Mahwah Public Schools are well-maintained, but the time has come for us to replace and upgrade the systems and structures that keep our schools running.
Proposed improvements would benefit all six schools in the district. State aid, which is available with voter approval, would offset the project costs.
Upgrade roofing and HVAC systems to boost efficiency and reduce the need for costly emergency repairs
Replace aluminum sliders to improve functionality and energy efficiency
Replace boilers that are at or near the end of their useful life
Refurbish/renovate auditorium, including the original seating from the 1950s, to enhance student and community experience
Replace stadium field turf that is at the end of its useful life and add turf to a second field with athletic field lighting to better serve students and the community
Update existing field lighting with LED lighting
Build a new, second gym to better serve students and the community
Upgrade roofing and HVAC systems to boost efficiency and reduce the need for costly emergency repairs
Repair exterior brickwork to maintain and preserve the building
Replace bleachers in gym
Add turf to soccer field with athletic field lighting to better serve students and the community
Upgrade and recoat sections of roofing and replace HVAC systems to boost efficiency and reduce the risk for leaks
Replace four boilers that are at or near the end of their useful life
Repoint exterior brickwork to maintain and preserve the building
Build a new gym, media center and music room to better serve the students and community
Apply new coating to roof to reduce the risk for leaks and extend roof warranty
Replace selected windows and four boilers to boost efficiency
Replace kitchen hood
Repoint exterior brickwork to maintain and preserve the building
Build a new gym to better serve the students and community
Apply new coating to roof to reduce the risk for leaks and extend roof warranty
Replace glazing/gasketing on windows to reduce degradation of window system
Upgrade temperature controls to improve efficiency
Upgrade roofing and HVAC systems to boost efficiency and reduce the need for costly emergency repairs
Replace selected windows and doors to enhance security and efficiency
Create a designated space for the 18-21-year-old special needs program to help students build life skills
Repair chimney to maintain and preserve the building
Recoat roofing and upgrade HVAC systems to reduce the risk for leaks and boost efficiency
Repair chimney to maintain and preserve the building
Replace roof and upgrade HVAC systems to boost efficiency and reduce the need for costly emergency repairs
Provide back-up boiler
Repair chimney to maintain and preserve the building
Replace roof and upgrade HVAC systems to boost efficiency and reduce the need for costly emergency repairs
Provide back-up boiler
Repair chimney to maintain and preserve the building
Recoat roof and upgrade HVAC systems to boost efficiency and reduce the risk for leaks
Provide back-up boiler
(On the High School campus)
Recoat roof and reduce the risk for leaks and extend roof warranty
Install dedicated and addressable fire alarm system to enhance building safety
The multipurpose room at Betsy Ross is used for morning drop off, physical education, lunch, and more.
Failed window glazing at Lenape Meadows.
Old and rusted rooftop unit at Joyce Kilmer.
Mahwah High School stairs are crumbling.
Betsy Ross's media center is a small trailer.
The multipurpose room at George Washington is used for morning drop off, physical education, lunch, and more.
Old windows and HVAC unit at Joyce Kilmer School.
Crumbling entrance at Mahwah High School.
The ramp would be removed and the front entrance would be renovated at Mahwah High School.
Obsolete HVAC unit at Mahwah High School.
The original chairs from the 1950s in Mahwah High School's auditorium would be replaced.
Old rooftop HVAC unit at Ramapo Ridge.
Evidence of roof leaks at Ramapo Ridge.
Leaky roofs at George Washington.
Leaky roofs at Mahwah High School.
Leaky roofs at Joyce Kilmer.