SHIPS LADDER: SHIPS LADDER PREFERRED
LIGHTING AT ALL LANDINGS: WALL MOUNT FIXTURES AT ALL PRIMARY AND MID-LANDINGS
PAINT COLOR: SHERWIN WILLIAMS "CITYSCAPE" SW7067
STAIRS TO BE METAL OR CONCRETE FILLED PANS: SHERWIN WILLIAMS "CITYSCAPE" SW7067
WAINSCOT: ALL HIGH TRAFFIC AREAS TO HAVE 4"-0" DIAMOND PLATE
CART STORAGE AREA: FLOOR MOUNTED CRASH BARS / WALL PROTECTION
HVAC UNIT NOT PLACED DIRECTLY INFRONT OF ELEVATORS: NO AIR HANDLERS OR OTHER EQUIPMENT TO BE LOCATED IN LOADING LOBBY. PREFER HALLWAY
SUPERGRAPHICS: CART AREA AND ELEVATOR DOORS TO RECEIVE BRANDING. PREP WALL ACCORDINGLY. CONTACT "AMGRAPH"
UPGRADED LIGHTING FIXTURES: REFER TO LIGHTING SECTION FOR SELECTION
SECURITY CAMERAS: COORDINATE CAMERA AND SECURITY LOCATIONS AT ALL LOADING AREAS AND ALL ENTRANCES TO BUILDING
STANLEY SLIDE "DURA GLIDE": CONFIRM DOOR R.O. AND ALL OTHER REQUIREMENTS, DOORS SHOULD LOCATED FOR EASE OF LOADING AND ELEVATOR ACCESS.
RECESSED EXTINGUISHER
HVAC UNITS: NOT TO BE MOUNTED ABOVE CUSTOMER UNIT DRIP PAN PROPERLY DRAINED, GRAVITY CONDENSATE LINES NOT PENETRATE STORAGE UNITS, ACCESS PANEL TO BE LOCATED FOR EASE OF MAINTENANCE, 110 AC OUTLETS DISCREETLY MOUNTED 8"-0" A.F.F, T-STAT MOUNTED 8"-0" A.F.F, T-STAT LOCKED & PROTECTED
LIGHTING: CENTERED ON UNIT DOORS (10"-0" O.C.), REFER TO LIGHTING SECTION
CONVENIENCE OUTLETS: MOUNTED ABOVE 8' A.F.Fa DISCREETLY PLACED. IF MOUNTED BELOW 8'-0"- PROPERLY SECURED IN LOCK BOX
UNIT NUMBERS / PLAQUES: CONTACT AMGRAPH
HARDWARE
FIRE PROTECTION
FLOORS: ALL HALLWAYS TO RECEIVE NOX-CRETE CURE AND SEAL 100E 2 PART DENSIFIER OR WAX, INTERIOR UNITS WILL NOT BE FINISHED
DUCTWORK: ALIGNED ON EDGE OF HALLWAY, COORDINATE WITH LIGHTING HEIGHT AND FIRE PROTECTION
FINISH: NOX-CRETE CURE & SEAL 100E 2 PART SYSTEM
by Nox-Crete shall be applied to the entire slab in accordance with specification immediately following the concrete slab pour. The slab shall be cleaned and free of contaminants. Prior to the installation of the door and hall systems, contractor shall clean the entire slab with a floor scrubber. At the conclusion of construction and final clean, the contractor shall apply 2 coat of Cure & Seal 100E by Nox-Crete to all hallways. Doors shall be in the open position and a clean tape line shall be applied at the entrance of all units to ensure a uniform finish.