Curriculum Vitae

25+ years experience in site construction of oil & gas plants, power plants (cogeneration and trigeneration), petrochemical plants and various industrial buildings and roads infrastructures.

 Date and place of birth: July 22nd   Feltre

Address: Feltre (BL) Via Cismon, 30

Nationality: Italian

Status: Single

Mobile: +39 3488574110

Emailroberto.zanandrea@gmail.com

Skype:  robertozanandrea

LinkedIn :  http://it.linkedin.com/pub/roberto-zanandrea/14/435/85a/

Language:

English - Proficient

French – Independent

German: Basic

 

Experience:

 

 

 Detailed experience:

 

01/2017 – today:

- Abu Dhabi Company for Onshore Oil Operations (ADCO), Phase III Al Dabb’iya Surface Facilities Abu Dhabi, (UAE).

Work description: Construction management and supervision of all underground works.

- 30 Km of piping - Accidentally Oil, Fire/Fresh/Drinking/Storm water, Instrument/Plant air, closed drain, Sewage/Sanitary, Chemical (Green & Brown field);

- 20 Km of Process E&I trenches (Green & Brown field);

- 750 duct banks;

- 1500 Pits;

 - Onshore Oil Clusters, gas lift and injection wells, Oil spill center.

Construction manager for Maire Tecnimont S.p.A.

 

04/2015 – 12/2016: Sabbatical Year

- Renovation project: "Feltre Cultural Heritage typical style house", built in the early 1800s;

- Renovation project: various offices and houses - Energy efficiency (power and heating), utilities and administrative expenses cost saving, reorganization and setting up local network and NAS;

- Completion of interior design and decoration, LED lighting installation, of attic apartment in Dolomites national park;

- Ongoing course of study to obtain certification Project Management Professional (PMP)®;

- Doing the best i can: charitable assistance, raise puppies, help various older persons in daily needs, assistance to friends that need suggestion/idea in energy saving and home sustainability, general building construction.

 

05/2011 - 03/2015:

- POLSKIE LNG Project -  Swinoujscie (POLAND)

A LNG Terminal is a facility to off-take and re-gasify liquefied natural gas and the terminal will enable the re-gasification of 7.5 bn m³ of natural gas annually.

Work description: materials supply, manufacturing, erection, testing and all activities to be performed for the execution of civil and mechanical works to construct n° 18 buildings (Antiblast control room, electrical substation, compressor, storage, gate).

Main activities performed on site:

Earthworks: site preparation and area levelling, excavation for deep foundations, all earthworks related;

Underground piping, electrical and instrumental cables;

Foundation for: concrete and steel buildings, steel tanks and vessels, piping support, pumps, gas compressors, water heating boilers, air cooler and cooling system supports;

Concrete basins for: overflow water treatment plant (sludge basin, storage basin) ;

Reinforced concrete structure and masonry works for civil and industrial buildings (total area over 5000m2);

Steel works: main steel structure for industrial buildings and pipe rack (total area over 8000m2);

Finishing works: plastering and painting, gypsum walls, false floors and ceilings, tiling works, doors and windows, insulation.

 

- Air Separation Unit IV at AirProducts – Gent (BELGIUM)

Air Separation Unit (ASU 4) separates atmospheric air into its primary components, nitrogen and oxygen.

Work description: materials supply, manufacturing, erection, testing and all activities to be performed for the execution of civil and mechanical works.

Main activities performed on site:

Earthworks / demolitions / backfillings and  soil substitution;

Fundex piles;

Concrete works;

Foundations for buildings, equipments, pipe-rack and steel structures;

Prefabricated column;

Underground piping installation;

Roads and yards

Project Manager for Solesi S.p.A. IREM Group

 

Key Responsibilities:

- Project Implementation and Management;

- Leadership, integrity, loyalty and performance management;

- Scheduling the project in logical steps and budgeting time required to meet deadlines;

- Preparing contracts and negotiating revisions, changes and additions to contractual agreements;

- Conferring with supervisory personnel, owners, contractors and design professionals to discuss and resolve matters such as work procedures, complaints and construction problems;

- Procurement & Contracting;

- Claim (Economical, Financial) prevention from Sub Contractors by implementation of specific contractual provisions tailored to the cases;

- Support and manage a team of engineers, supervisors, contracts and safety personnel, along with sub-contractors instilling a safety first culture, drive a high level of Client satisfaction and excellence in project delivery;

- Interpreting and explaining plans and contract terms to administrative staff, workers and clients;

- Construction as supervision of work in relation to disciplines such as Civil, Mechanical, Steel structure;

- Review QA / QC Programme;

- Physical/Economical progress of work on a monthly basis with the regular issue of the relevant reports;

- Processing of Certificates of Payment on the basis of monthly progress;

- Preparation and issue of Provisional and final Acceptance Certificates of the Works;

- Monitoring and implement HSE Programme;

- Representation of the Company in the capacity of Resident Manager;

- Relationships with the Customer and his Consultant during the course of the project;

- Taking charge of situations and giving problem solving direction.

 

02/2007 - 05/2011:

-CCHP  plant at ITT Industries – Barge (CN)- 6MWe + 4,5MWt+3MWf.

