Project 2: Earthquake and Boise River Bridge Design - A Project-based STEM +Computing Inquiry
(90 minutes in total including 10 minutes break in the middle of the session)
Overall guiding question: How can we build a bridge for the Boise River that is strong enough to resist earthquake forces?
Sub questions: 1) How do the four major types of bridges work differently?
2) When would a bridge designer want to use each type of bridge?
Learning outcome: Students will present differences of how a bridge works for four major types of bridges.
CT component embedded in student activities:
Data Collection: Students will gather information on four types of bridges and what their uses are.
Communication: Students will make a presentation to the class.
Simulation and Modeling: Students will understand four different types of bridge through hands-on simulation activities.
Group simulations: Four 15-minute stations for each bridge type. - 60 minutes
Let's do this activity in groups. There are 4 stations/simulations in this activity – one for each of the four bridge types. Each station/simulation will spend approximately 15 minutes to simulate how different types of bridges function. Each student should participate in all four simulations, and must record detailed observations in their notebooks – how does each type of bridge work, and what is the best use for that bridge type? What are some risks or benefits of that type of construction?
The teacher is the timekeeper, monitoring student efforts and alerting when it is approaching time for station rotations. The teacher needs to guide students to think about how to record their observations after each simulation and after the first two rotations have been completed (approximately 30 minutes).
The directions for each station are provided below. The teacher prints the directions and includes them at each station for the students to use. There should be four stations for each bridge-type.
Each station should be tested before the session by the teacher to determine appropriateness for students. The Cable Station, in particular, requires careful, considerate student interaction.
Resources provided and facilitation suggestions:
Directions for each station from NOVA/PBS: (also found in appendix)
At each station: at least 10 books (phone books are great) of similar size
For each of the following resources, having a variety of sizes and lengths will improve the variety of student experimentation. Teachers should use discretion and test each station to determine the optimal size and effort for students.At each of the four stations, the teacher needs to take the opportunity to facilitate student learning so that the station activities/simulations are both hands-on and mind-on activities. Some questions the teacher can ask are:
1) How does this type of bridge work?
2) Why would an engineer choose to create this type of bridge?
The Cooperative Learning and Teamwork Rubric is a tool for teachers to use to guide team work.
Arch Station Simulation: How Do the Abutments Support an Arch Bridge? Resources needed - at least 4 pieces of cardboard, cut into 1” x 11” strips (Please prepare the materials ahead of time).
Bixby Creek Bridge, Monterey, CA Photo credit: © Jay Spooner/iStockphoto
Instructions: Cut a strip of cardboard that's about one inch by 11 inches. Gently bend the strip so that it has a curve. Step 1: Position the cardboard on a table so that it resembles an arch. Press down on the center of the arch. What happens to the ends of the cardboard?
Step 1
Step 2
Step 2: Next, place a stack of books at each end of the arch. Press again. Now what happens? Notice how the stacks of books act as abutments, keeping the ends of the arch from spreading outward.
Beam Station Simulation: What Happens when A Load Pushes Down on A Beam Bridge? Resources needed - at least 3 sponges with notches cut into the top (see resource website)
Beam bridge Photo credit: © Andrea Pelletier/iStockphoto
Instructions: Take a small sponge and slice a shallow notch across the top and bottom. Create a beam bridge by supporting each end of the sponge with a stack of books. Press down on the center of the bridge. What happens to the top and bottom notches? Notice how the top notch squeezes together in compression, while the bottom notch spreads apart under tension.
Cable Station Simulation: How Do Cable-stayeds Work? Resources needed - at least 3 strands of rope/string, each about 5’ long (length may be affected by student size) at least 3 strands of rope/string, each about 6’ long (length may be affected by student size)
William H. Natcher Bridge, Rockport, IN Photo credit: © David Sailors/CORBIS
Instructions: Stand up and hold your arms out horizontally at each side as showing in the picture below. Imagine that your arms are a bridge, and your head is a tower in the middle. In this position, your muscles are holding up your arms. Try making cable-stayeds to support your arms.
Step 1: Take a piece of rope (about five feet long), and have a partner tie each end of the rope to each of your elbows. Then lay the middle of the rope on top of your head. The rope acts as a cable-stayed and holds your elbows up.
Step 2: Have your partner tie a second piece of rope (about six feet long) to each wrist. Lay the second rope over your head. You now have two cable-stayeds. Where do you feel a pushing force, or compression? Notice how the cable-stayeds transfer the load of the bridge (your arms) to the tower (your head).
