PPISD

School Bond 2021

A long Range Plan Developed by the Community

Pilot Point ISD is Growing.

Over the next ten years, the Pilot Point ISD student body is going to more than double, adding nearly 2,000 new students to our classrooms. That is why PPISD, in partnership with 59 community members, developed the 2021 Pilot Point ISD School Bond. The proposal addresses the rapidly growing student population, makes our campuses safer and more secure, and prepares for the future needs of our school district.


Throughout this website, you will find more specific information about the 2021 school bond and what it means for the Pilot Point ISD community.


Pilot Point ISD Bond 2021 Overview

The bond will provide for the long-term needs of the district’s students by improving facilities, classrooms and learning environments. The proposal also increases safety and security measures district-wide to better protect students, teachers, and support staff.

Bond improvements to our campuses include:

Early Childhood Center

  • Fire sprinkler system installation

  • HVAC system replacement

  • Roof replacement

  • Additional covered area for student drop-off and pick-up

  • Renovate toilet rooms

  • Replace doors and hardware

  • Improve building systems and site drainage

Middle School

  • Secured entry vestibule installation

  • Roof replacement

  • Upgrade HVAC system

  • Replace Doors & Hardware

  • Renovate Locker Rooms

  • Renovate Toilet Rooms

  • Improve building systems and site drainage

High School:

  • Secured entry vestibule installation

  • Renovate Toilet Rooms

  • Roof replacement

  • Upgrade HVAC System

  • Improve building systems and site drainage

  • Renovate plumbing in Field House area

  • Replace doors in Field House area

Additional:

  • Transportation Facility – Bond 2021 includes the construction of a new facility that will allow additional space for buses to enter and exit, refuel, and maintenance

  • Land Acquisition – Purchasing land for multiple future school sites to accommodate district growth