If you wish to contribute to one or more of the wish list items below, email Coach Norwood at tnorwood@wcpss.net. Thanks for your continued help and support!
Field Improvements so far:
New coat of paint for backstop poles
New layer of screenings on the warning track
New batter's box mat for on - field BP
Signs updated for 2013
Installed 3 new black flag poles behind center field with new flags
Lips removed around infield and home plate
"M" wall re-painted
New infield pattern at 1B and 3B
New arm care equipment
Upgraded home bleachers purchased and installed
Upgraded PA and sound systems
New picnic table
New nets in the entire cage area
New paint job on dugouts and press box (2018)
New Gator
New batting practice turtle
Infield laser leveled and dirt added (2018)
Mound rebuilt (2018)
New "MILLBROOK" padding behind home plate (2019)
New foul poles (2020)
New shed in LF (2020)
Improvements to concession stand (2020)
New outfield windscreen (2020)
Addition of 160 tons of infield clay/sand mix (2022)
Repair/Rebuild Pitcher's mound (2023)
Facilities Vision:
Remove gravel screenings and install crushed brick outside of playing surface
Sod in the walk-up paths to home plate from the dugouts
Repair lip that has been created from water run-off
Improve the batting cage area. New cage nets, cover, and turf entire area
Clubhouse behind home dugout to include player foot lockers, coaches office, rec area, press box.