Publications
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Editor and Reviewer and Responsibilities
1. Editorial Board of International Journal of Project Management (SSCI)
2. Reviewer for International Journal of Production Research (SCI)
3. Reviewer for Journal of Business Economics and Management (SSCI)
4. Reviewer for IEEE Transactions on Engineering Management (SSCI)
5. Reviewer for Supply Chain Management: An International Journal (SSCI)
6. Reviewer for International Journal of Project Management (SSCI)
7. Reviewer for Project Management Journal (SSCI)
8. Reviewer for International Journal of Production Economics (SCI)
9. Reviewer for Journal of Management in Engineering (SCI)
10. Reviewer for Journal of Construction Engineering and Management (SCI)
11. Reviewer for Construction Management and Economics (EI)
12. Reviewer for Journal of Global Business and Technology (Scopus, ProQuest)
13. Reviewer for International Journal of Information Systems for Logistics and Management
Representative Publications
Chen, H. L. 2023. Influence of supply chain risks on project financial performance. International Journal of Production Economics, 260, 108870. (SCI, 2021 Impact Factor: 11.251, Ranking: 2/87, top 2.30% in Operations research & Management science)
Chen, H. L. 2021. Impact of Industry 4.0 on corporate financial performance: A moderated mediation model. Sustainability, 13(11), 6069. (SSCI, SCI, 2021 Impact Factor: 3.889, Ranking: 35/47 in Green & Sustainable Science & Technology, 133/279 Q2 in Environmental Science)
Chen, H. L. 2018. Supply chain risk's impact on corporate financial performance. International Journal of Operations & Production Management, 38(3), 713–731. (SSCI, 2021 Impact Factor: 9.360, Ranking: 27/228, top 11.84% in Management)
Chen, H. L. 2015. Performance measurement and the prediction of capital project failure. International Journal of Project Management, 33(6), 1393–1404. (SSCI, 2021 Impact Factor: 9.037, Ranking: 29/228, top 12.72% in Management)
Chen, H. L. 2014. Improving forecasting accuracy of project earned value metrics: Linear modeling approach. Journal of Management in Engineering, 30(2), 135-145. (SCI, 2021 Impact Factor: 6.415, Ranking: 14/50, Q2 in Engineering, Industrial)
Chen, H. L. 2012. Empirical behavioral analysis of project contractors' supply-chain payment terms. Supply Chain Management: An International Journal, 17(3), 277-289. (SSCI, 2021 Impact Factor: 11.263, Ranking: 11/154, 7.14%% in Business; 12/228, 5.26%% in Management)
Chen, H. L. 2010. Using financial and macroeconomic indicators to forecast sales of large development and construction corporations. Journal of Real Estate Finance and Economics, 40(3), 310-331. (SSCI, 2021 Impact Factor: 1.480, Ranking: 90/111 in Business Finance; 257/381 in Economics)
Chen, H. L., 2007. Developing cost response models for company-level cost flow forecasting of project-based corporations. Journal of Management in Engineering, 23 (4), 171-181. (SCI, 2021 Impact Factor: 6.415, Ranking: 14/50, Q2 in Engineering, Industrial)
Selected Journal Publications
Chen, H. L. 2023. Influence of supply chain risks on project financial performance. International Journal of Production Economics, 260, 108870.
Chen, H. L. 2023. Communication capacity and project performance: The mediating role of managerial capacity. Journal of Survey in Fisheries Sciences, Special Issue, 10(IS), 3970-3973.
Chen, H. L. 2021. Impact of communication on capital project performance: A mediated moderation model. Sustainability, 13(20), 11301. (This paper belongs to the Section of Sustainable Management.)
Chen, H. L. 2021. Early identification of distressed capital projects: A longitudinal approach. International Journal of Managing Projects in Business, 14(5), 1185-1201.
Chen, H. L. 2021. Impact of Industry 4.0 on corporate financial performance: A moderated mediation model. Sustainability, 13(11), 6069. (This paper belongs to the Section Economic and Business Aspects of Sustainability.)
Chen, H. L. 2020. Using a modified Altman’s Z-score model to predict corporate bankruptcy. Journal of Business and Economics, 11(10), 1081-1089.
Chen, H. L. 2020. Corporate bankruptcy measurement and prediction: Evidence from publicly traded US firms. Journal of Business & Economic Policy, 7(1), 100–113.
Chen, H. L. 2020. Comparative analysis between company and industry-relative financial ratios: The case of bankruptcy forecasting. Journal of Business and Economic Management, 8(4), 70-79.
