D1.
Dense media preparation report
D2
. Cost estimation per test report
D3
. Performance of each heavy mineral suspension in the lab-scale hydrocyclone system in different operation conditions
D4
. Celestite mineral concentration evolution in the different sampling points: feeding, sink and floated.
D5
. Optimized operation conditions for the lab scale plant.
D6
. Report describing the extrapolated operating conditions for the semi-industrial plant.
D7
. Design of a web page with project info.
D8
. Report of the dissemination and communication activities related to the project.