Suspension Station Simulation: What are the anchorages for? Resources needed- 6 strands of string, each at least 3’ long, and perhaps longer
Instructions: Tie two loops of string around the tops of two hardcover books of similar size. Tie a third piece of string to each loop so that it hangs loosely between the books. Press down on the center string. What happens?
Next, stand two books upright about 10 inches apart. Put a stack of heavy books on one end of a string to secure it to the table. Then pass the string over each standing book (letting some string hang loosely between the books). Place a second stack of books on the other end of the string. Press again on the center of the string. What happens? Notice how the anchorages (stacks of books) help to stabilize the bridge.
Presentations: 10 minutes
After completing each of the four stations, the teacher determines which stations will be presented by which groups. One method of selection is by student choice or request; another method is to have group present on the bridge station they visited last. Regardless of the motivation for selection, each student will seek to answer these three questions, as a group: 1) How does this type of bridge work? 2) Why would an engineer choose to create this type of bridge? 3) What are some famous bridges of this style that exist in the world? After a few minutes of preparation, each student will speak to the group. Other students may offer their observations or questions after each students' presentation.
End of Session Reflection and Debriefing: 5-10 minutes
Using the Problem Solving Process diagram, the teacher will ask students to identify what kind of problem solving skills/process/computational thinking they used in this session and explain how they used it. The following are some sample questions that can guide the debrief.
What did I learn today?
What problem solving skills/processes or CT components I used today in this diagram?
How did you use the problem solving skills/processes/CT components?
Appendix 1: Background Knowledge for Each Type of Bridges (This is more for the teachers and facilitators to acquire more background knowledge of each type of bridges in order to facilitate this session.)
The Pont du Gard aqueduct Photo credit: © Agnieszka Gaul/iStockphoto
The New River Gorge Bridge Photo credit: © John Brueske/iStockphoto
A beam or "girder" bridge is the simplest and most inexpensive kind of bridge. According to Craig Finley of Finley/McNary Engineering, "they're basically the vanillas of the bridge world."
In its most basic form, a beam bridge consists of a horizontal beam that is supported at each end by piers. The weight of the beam pushes straight down on the piers.
Prestressed concrete is an ideal material for beam bridge construction. The concrete withstands the forces of compression well, and the steel rods embedded within resist the forces of tension. Prestressed concrete also tends to be one of the least expensive materials in construction.
But even the best materials can't compensate for the beam bridge's biggest limitation: its length. The farther apart its supports, the weaker a beam bridge gets. As a result, individual beam-bridge girders rarely stretch more than 250 feet. This doesn't mean beam bridges aren't used to cross great distances; it only means that they must be daisy-chained together, creating what's known in the bridge world as a continuous span.
The Lake Pontchartrain Causeway, Louisiana Photo credit: © Gary Fowler/iStockphoto
In fact, the world's longest bridge is a continuous-span beam bridge. Almost 24 miles long, the Lake Pontchartrain Causeway consists of a pair of two-lane sections that run parallel to each other. The Southbound Lane, completed in 1956, comprises 2,243 separate spans, while the Northbound Lane, completed in 1969, includes 1,500 longer spans. Seven crossover lanes connect the two main sections and function as pull-over bays in emergencies. Although impressive, the Lake Pontchartrain Causeway bridge underscores the drawback of continuous spans—they are not well suited for locations that require unobstructed clearance below.
Cable-stayed bridges may look similar to suspension bridges—both have roadways that hang from cables, and both have towers. But the two bridges support the load of the roadway in very different ways. The difference lies in how the cables connect to the towers. In suspension bridges, the cables ride freely across the towers, transmitting the load to the anchorages at either end. In cable-stayed bridges, the cables are attached to the towers, which alone bear the load.
The Sunshine Skyway Bridge Photo credit: © Tinik/iStockphoto
The cables can be attached to the roadway in either of two main ways. In a radial pattern, cables extend from several points on the road to a single point at the top of the tower. In a parallel pattern, cables are attached at different heights along the tower, running parallel to one another.
Even though cable-stayed bridges look futuristic, the idea for them goes back a long way. The first known sketch of a cable-stayed bridge appears in a book called Machinae Novae published in 1595, but it wasn't until this century that engineers began to use them. In post-World War II Europe, where steel was scarce, the design was perfect for rebuilding bombed-out bridges that still had standing foundations. Cable-stayed bridges have gone up in the United States only recently, but the response has been passionate.
