Hangar Const Pics P2

Grading has begun for the paving, north side (11.01.2012)

Building up the grade (11.01.2012)

Bringing the north side grade up to the floor (11.01.2012)

The southwest bay is right at grade (11.01.2012)

The paving is completed, north side (11.03.2012)

West side lane (11.03.2012)

The south side awaits one more small load (11.02.2012)

Instant hot water boiler and in floor heat (11.08.2012)

Southeast bay, man doors and facade (11.10.2012)

Everyone at work (11.20.2012)

Insulation between bays (11.20.2012)

Doors installation in progress (11.21.2012)

Tweaking the doors (11.28.2012)

4 of the 8 propane bottles (11.28.2012)

A pano of Vihn, Paul and Tom's hangar (02.25.2013)

Our new sign on the fence (03.06.2013)