With Boric Acid
Chemical Binding that is effective and inexpensive but has inherent chemically bonded water content that may cause deterioration of the lining. Material position shown in red in the picture.
However, Follow our suggestions for Best Lining Practices to avoid any ill effects due to release of moisture during the sintering cycle.
All Furnace Capcity:
8MT to 15MT
15MT and above