PSU HET Proposals
PSU HET Proposals
Call for PSU HET Proposals: 2027-1 Trimester
Announced by email on 10/12/2026
The PSU HET TAC invites proposals for PSU HET time for the 2027-1 trimester, running from 2026 December 1 through 2027 March 31. Phase I proposals for this trimester are due by 5 pm (U.S. eastern standard time) on 2026 November 1 . Proposals submitted after the deadline but before the submission form is disabled will be summarily rejected and not reviewed by the TAC (one may still be able to submit after the deadline and one may get an email acknowledgement but such late proposals will not be forwarded to the TAC for review and the principal investigator will not receive any post-review notice). Please read the instructions below carefully and pay particular attention to the proposal submission roadmap.
During the 2027-1 trimester, the PSU TAC will be able to allocate 13, 38, 52, and 52 hours in priorities 0, 1, 2, and 3, respectively. Priority 4 time will be awarded for targets that can use poor seeing and/or non-spectroscopic sky conditions. Priority 4 targets will be charged only half of their exposure time and no setup time. There is no opportunity for long-term proposals at this time.
Please note the following for this proposal cycle:
Status of HPF: The regular maintenance of the Habitable Zone Planet Finder (HPF) should be completed soon and the instrument is expected to be back with its nominal capabilities for the 2027-1 trimester.
Need for LRS2 bright-time or filler targets: Such targets are very useful to fill holes in the queue. Bright targets can be observed during bright time, if other options are not available, or they can observed with short exposures to fill small gaps in the queue. Please consider submitting programs with such targets that can use P4 time.
The TAC encourages proposers to submit as early as possible and not "flirt with the submission deadline." The submission form is now pre-programmed to automatically stop accepting proposals exactly at the deadline, which is determined according to the clock of the Google servers. A proposal attempt that is even a second late will be blocked by the server.
Reminders for Target-of-Opportunity Proposals: As of the 2026-1 cycle, proposals requesting ToO time must include in the "Experimental Design" section of the proposal an estimate of the probability that the requested time will be used and explain the rationale behind that estimate. Moreover, ToO programs requesting P0 time must specify the required observing conditions to achieve the desired rapid response so that there is no ambiguity as to high the resident astronomers are supposed to respond. See the following sections (tabs) of this web site for more details:
Primer : See new entitled "Target-of-Oportunity (ToO) Observations"
Forms : See instructions in "Experimental Design" and "Description of Observations"
The current version of the proposal template and class file is v.24-5 (see the Forms tab). Pay particular attention to the instructions on the section entitled "Plan for Reduced Allocation."
The HETDEX conflict calculator, incorporated in the Object Observability and Feasibility Calculator, was updated to take into account the end of the HETDEX survey in the summer of 2024, Proposers who use the observability and feasibility calculator can turn off the HETDEX conflict checks.
As a matter of basic equity, everyone has to follow the same instructions and be held to the same standards. Please read the proposal instructions carefully and follow them. Here are some specific cautions:
Use the current proposal form, not any of the old versions.
Do not change the fonts or the margins (or any other formatting specification) of the proposal template. For example, the references and figure captions should have the same font as the main text.
Make sure that the figures and all their labels are clear and legible. It often happens that a figure is shrunk to fit into the space available with the result that the fonts shrink accordingly and the labels become illegible. Be careful to avoid this problem.
Do not go over the space allotted for particular sections of the proposal, not even by a single line.
Instruments and Priorities
The following instruments are available on the HET at this time:
LRS-2 (Low Resolution Spectrograph, Blue and Red cameras).
HPF (the Habitable Zone Planet Finder) is an extremely stable high resolution near-infrared echelle spectrograph. Proposers interested in doing precise radial velocity work with HPF should include a credible plan for deriving velocities from HPF data products and include HPF team members as co-Is.
VIRUS (Visible Integral-Field Replicable Unit Spectrographs) is a mature instrument but observations are still considered to be on a shared-risk basis because the instrument is complicated and (78 IFUs and 156 CCDs; not all of them will work perfectly all the time).
Please check the main HET web page (and links therein) for an overview and latest Phase II and published instrument information.
Note that Penn State’s P3 observations have a lower chance of being completed (~40%, based on historical weather patterns).
Roadmap for Preparing and Submitting a Proposal
The materials needed to put together and submit a PSU HET proposal are described in the Forms tab of this web site. Included are a number of documents with information and instructions (described briefly and linked directly below) as well as the LaTeX form needed for the science proposal.
Here are the main stages of the proposal preparation and submission process:
If you are not an experienced HET user, please start with the Primer tab. We also recommend that you consult the Hints & Tips tab for some useful advice.
Put together the science proposal and the target list as described in the Forms tab. At the end of this stage you should have produced a single, self-contained PDF file.
Follow the instructions on the Submission tab to submit your proposal (that is, the PDF file produced in the previous stage). The submission is carried out through this Google form. Upon successful submission, you will receive an email confirmation. The proposal must be submitted by the deadline given above. Late proposals should be automatically blocked by the server. At any rate, proposals received after the deadline and before the submission form is disabled will not be reviewed by the TAC (you may still be able to submit for a short period of time after the deadline and get an email acknowledgement but that does not mean that such proposals will be reviewed). Similarly, proposals that do not follow the instructions (e.g., the format is not right or files do not follow the proper naming conventions) may also be summarily rejected.