Take the Action Plan feedback survey by Dec. 19, 2025 / Participe en la encuesta de comentarios sobre el Plan de Acción antes del 19 de diciembre
To explore ways to improve walking, biking, and ADA-accessible connections between the future bridge and surrounding communities, the cities of Hood River, White Salmon, and Bingen, along with other state and local partners, are working together to develop an Active Transportation and Safety Action Plan. The plan identifies potential projects that promote safer, more connected travel around the new bridge, with a focus on walking, biking, and ADA improvements that enhance access for residents, workers, and visitors.
The Action Plan identifies targeted investments that:
Improve safety
Expand access to key destinations
Connect transportation networks
Advance equity across the region
These improvements will help create a more inclusive, affordable, and resilient transportation system for all.
To discover the journey behind the Action Plan, click here.
Para explorar maneras de mejorar las conexiones peatonales, ciclistas y accesibles según ADA entre el futuro puente y las comunidades circundantes, las ciudades de Hood River, White Salmon y Bingen, junto con otros socios estatales y locales, están trabajando en conjunto para desarrollar un Plan de Acción para el Transporte Activo y la Seguridad.
El plan identifica proyectos potenciales que promueven viajes más seguros y conectados alrededor del nuevo puente, con un enfoque en mejoras para caminar, andar en bicicleta y accesibilidad ADA que amplíen el acceso para residentes, trabajadores y visitantes.
El Plan de Acción identifica inversiones estratégicas que:
Mejoran la seguridad
Amplían el acceso a destinos clave
Conectan redes de transporte
Promueven la equidad en toda la región
Estas mejoras ayudarán a crear un sistema de transporte más inclusivo, asequible y resiliente para todos.
Para descubrir el proceso detrás del Plan de Acción, haga clic aquí.
The Action Plan focuses on the transportation network within a two-mile radius of the Hood River–White Salmon Bridge. This area includes key parts of Hood River, White Salmon, and Bingen, where multimodal connectivity is essential for bridge access and regional mobility.
El Plan de Acción se centra en la red de transporte dentro de un radio de dos millas del Puente Hood River–White Salmon. Esta área incluye partes clave de Hood River, White Salmon y Bingen, donde la conectividad multimodal es esencial para el acceso al puente y la movilidad regional.
Key facts:
The study area has an estimated population of 10,800 residents.
About 20% of the population is over age 64 and another 20% is under 18.
About 12% of the population identifies as a person living with a disability.
About 44% of all trips taken are 2 miles or less.
About 6% of households do not have access to a vehicle.
Safety concerns:
A total of 235 crashes were recorded in the study area between 2019 and 2023.
Bicyclists were involved in 1.3% of all crashes but accounted for 4.5% of all injury crashes.
Pedestrians were involved in 3.4% of all crashes but accounted for 10.6% of all injury crashes.
All recommended projects are located within this study area to ensure infrastructure investments directly support access to the new bridge and align with local and regional transportation goals. The area includes a mix of neighborhoods, commercial districts, schools, transit hubs, and recreational destinations, making it critical to address varied mobility needs and improve safety for all users.
Datos clave:
La zona de estudio tiene una población estimada de 10,800 residentes.
Aproximadamente el 20% de la población tiene más de 64 años y otro 20% es menor de 18.
Cerca del 12% de la población se identifica como persona con discapacidad.
Aproximadamente el 44% de todos los viajes realizados son de 2 millas o menos.
Cerca del 6% de los hogares no tienen acceso a un vehículo.
Preocupaciones de seguridad:
Se registraron un total de 235 accidentes en el área de estudio entre 2019 y 2023.
Los ciclistas estuvieron involucrados en el 1.3% de todos los accidentes, pero representaron el 4.5% de los accidentes con lesiones.
Los peatones estuvieron involucrados en el 3.4% de todos los accidentes, pero representaron el 10.6% de los accidentes con lesiones.
Todos los proyectos recomendados se ubican dentro de esta área de estudio para garantizar que las inversiones en infraestructura respalden directamente el acceso al nuevo puente y se alineen con los objetivos de transporte locales y regionales. El área incluye una combinación de vecindarios, distritos comerciales, escuelas, centros de transporte y destinos recreativos, lo que hace fundamental abordar diversas necesidades de movilidad y mejorar la seguridad para todos los usuarios.
Improve connectivity, safety, and accessibility in downtown Bingen by enhancing pedestrian and bicycle infrastructure, creating safer routes to the Amtrak Station, traffic calming along key corridors, and improving access to the new Hood River-White Salmon Bridge. These improvements aim to support active transportation, strengthen local mobility, and create a more welcoming and walkable downtown environment.
