Below is a map depicting the 2025 TMP transit projects proposed for implementation in the "Needs" based network (prior to 2046).
Lines on the map in grey are existing projects while lines in blue are new bus projects and lines in red are new LRT projects.
The numbers inside the rectangular boxes are the project costs in m$. The small numbers in red adjacent to those boxes is the ranking of the projects in order of priority.
Boxes with black fill background on BRT/bus lane projects and boxes with orange background fill are LRT projects.
The set of projects illustrated on the map above are listed in the table below with the red id number on the map corresponding to the ID # in the table below.
In total this represents over 1.9B$ of bus projects combined of 1.4B$ BRT projects and 519m$ of dedicated bus lane projects.
The following depicts the future 2046 modelled transit ridership on the various bus corridors