Maintenance/Refit

Maintenance/Refit - 1995 Through 2010

Fore Deck

•    (2009) Windshield wipers were replaced

•    (2008) Sand and Sikkens Teak Deck

•    (2008) Strip and Varnish Toe Rails

•    (2000) Replaced cushion on storage boxes

•    (1999) Replace Caulk in Teak Deck

•    (1999) Apply 7 coats of Sikkens to Teak Deck

•    (1997) R & R all rail posts, fittings and cleats and re-chrome

•    (1997) Cabin top repaired and painted

Aft Deck

•    (2010) Strip and Varnish Toe Rails

•    (2009) Refinish furniture

•    (2006) Varnished bar and helm areas

•    (1998) Installed EZ2CY Enclosure on double track

•    (1998) Installed lower canvas curtain on stainless frame

•    (1998) Strip and apply 10 coats of varnish to hand rails

•    (1995) Replaced furniture

Transom

•    (2008) Sand to wood and apply 8 coats of varnish

•    (2008) R & R Swim Platform and apply 8 coats of Sikkens

•    (2008) Paint swim platform brackets

•    (2008)  Varnish & Sikkens ladder

•    (1996) Replaced top board on transom

Above water line hull work

•    (2008) Paint Rub Rail

•    (2003) Sand hull, clean seams and paint

Below water line hull work

•    (2010) Sand smooth and paint bottom with VC-17 Offshore

•    (2010) Replaced one damaged plank at stern

•    (2009) Replaced one bottom plank

•    (2006) Replaced chine boards

•    (1999) Sand to bare wood and paint with VC-17

Cabin

•    (2010) New Carpet throughout

•    (2009) Installed Wine Cooler and Custom Desk

•    (2006) Re-Upholstered swivel bucket chairs

•    (2005) Varnish all mahogany and cabin door

•    (2003) Replaced all bedspreads and linens

•    (2000) Painted aft staterooms

•    (1998) Installed window blinds and valances

•    (1995) Replaced all mattresses

Galley

•    (2004) Counter tops and table were replaced

•    (2004) Galley sink faucet replaced

•    (2003) Refrigerator was replaced

•    (1996) Varnished mahogany

Heads

•    (2005) Install teak & holly in aft head

•    (2004) Installed new counter tops

•    (2004) Installed new shower

•    (2004) Replaced faucets

•    (2000) Replaced showerhead

•    (2000) Painted & Varnished

•    (1997) Forward and Aft Head toilets replaced

Holding Tank

•    (1997) Installed new stainless tank for forward head

Engine Room

•    (2005) 110v engine room blower replaced.

•    (2001) Installed Halon Fire Extinguisher System

•    (1997) Bilge’s and Engine room was painted

•    (1997) Oil changer installed

•    (1997) Light fixtures replaced

Bilges

•    (2009) Removed and clean bilge pump in lazarette 

•    (2009) Install new bilge pump in engine room

•    (Annually) Clean all bilges and check pumps, floats and switches

Engines

•    (2008) Sea water impellers replaced

•    (2006) Water hoses and clamps replaced

•    (2005) Transmission Oil Coolers installed

•    (1997) Tachometers reworked to electronic

•    (1997) Motors and Transmissions replaced

•    (1997) Installed Groco water strainers

•    (1997) Shift & Throttle cables replaced

•    (1997) Fuel strainers were installed

Props, Shafts and Bearings

•    (2009) Props were replaced with new bronze 24X 20

•    (2005) Starboard and Port shaft stuffing boxes repacked

•    (1997) Forward shafts replaced with stainless steel

•    (1999) All cutlass bearings were replaced both starboard and port

Generator

•    (1997) Replaced 10kw Onan generator

•    (1997) Installed Groco water strainer

•    (2009) Onan generator muffler and exhaust hose replaced

Battery system

•    (2007) All batteries were replaced

•    (2003) Replaced (1) 12-volt charger

•    (1997) Battery wiring were replaced

Electronics/Helm

•    (2006) Raytheon 601XX Chart Plotter was installed

•    (2006) Raytheon Auto Pilot Course Computer replaced

•    (2006) Searchlight was taken apart, lubed, re-chromed and reinstalled

•    (2000) Replaced VHF Antenna

•    (1995) Raytheon 40XX Radar installed

•    (1995) Raytheon 600XX Chart Plotter installed

•    (1995) Raytheon 398 GPS/Loran installed

•    (1995) Raytheon 650 Auto Pilot installed

•    (1995) Raytheon 202 VHF with Hailer installed

•    (1995) Raytheon Tri-Data (Depth, Speed, Temperature) installed

•    (1995) Engine Synchronizer installed

AC/Heating

•    (1999) Three new Cruisair Cooling and Heating units were installed.

•    16k BTU in Salon

•    10k BTU in Aft Staterooms

•    7k BTU in Forward Stateroom, Installation included

•    Strainer installed on supply side of pump

•    New wiring to each unit

Domestic Water System

•    (2009) Water pump replaced

•    (1999) Replaced shower pump

•    (1997) New 20 gallon water heater installed