Vision and Wish List

If you wish to contribute to one or more of the wish list items below, email Coach Norwood at tnorwood@wcpss.net.  Thanks for your continued help and support!

Field Improvements so far:

New coat of paint for backstop poles

New layer of screenings on the warning track

New batter's box mat for on - field BP

Signs updated for 2013

Installed 3 new black flag poles behind center field with new flags

Lips removed around infield and home plate

"M" wall re-painted

New infield pattern at 1B and 3B

New arm care equipment

Upgraded home bleachers purchased and installed

Upgraded PA and sound systems

New picnic table

New nets in the entire cage area

New paint job on dugouts and press box (2018)

New Gator

New batting practice turtle

Infield laser leveled and dirt added (2018)

Mound rebuilt (2018)

New "MILLBROOK" padding behind home plate (2019)

New foul poles (2020)

New shed in LF (2020)

Improvements to concession stand (2020)

New outfield windscreen (2020)

Addition of 160 tons of infield clay/sand mix (2022)

Repair/Rebuild Pitcher's mound (2023)


Facilities Vision:

Remove gravel screenings and install crushed brick outside of playing surface

Sod in the walk-up paths to home plate from the dugouts

Repair lip that has been created from water run-off

Improve the batting cage area. New cage nets, cover, and turf entire area

Clubhouse behind home dugout to include player foot lockers, coaches office, rec area, press box.

Install turf halo with Millbrook logo

Replace backstop with permanent bleachers.

New 3-wheeler bunker rake for field maintenance