Sidewalk along Depot St (Walnut St to Ash St)
Sidewalk along Ash St (Depot St to SR-14)
Sidewalk along Walnut St (Depot St to SR-14)
Estimated parking spaces to be removed: 1 on Ash St
A one-way protected bike path on both sides of SR-141 between SR-14 and northern city limits
Sidewalks on both sides of SR-141 between White Salmon and Bingen north of Franklin St
Estimated parking spaces to be removed: 17 in Bingen
SR-141
Humboldt St
Willow St
Humboldt St
Mejorar la conectividad, seguridad y accesibilidad en el centro de Bingen mediante la mejora de la infraestructura peatonal y ciclista, la creación de rutas más seguras hacia la estación Amtrak, la implementación de medidas de calmado de tráfico en corredores clave y la mejora del acceso al nuevo Puente Hood River–White Salmon. Estas mejoras buscan fomentar el transporte activo, fortalecer la movilidad local y crear un entorno urbano más acogedor y transitable.
Acera a lo largo de Depot St (Walnut St a Ash St)
Acera a lo largo de Ash St (Depot St a SR-14)
Acera a lo largo de Walnut St (Depot St a SR-14)
Espacios de estacionamiento estimados a eliminar: 1 en Ash St
Un carril protegido para bicicletas en ambos lados de SR-141 entre SR-14 y los límites norte de la ciudad
Aceras en ambos lados de SR-141 entre White Salmon y Bingen al norte de Franklin St
Espacios de estacionamiento estimados a eliminar: 17 en Bingen
SR-141
Humboldt St
Marcas de carril compartido
Willow St
Humboldt St
Transform 2nd St and State St into more complete, accessible corridors for all users. These improvements will enhance mobility, encourage active transportation, and support a vibrant, connected downtown.
A 2-way protected bike path on the west side of 2nd St between State St and I-84 Ramps
Alternative: Convert 2nd St (State St to Oak St) to one-way northbound only for vehicular traffic
Estimated parking spaces to be removed: 11
A 2-way protected bike path along 1st St (State St to Cascade Ave) and 2nd St (Cascade Ave to I-84 Eastbound Ramps)
Estimated parking spaces to be removed: 17
Existing 12' sidewalk along the north side of State St is reconfigured to:
6-foot pedestrian walkway
6-foot westbound bike lane
The street will be reconfigured to include:
Two 10-foot travel lanes
A 5-foot eastbound bike lane
Diagonal and parallel parking will remain
Most diagonal parking will be converted to back-in only
Estimated parking spaces to be removed: 16
2nd St design between the I-84 interchange and Oak St is subject to state approval.
Transformar 2nd St y State St en corredores más completos y accesibles para todos los usuarios. Estas mejoras aumentarán la movilidad, fomentarán el transporte activo y apoyarán un centro urbano vibrante y conectado.
Un carril protegido bidireccional para bicicletas en el lado oeste de 2nd St entre State St y las rampas de I-84
Alternativa: Convertir 2nd St (State St a Oak St) en sentido único hacia el norte para el tráfico vehicular
Espacios de estacionamiento estimados a eliminar: 11
Un carril protegido bidireccional para bicicletas a lo largo de 1st St (State St a Cascade Ave) y 2nd St (Cascade Ave a las rampas este de I-84)
Espacios de estacionamiento estimados a eliminar: 17
La acera existente de 12 pies en el lado norte de State St se reconfigura para:
Pasarela peatonal de 6 pies
Carril para bicicletas en sentido oeste de 6 pies
La calle se reconfigurará para incluir:
Dos carriles de circulación de 10 pies
Un carril para bicicletas en sentido este de 5 pies
El estacionamiento diagonal y paralelo se mantendrá
La mayoría del estacionamiento diagonal se convertirá en retroceso
Espacios de estacionamiento estimados a eliminar: 16
El diseño de 2nd St entre el intercambio de I-84 y Oak St está sujeto a aprobación estatal.
Build on existing shared-use trails by creating new links and improving safety between key destinations including the waterfront, downtown, and the new Hood River-White Salmon Bridge to support walking, biking, and ADA accessible connections for a more connected community.
A 2-way protected bike path on the west side of the 2nd St between State St and I-84 Ramps
A shared-use path on the west side of 2nd St between I-84 Ramps and Portway Ave
Estimated parking spaces to be removed: None
Modify the existing bridge or build an additional 16' shared-use path bridge adjacent to the existing pedestrian bridge
Anchor Way
Portway Ave
Riverside Drive
East Port Marina Drive
Anchor Way
Portway Ave
Nichols Parkway
8th St
2nd St design between the I-84 interchange and Oak St is subject to state approval.
Aprovechar los senderos existentes de uso compartido mediante la creación de nuevos enlaces y la mejora de la seguridad entre destinos clave, incluyendo la zona ribereña, el centro y el nuevo Puente Hood River–White Salmon, para apoyar conexiones peatonales, ciclistas y accesibles según ADA, fomentando una comunidad más conectada.
