The primary purpose of the NSTX-U Research Program Advisory Committee (PAC-39) meeting was to help the NSTX-U team prepare for the DOE/SC Assessment of NSTX-U Mission Need (see below). The PAC-39 Report is downloadable from here.
The purpose of the DOE/SC Assessment Phase 1 was to evaluate PPPL's proposed organization, capability, and means to execute the NSTX-U Facility recovery plans and resume operations.
The purpose of the DOE/SC Assessment Phase 2 was to evaluate the continued Mission Need for the NSTX Upgrade facility and associated research program. Additional Science Mission documents are located here.
The final report from the DOE/SC Assessment of NSTX-U Recovery Plans (Phases 1 and 2) is downloadable from here.