Chen, H. L. 2019. Using financial and economic leading indicators to predict sales of publicly traded companies. International Journal of Management and Applied Science, 5(6), 58–63.
Chen, H. L., Lin, Y. L. 2018. Goal orientations, leader-leader exchange, trust, and the outcomes of project performance. International Journal of Project Management, 36(5), 716–729.
Chen, H. L. 2018. Supply chain risk's impact on corporate financial performance. International Journal of Operations & Production Management, 38(3), 713–731.
Chen, H. L 2018. Early prediction of project duration: A longitudinal study. Engineering Management Journal, American Society for Engineering Management, 30(3), 191-202.
Chen, H. L. 2018. Development of a stable corporate bankruptcy classification model: Evidence from Taiwan. International Journal of Economic Sciences, 7(13), 713–731.
Chen, H. L 2018. Influences of Early-stage project variables on project performance. International Journal of Management and Applied Science, 4(12), 49–54.
Chen, H. L. 2017. Performance measurement and forecasting of failing manufacturing companies. International Journal of Management & Computing Sciences, 6(1), 32-39.
Chen, H. L., Chen, W. T., Lin, Y. L. 2016. Earned value project management: Improving the predictive power of planned value. International Journal of Project Management, 34(1), 22–29.
Chen, H. L. 2016. Impact of early stage project-management performance on the cost performance of capital projects. Journal of Business and Policy Research, 11(1), 62–71.
Chen, H. L. 2015. Performance measurement and the prediction of capital project failure. International Journal of Project Management, 33(6), 1393–1404.
Chen, H. L. 2014. Innovation stimulants, innovation capacity, and the performance of capital projects. Journal of Business Economics and Management, 15(2), 212-231.
Chen, H. L. 2014. Improving forecasting accuracy of project earned value metrics: Linear modeling approach. Journal of Management in Engineering, 30(2), 135-145.
Wei, N. C., Chao, I. M., Liuand, C. J., Chen, H. L. 2014. Applying branch-and-bound and petri net methods in solving the two-sided assembly line balancing problem. International Journal of Mechanical, Industrial Science and Engineering, 8(1), 145-150.
Chen, H. L. 2013. Logit models for early warning of distressed capital projects. Journal of Business Economics and Management, 14(sup1), 145-167.
Chen, H. L., Chen, C. I., Liu, C. H., Wei, N. C. 2013. Estimating a project’s profitability: A longitudinal approach. International Journal of Project Management, 31(3), 400-410.
Chen, H. L. 2012. Empirical behavioral analysis of project contractors' supply-chain payment terms. Supply Chain Management: An International Journal, 17(3), 277-289.
Chen, H. L. 2011. An empirical examination of project contractors' supply-chain cash flow performance and owners' payment patterns. International Journal of Project Management, 29(5), 604-614.
Chen, H. L. 2011. Predictors of project performance and the likelihood of project success. Journal of International Management Studies, 6(2), 101-110.
Chen, H. L., Chen, W. T., Wei, N. C. 2011. Developing a cost-payment coordination model for project cost flow forecasting. Journal of Civil Engineering and Management, 17(4), 494-509.
Chen, H. L. 2010. Using financial and macroeconomic indicators to forecast sales of large development and construction corporations. Journal of Real Estate Finance and Economics, 40(3), 310-331.
Wei, N. C., Mejabi, O. O., Chen, H. L. 2010. An iterative clustering approach based on material flow requirements for cellular designs. Journal of Intelligent and Robotic Systems, 60(3-4), 493-511.
Chen, H. L., 2009. Model for predicting financial performance of development and construction corporations. Journal of Construction Engineering and Management, 135(11), 1190-1200.
Chen, C. I., Chen, H. L., Chen, S. P. 2008. Forecasting of foreign exchange rates of Taiwan’s major trading partners by novel Nonlinear Grey Bernoulli Model NGBM (1, 1). Communications in Nonlinear Science and Numerical Simulation, 13(6), 1194-1204.
Chen, H. L., 2007. Developing cost response models for company-level cost flow forecasting of project-based corporations. Journal of Management in Engineering, 23 (4), 171-181.
Chen, H. L., Chen, W.T. 2005. Clarifying the behavioral patterns of contractor supply chain payment conditions. International Journal of Project Management, 23(7), 463-473.
Chen, H. L., O'Brien, W. J., Herbsman, Z. 2005. Assessing the accuracy of cash flow models: the significance of payment conditions. Journal of Construction Engineering and Management, 131(6), 669-676.
