Design Process
The initial idea was to create a flowing space around the trees. So all the activities are done around the trees. All the programs are placed in such a manner besides the existing pathway in the forest, so it is easily accessible from all the sides. The intervention includes admin space, resource centre, workshop, amphitheatre, cafeteria and shops. The shops are built as an extension to the cafeteria. Amphitheatre which is a open space act as a gathering space for nearby people can use it for their jamming session and to perform various activities.
Overall Plan
Roof Plan
Resource and admin office:
Cafeteria:
Workshop
Costing
cost of construction=Cost of cons. for bamboo persqft+ Cost of cons for stone cft
=550 persft +134 percft
= 684 per sqft
Construction cost for admin office
= Area of office x cost of cons
=731 x 684
= Rs 5,00,004 + contengencies
=Rs 10,00,008
Construction cost for cafeteria
= Area of cafe x cost of cons
=538 x 684
= Rs 3,67,992 + contengencies
=7,35,984
Construction cost for Workshop
= Area of workshop x cost of cons
=430.5 x 684
= Rs 2,94,462 + contengencies
=Rs 5,88,924
Construction cost for amphitheater
= Area of amphitheater x cost of cons
= x 134
= Rs 172994 + contengencies
=Rs 345988
Construction cost for resource center
= Area of RC x cost of cons
=914 x 684
= Rs 6,25,176 + contengencies
=Rs 12,50,352
-Construction cost for shops
= Area of shops x cost of cons
=75 x 550
= Rs 443850 + contengencies
=Rs 8,87,700
Total cost of construction = 48,08,950