroom after window removed and wall Demo
Bathroom wall Demo and loking int new enlarged room and from new addition into the house.
Plumbing Electrical and Fireproffinf
STARTING THE ELECTRICAL WORK 11/27/20
Ready for Electrical, Plumbing and Fireproofing for inspections 12/1/20
Drywall ceiling in dead air space fireproof. Plumbing and Heating Inspections 12/1/20
12/2/20 ELECTRICAL, PLUMBING, HEATING AND STRUCTURAL INSPECTIONS ALL DONE TODAY AND PASSED YEE HAA
THANKS TO: STEVE, DOUG AND JOHN OF WINNEBAGO COUNTY BUILDING DEPARTMENT. THANKS FOR YOUR PROMPT RESPONSE FOR INSPECTIONS. I CALLED THEM ON 12/1/20 AND ALL WERE DONE BY NOON 12/2/20
12.2.20 INSULATING AND MOISTURE BARRIER PUT UP IN MOM'S NEW SHOWER
12/3/20. Inserting the blocks for handicap bars around the bathroom. SHOWER
12/3/20. Inserting the blocks for handicap bars around the bathroom. SHOWER CORNER
12/3/20. Inserting the blocks for handicap bars around the bathroom. NEXT TO THE TOILET
12/3/20 Plastic behind the the cement board is up and the cement board up. Ready for the Shaun the tiler to start on the shower pan this weekend..
12/3/20 outside soffit and facia trim goes up.
While putting up blocks to protect the pipes from being stepped on I drilled a hole through the pipe. OLD door on the inside that will come out soon
Sunday 12/6/2020 Shaun Minnihan mixing the dry mortar mix applying it with his Dad and the finished product. We now have the perfect shower pan!
12/6/2020Patching behind where the overlaying drywall will be to prevent weak spots.
12/12/20 inside looking out back door. Before the door and wall removed
12/12/20 outside looking in before and after the door and wall removed.. NEW 2x10 engineered lumber header
12/12/20 the Tile work begins. Shaun and his Dad Ryan do tip top work...
12/16/20 Dry Run on the new toilet. Drywall up.
12/16/20 More drywall up.
10/18/20 Plaster first coat up.
Tile going down in the Mud room
Getting Closer