Progress
(Updates coming)
(Updates coming)
Addition of Loft (10/23/2018)
Donated Pine delivery compliments of Dan Shaw and Kochman Reidt + Haigh Cabinetmakers (8/27/2018)
Donated Pine delivery compliments of Dan Shaw and Kochman Reidt + Haigh Cabinetmakers (8/27/2018)
Interior Prep (9/17/2018)
All four wall frames are complete (5/17/2018)
Senior Dylan Kasarjian finishes up a wall frame (5/9/2018)
Production of wall frames continue (5/3/2018)
Construction of south-facing wall begins (5/1/2018)
Construction of the walls continues to progress (4/24/2018)
The team inspects a finished wall. Since the walls are too high to exit the garage door, they haven't been drilled in permanently yet. Construction will continue outside in the near future. (4/13/2018)
Senior John Canal uses a belt sander to polish off the structure above the wheel well. The structure is in place to balance the weight of the house, and prevent it from caving in over the wheel. (4/9/2018)
With the rough flooring complete and windows and insulation on the way, the Construction Tech team begins work on the wall studs. (4/3/18)
With the insulated subfloor layed down, the team has installed the plywood top layer, complete with custom wheel well casings to accomodate the trailer's unusual dimensions. (3/30/18)
Students plan and design scale-model blueprints of wall and roof construction during an in-school tiny home field trip. (3/22/18)
The team inserts insulation into the newly adjusted subfloor framing, completing subfloor construction. (3/21/18)
Project advisers Mr. Calais and Mrs. Galster finalize rough window measurements in the blueprint design. (3/20/18)
Mr. Levesque's Construction Technology students assess and discuss a newly discovered setback in subfloor installation -- the trailer's subtle concavity. (03/15/18)
AP Physics II students James Crews and Clay Boice research effective solar and electrical solutions for the home's off grid needs. (03/10/18)
Junior Ian Davis prepares rigid insulation -- donated courtesy of Brian Cheever and Ashland Lumber -- for insertion into the nearly completed subfloor. (03/06/18)
Student Griffin Ripley, not pictured, designs and models layout plans in CAD during his Construction Technology class. (03/01/18)