Un carril protegido bidireccional para bicicletas en el lado oeste de 2nd St entre State St y las rampas de I-84
Un sendero de uso compartido en el lado oeste de 2nd St entre las rampas de I-84 y Portway Ave
Espacios de estacionamiento estimados a eliminar: Ninguno
Modificar el puente existente o construir un puente adicional de 16 pies para uso compartido junto al puente peatonal actual
Cerrar brechas en las aceras
Anchor Way
Portway Ave
Riverside Drive
East Port Marina Drive
Anchor Way
Portway Ave
Nichols Parkway
8th St
El diseño de 2nd St entre el intercambio de I-84 y Oak St está sujeto a aprobación estatal.
Create a safer, more connected downtown for White Salmon by improving access for people walking, biking, and driving. This focus area aims to enhance mobility, close critical gaps in infrastructure, and support a vibrant, active community through thoughtful street and corridor improvements.
A 2-way protected bike lane on the west side of North Main Ave between SR-141 and Whitson Elementary School
Estimated parking spaces to be removed: 14
A one-way protected bike lane on both sides of SR-141 between North Main Ave and City of Bingen
Close sidewalk gaps and provide continuous sidewalks on both sides of the corridor
Conventional bike lanes on both sides of SR-141 between Northwest Garfield Ave and North Maine Ave
Traffic calming measures such as curb extensions and concrete islands to protect bike lanes and improve visibility of pedestrians and cyclists at intersections
Estimated parking spaces to be removed: 20 in White Salmon
Crear un centro más seguro y conectado en White Salmon mediante la mejora del acceso para peatones, ciclistas y conductores. Este enfoque busca mejorar la movilidad, cerrar brechas críticas en la infraestructura y apoyar una comunidad activa y vibrante mediante mejoras estratégicas en calles y corredores.
Un carril protegido bidireccional para bicicletas en el lado oeste de North Main Ave entre SR-141 y la Escuela Primaria Whitson
Espacios de estacionamiento estimados a eliminar: 14
Un carril protegido unidireccional para bicicletas en ambos lados de SR-141 entre North Main Ave y la ciudad de Bingen
Cerrar brechas en las aceras y proporcionar aceras continuas en ambos lados del corredor
Carriles convencionales para bicicletas en ambos lados de SR-141 entre Northwest Garfield Ave y North Main Ave
Medidas de calmado de tráfico como ampliaciones de bordillo e islas de concreto para proteger carriles bici y mejorar la visibilidad de peatones y ciclistas en intersecciones
Espacios de estacionamiento estimados a eliminar: 20 en White Salmon
Create a welcoming and efficient entrance to White Salmon that strengthens regional connectivity and enhances safety for all travelers. This focus area aims to improve the flow between White Salmon and Bingen, while establishing a distinctive gateway experience that reflects the community's identity and supports walking, biking, and driving.
On the north side of SR-14 between Dock Grade Road and the future *roundabout
On the south side of SR-14 between the future *roundabout and west of Daubenspeck Park
The shared-use path will transition to the north side, via marked crosswalk with rectangular rapid flashing beacons, west of Daubenspeck Park and continues to Willow St
Estimated parking spaces to be removed: None
*The roundabout is part of Hood River-White Salmon Bridge Replacement project.
Crear una entrada acogedora y eficiente a White Salmon que fortalezca la conectividad regional y mejore la seguridad para todos los viajeros. Este enfoque busca mejorar el flujo entre White Salmon y Bingen, mientras establece una experiencia distintiva de acceso que refleje la identidad comunitaria y apoye caminar, andar en bicicleta y conducir.
En el lado norte de SR-14 entre Dock Grade Road y la futura *rotonda
En el lado sur de SR-14 entre la futura *rotonda y el oeste del Parque Daubenspeck
El sendero de uso compartido se trasladará al lado norte mediante un cruce peatonal marcado con balizas intermitentes rectangulares, al oeste del Parque Daubenspeck, y continuará hasta Willow St
Espacios de estacionamiento estimados a eliminar: Ninguno
*La rotonda forma parte del proyecto de reemplazo del Puente Hood River–White Salmon.
Your input is essential to shaping the future of active transportation and safety in our community. By sharing your thoughts, you will help ensure the plan reflects real needs and priorities to make walking, biking, and rolling safer and more accessible for everyone.
The survey closes Dec. 19, 2025, at 11:59 p.m. Don’t miss your chance to make a difference!
Su opinión es esencial para dar forma al futuro del transporte activo y la seguridad en nuestra comunidad. Al compartir sus ideas, ayudará a garantizar que el plan refleje necesidades y prioridades reales para hacer que caminar, andar en bicicleta y desplazarse sea más seguro y accesible para todos.
La encuesta cierra el 19 de diciembre de 2025 a las 11:59 p.m. ¡No pierda la oportunidad de marcar la diferencia!
↓↓↓