RECENT PROJECTS












City of Chandler | Completion: January 2020

This project was a new well capable of delivering water to the potable or reclaim water networks. Jensen Systems provided all the controls systems engineering, PLC software, construction administration, and start-up services. The budget for this project was cut after the initial design, so several items were marked for "future" projects.

Learn more









City of Chandler | Completion: January 2020

This is a project that started out with one set of goals, but was changed on the fly to accommodate additional long-term objectives. Ultimately, the City achieves a much higher level of control systems redundancy and a whole new set of diagnostic tools.

Learn more





Previous Projects we've worked on:

  • Nfusion Unit 30-0001
  • Mission Estates LS
  • Gilbert Mods
  • Reservoir Integration CM
  • Reservoir Integration
  • Firestation Well
  • Old Pecos Lift Station
  • Riggs Well
  • Maryland Booster Emergency
  • Hahn WPF
  • West Pecos Well
  • Hillcrest Well
  • Iris & McDermott Wells
  • Ocotillo Blowers
  • Force Main
  • O A Lift Station
  • Palm Valley Scada
  • Palm Valley WRF
  • Intel Valves
  • Dobson South Booster
  • WPF Mods
  • Florence Service
  • PRV Station
  • Intel Flowmeters
  • Navajo Casinos Water & WW Systems
  • Florence Flowmeter
  • Alamosa Well 4
  • Appleby Well
  • Ocotillo Improvements
  • Chandler PLC Replacement at 65 sites
  • Florence Rodeo Well
  • Water Quality Monitoring Stations
  • WW On Call
  • Alamosa Wells 2 & 3
  • Florence WTP Power
  • Florence Flow Metering
  • Florence North WWTP Dechlor
  • Basha Wells
  • Rural Road Booster
  • Airport Booster
  • Colt Booster
  • McQueen Booster
  • Sanger Power
  • Gila Bend Service
  • GE California Power Plants
  • Avondale WRF Phase 1
  • Industrial Refrigeration SCADA Reports
  • Verco Maintenance
  • Florence Johnson
  • CAP Documentation
  • Florence WWTP CA
  • Gold Canyon Maintenance
  • GE Energy Mexico LYF
  • Scottsdale Miramonte
  • Gilbert WWTP CW
  • Florence WWTP
  • Avondale WWTP Expansion
  • 3 Turnouts
  • Avondale WWTP Expansion
  • Tolleson Booster Pump Station 7
  • Gila Bend RO
  • Denver Basin Pump Station
  • Gilbert Booster Pump Station
  • Bullhead City Booster Station
  • Gilbert Reclaim Line
  • COP Booster Station 3A-2B
  • COP 24th Street Chlorine Scubber
  • Fresno Cogen
  • Algonquin Maintenance
  • Boulders WTF Flowmeter
  • Verco Misc Upgrades
  • Verco Replace PanelView
  • Alamosa Booster Station
  • Wells Arsenic Treatment
  • Waste Flow Monitoring
  • Verco Adjust Valve Parameters
  • Avondale I&C Upgrades
  • Algonquin Indian Basket Alarm
  • Algonquin New River Alarm
  • LIPSCO Alarm
  • Avodale Master Plan
  • Lake Elsinor & Canyon Lake Aeration
  • Val Vista Carbon Dry Feeder
  • Deer Valley Minor Mods
  • BMS Turbidity
  • Val Vista One Ton Conversion
  • Marley Park Irrigation
  • Layton Lakes
  • Union Hills Cl2
  • Pasadena Power
  • Scottsdale Zones CA
  • Indian Basket Lift Station
  • COP Chlorination CA
  • LPSCO Airline Wells Alarm RTUs
  • Dreaming Summit PLC
  • GCS Belt Press
  • RV Gold Canyon Park LS
  • GCS Lift Station Alarms
  • GCS Alarm RTU
  • GCS Weather Station
  • BMS Elect Upgrades for Lift Stations
  • BMS WTF Influent Metering Mods
  • Black Mountain Sewer Alarm RTUs
  • Globe Middle School Water
  • Flow Monitoring
  • Phoenix 91st Ave Chlorination
  • Ocotillo Upgrades
  • Pine Lakes Estates Turnout
  • Erie Well
  • Avondale OCS Panel Repair
  • McQueen Lakes Turnout
  • Avondale Solids SCADA
  • Arrowhead Basin Pump Station
  • Lagos Vistoso Turnout
  • Avondale Sludge PLC
  • Dreaming Summit PLC Changes
  • Rio Salado Ponds
  • Sundance Energy
  • Verco Replace Valve
  • SCWUC Water Plant 2 Upgrades
  • Forest Energy Reload Main PLC
  • Happy Valley Pump Station
  • Dreaming Unit 1 Pump Station
  • Santan Pump Station
  • Verco Painter Programming
  • Abitibi Scrubber Reload PLC
  • Copper Mountain Ranch Water System
  • Bear Creek Prog Changes
  • Abitibi TDC 3000 Interface
  • Abitibi Scrubber Shutdown Trouble
  • Abitibi Demineralizer Mods
  • Rymar Pumps
  • Hexcel Inline Sheeter Relocation
  • ARWRF Upgrade II
  • ARWRF iFix 2.21 Upgrade
  • Lone Butte Pump Interlock
  • Scottsdale Zones WP
  • Lone Butte WTF Chlorination
  • Mesa Electrical Documentation
  • Reload Palletizer Program
  • 91st Ave Chlorination
  • ARWRF Blower Issues
  • 91st Ave WTP Lighting
  • CRE vs LHC Expert witness
  • WPF Valve Mods
  • Nogales IWTP Elect Evaluation
  • Chaparal Pines Well 17A
  • McDowell Mtn Ranch WPF
  • North Gateway WRP I
  • Bush Level Alarms
  • Airport Bear Creek
  • Motorola Well PLC Programming
  • Frye Startup for Taylor
  • Frye Startup for Chandler
  • ARWRF iFix Upgrade
  • Motorola Hayen Cooling Towers
  • Geometric
  • Tolleson 99th Ave. Lift Station
  • ARWRF Conformance Drawings
  • Bush Startup
  • Chlorinator
  • Forest Energy Troubleshooting
  • Blend Mix Valves
  • Hunt Startup
  • Hunt Tower Specifications
  • Micro Rel Drawings
  • Glendale ARWRF NFPA 820
  • Intel POR Calibrations
  • Glendale ARWRF SCADA
  • Frye Vault
  • Bush Well Upgrade
  • Mega Contract
  • Mega Systems TAVA
  • Weiser Conveyor Changes
  • Hi Cap Pumps
  • San Marcos WPF
  • Hunt Bush
  • Weiser Lock Presco
  • Nogales WRF Loops


...and more!