Log
2023.8.21
The HQR (T1-1) specrtrometer was successfully restarted.
The 4K GM refrigerator and the 1K 3He cryostat were mounted on the sepctrometer to measure magnetic ground states of several rare-earth compounds.
2023.8.21
The HQR (T1-1) specrtrometer was successfully restarted.
The 4K GM refrigerator and the 1K 3He cryostat were mounted on the sepctrometer to measure magnetic ground states of several rare-earth compounds.