For medium-length spans—those between 500 and 2,800 feet—cable-stayeds are fast becoming the bridge of choice. And even longer cable-stayeds are going up, though suspension bridges are still used for the very longest spans. Compared to suspension bridges, cable-stayeds require less cable, can be constructed out of identical precast concrete sections, and are faster to build. The result is a cost-effective bridge that is undeniably beautiful.
In 1988, the Sunshine Skyway bridge in Tampa, Florida won the prestigious Presidential Design Award from the National Endowment for the Arts. Painted yellow to contrast with its marine surroundings, the Sunshine Skyway is one of the first cable-stayed bridges to attach cables to the center of its roadway as opposed to the outer edges, allowing commuters an unobstructed view of the magnificent bay. Recently, in Boston, Massachusetts, a cable-stayed design was selected for a new bridge across the Charles River—even though cheaper options were proposed. City officials simply liked the way it looked.
Suspension bridges are pleasing to look at, light, and strong, and can span distances from 2,000 to 7,000 feet—far longer than any other kind of bridge. They also tend to be the most expensive to build. True to its name, a suspension bridge suspends the roadway from huge main cables, which extend from one end of the bridge to the other. These cables rest atop high towers and are secured at each end by anchorages.
The towers enable engineers to stretch the main cables over long distances. The cables carry most of the bridge’s weight to the anchorages, which are embedded in either solid rock or massive concrete blocks. Inside the anchorages, the cables are spread over a large area to evenly distribute the load and to prevent the cables from breaking free.
The Humber Bridge Photo credit: © Paul Hutchings/iStockphoto
Some of the earliest suspension-bridge cables were made from twisted grass. In the early 19th century, engineers began using iron chains for such cables. Today, the cables are made of thousands of individual steel wires bound tightly together. Steel, which is very strong under tension, is an ideal material for cables; a single steel wire only 0.1-inch thick can support over half a ton without breaking. Currently, the Humber Bridge in England has the world's longest center span—measuring 4,624 feet.
Akashi Kaikyo Bridge Photo credit: © GYRO PHOTOGRAPHY / amanaimages / Corbis
But this record won't stand for long. In 1998, the Japanese will unveil the $7.6 billion Akashi Kaikyo Bridge, linking the islands of Honshu and Shikoku via Awaji Island. The bridge's center section stretches a staggering 6,527 feet. To keep the structure stable, engineers have added pendulum-like devices on the towers to keep them from swaying and a stabilizing fin beneath the center deck to resist typhoon-strength winds.
Because suspension bridges are light and flexible, wind is always a serious concern—as the residents of Tacoma, Washington can surely attest. At the time it opened for traffic in 1940, the Tacoma Narrows Bridge was the third-longest suspension bridge in the world. It was promptly nicknamed "Galloping Gertie," due to its behavior in wind. Not only did the deck sway sideways, but vertical undulations also appeared in quite moderate winds. Drivers reported that cars ahead of them would completely disappear and reappear from view several times as they crossed the bridge.
Attempts were made to stabilize the structure with cables and hydraulic buffers, but they were unsuccessful. On November 7, 1940, only four months after it opened, the Tacoma Narrows Bridge collapsed in a wind of 42 mph—even though engineers had ostensibly designed the structure to withstand winds of up to 120 mph.
The failure came as a severe shock to the engineering community. Why did a great span, more than half a mile in length and weighing tens of thousands of tons, spring to life in a relatively light wind? And how did slow, steady, and comparatively harmless motions suddenly transmogrify into a catastrophic force?
To answer these questions, engineers began applying the science of aerodynamics to bridge design. Technical experts still disagree on the exact cause of the bridge's destruction, but most agree the collapse had something to do with a complex phenomenon called resonance, the same force that can cause a soprano's voice to shatter a glass.
Photo credit: © Lawrence Freytag/iStockphoto
This Tacoma Narrows Bridge opened in 1950, replacing the collapsed "Galloping Gertie." An even newer bridge now stands beside this one.
Today, wind-tunnel testing of bridge designs is mandatory. As for the Tacoma Narrows Bridge, reconstruction began in 1949. The new bridge is wider, has deep, stiffening trusses under the roadway, and even sports a slender gap down the middle—all to dampen the effect of the wind.