-CCHP  plant at SEVEL – Atessa (CH) – Civil works

-CCHP  plant at FERRARI – Maranello (MO) – 17 MWe + 8MWt + 5 MWf.

-Revamping of water and liquid waste plant at SEVEL – Atessa (CH).

CCHP (Combined Cooling, Heat and Power) are those combining different machines and technologies to generate efficiency and deliver to the customer different energy carriers and industrial fluids, necessary for its production cycle.

Work description: Lump Sum Turn Key  project with equipment, engine and materials supply, manufacturing, erection, testing, commissioning and start up.

Performed all civil, mechanical, electrical, instrumental activities.

Site manager for EDF Fenice S.p.A.

 

Key Responsibilities:

Provide leadership and project direction;

Manage and direct operations associated with Supply, Production Control, and Quality Assurance/Control;

Directs completion of assigned tasks within estimated time frames and budget constraints;

Schedules and assigns duties to subordinates and subcontractors – ensures assignments are completed as directed and to standard;

Enforces work standards and reviews/resolves work discrepancies to ensure compliance with contract requirements;

Interfaces with the Contractor’s;

Supervises and manages the daily activities of construction;

Optimizes planning, operations, and resources to ensure maximum capability is attained.

 

03/2002 – 02/2007

-CHP   plant EniPower at Ferrara (FE)-  2x400MWe (Gas turbine + HRSG + steam turbine) / Building / civil works.

CHP (Combined Heat and Power) Similar to the CCHP but without production of cold water

Work description: Lump Sum Turn Key  project with equipment, turbine and materials supply, manufacturing, erection, testing, commissioning and start up.

 

-Sea Water Conversion Project – Qurayyah Al Khobar (SAUDI ARABIA)

In the oil industry, sea water injection is where water is injected into the oil reservoir to increase and stimulate the oil recovery.

Work description: Lump Sum Turn Key  project with equipment, engine and materials supply, manufacturing, erection, testing, commissioning and start up.

 

-CHP  plant EniPower at Ferrera Erbognone (PV) - 2x390 MWe + 1x250 MWe (Gas turbine + HRSG + steam turbine) / Building / civil works.

CHP (Combined Heat and Power) Similar to the CCHP but without production of cold water

Work description: Lump Sum Turn Key  project with equipment, turbine and materials supply, manufacturing, erection, testing, commissioning and start up.

Civil and mechanical superintendent for Snamprogetti S.p.A.

 

Key Responsibilities:

Coordinates the activities of contractors performing civil and mechanical works.

Ensures contractor personnel are trained and knowledgeable of specifications and work procedures; that material is being utilized to ensure optimum efficiency; and that the work being performed is in conformance with specified quality requirements.

Monitor day to day Contractor’s field activities as to its conformance to design documents, specifications, standards, and codes.

Evaluate workforce against progress achievement. Maintain effective schedule and cost control of works.

Assist with resolutions to Contractor queries

Assist Contractor’s with the execution of their quality program – inspection, testing, and record retention.

Ensure Contractor’s adherence to project safety program and plays an active role in the development of the safety culture on the project.

Review safety task analysis and work permits. Attend safety toolbox meetings.

Ensuring that all scope changes are quickly and properly documented, and that change orders are approved prior to the performance of the work.

Attend weekly progress review meetings.

Assist quantity surveyors in measurement of progress and installed quantities.

 

10/2000 – 02/2002  

-H & CO plant at EniChem Porto Marghera (VE) Civil superintendent for Linde AG Munich (D)

-Civil project construction:  Bridge on SP 99 S. Genesio (BZ),  Bridge

Kaltenhauser Chienes (BZ), Revamping of Padua hospital, various industrial buildings.

Freelance

 

01/1999 – 10/2000

-Regional Metro railways S.F.M.R. 2nd Fase; Regione del Veneto.

-Regional Metro railways S.F.M.R. 1st Fase; Regione del Veneto.

-Cost definition of claim n° 2 for construction of Istituto di Riposo per Anziani at Selvazzano (PD).

-Cost definition of claim for construction of Mestre (VE) “Carbonifera” West highway

  junction at Marghera city - Società delle Autostrade di Venezia e Padova S.p.A.

 Civil supervisor for NET engineering S.p.A.

 

01/1997 – 01/1999

-CHP plant  ISAB Energy - ERG Petroli– Priolo (SR)

Civil supervisor for Snamprogetti S.p.A.

 

01/1996 - 12/1996

-Gumusova – Gerede highway - Turkey Ministry of transport- Bolu (TURKEY)

Quantity surveyor  for Astaldi S.p.A.

 

09/1991 – 12/1995

- LLDPE n° 2 Expansion Project - QAPCO - Umm Said (QATAR)

- Utilities Expansion Project - QAPCO - Umm Said (QATAR)

- Revamping LLDPE plant - B.I.P.C. - Bandar Iman (IRAN)

- Construction of Ethilene Oxide & Ethilene Glicole - AR.P.C. - Arak (IRAN)

Technical office and quantity surveyor for Fochi Petrolchimica S.p.A.

 

06/1986 – 09/1989

Various construction sites

Surveyor for Italtop S.r.l.

 

Other

I’m available for mission and transfer