Selected Refereed Conference Papers
Chen, H. L. 2022. Project technological capacity and project outcomes: The moderating role of team creativity. International Conference on Science, Innovation and Management, Orlando USA. July 17-18.
Chen, H. L. 2021. Industry 4.0 maturity as a moderator of Industry 4.0’s impact on company financial performance. 6th North American Conference on Industrial Engineering and Operations Management Conference (IEOM), Monterey, Mexico, November 3-5.
Chen, H. L. 2021. A multivariate logit model for corporate bankruptcy forecasting. International Conference on Economics and Business Research, Toronto, Canada.
Chen, H. L. 2021. Development of an industry-relative model for bankruptcy forecasting. International Academic Conference on Economics, Business Management & Social Sciences, Toronto, Canada.
Chen, H. L. 2020. Impact of early-phase project variables on project customer satisfaction. International Conference on Science, Technology, Engineering and Management (ICSTEM), Toronto, Canada. (Best Paper Award)
Chen, H. L. 2019 (Section Chair). The influence of early stage project performance: Some project performance and outcome correlate. 4th North American Conference on Industrial Engineering and Operations Management Conference (IEOM), Toronto, Canada, October 23-25, 2019. (Best Track Paper Award).
Chen, H. L. 2019. Predicting corporate financial distress: Evidence from Taiwan. International Conference on Economics and Finance Research (ICEFR), Toronto, Canada. (Best Paper Award)
Chen, H. L. 2018. Estimating Business financial distress for Publicly Listed Companies in Taiwan. International Conference on Business Policy and Strategy Management 2018, August 17-18, 2018, Toronto, Canada.
Chen, H. L. 2018. Early project-management performance and project outcomes correlate. 8th International Conference on Industrial Engineering and Operations Management (IEOM), Bandung, Indonesia, March 6-8, 2018, Bandung, Indonesia (Best Track Paper Award).
Chen, H. L. 2018. Prediction of project completion time using robust time series regression. 8th International Conference on Industrial Engineering and Operations Management (IEOM), Bandung, Indonesia, March 6-8, 2018, Bandung, Indonesia.
Chen, H. L. 2016. Assessing the impact of project-management performance on project outcomes. 36st International Business Research Conference, Toronto, Canada.
Chen, W. T., Jian, J. B., Chen, H. L. 2015. Building management performance assessment using data envelopment analysis. International Conference on Operations Excellence and Service Engineering, Orlando, USA.
Chen, H. L., Chen, W. T. 2014. Estimating the probability of distress for capital projects. 2014 International Conference on Economics Marketing and Management, 62-67, Toronto, Canada.
Chen, H. L., Huang, S. Y., Cheng, Y. L. 2013. Predicting financial distress likelihood for manufacturing firms. 2013 Proceedings of the International Journal of Arts and Sciences Conference, 345-351, Toronto, Canada.
Chen, H. L. 2012. The impact of innovation capacity on the cost performance of capital projects. Global Business and Technology Association’s Fourteenth Annual International Conference, 95-105, New York City, USA.
Chen, H. L. 2011. The impact of payment terms on project contractors' contracting behavior. 2011 Global Business & International Management Conference, 70-75, Seattle, USA.
Chen, H. L. 2010 (Section chair). A prototype system of coordination mechanisms for project cost flow forecasting. International Conference on Enterprise Information Systems and Web Technologies, 98-103, Orlando, USA.
Chen, W.T., Chen, H.L., Chang, P.Y. 2009. Design satisfaction for school construction in Taiwan- A user-based measurement. International Symposium CIB-W096 2009 Taiwan, Tainan, Taiwan.
Chen, H. L. 2009. A longitudinal cross-sectional analysis of the relationships between sales flows and financial and macroeconomic variables. International Conference in Management Sciences and Decision Making, 89-96, Taipei, Taiwan.
Chen, H. L. 2008. Developing sales response models for technological product sales forecasting. International Conference on Enterprise Information Systems and Web Technologies, pp. 120-126, Orlando, USA.
Chen, H. L. 2007 (Section chair). Integrated cost-payment-schedules model for project cost flow predictions and management. The 8th Asia Pacific Industrial Engineering & Management System, p. 238 (11 pages), Kaohsiung, Taiwan.
Chen, H. L. 2007. Analyzing the contractors’ supply chain payment conditions. Sixth Annual SCALE Conference on Supply Chain Optimization, p.9 (10 pages), Florida, USA.
Chen, H. L. Chen, W. T. 2006. Combining time series and multivariate regression analysis for sales predictions. Society of Advanced Management (SAM) 2006 International Business Conference, pp.1370-1377, Florida, USA.