Team Name and Logos
Robotics Files
Single Point Drive - Assignments
Google Sheets Tasking
Engineering Notebook Setup
End Goal Map
Tuesday RACI Chart
Tuesday SWOT
Pert Chart
Game Scoring Matrix
Evaluation example
Evaluation Form
5s Workstation / Prepare Luni Drive - Do Not Take Apart the Luni Drivetrain.
Sort, Set in Order, and Shine should be 20 minutes 2- 3 members
Standardize - relook to find improvements 5s + Safety Standardize
Sustain - use the 5s Audit Sheet
Announcements
Oct. 6 League Tournament FEA
Engineering Academy is open
Monday 9-3
Tuesday 4:25-5
Thursday 4:25-5:30
Friday 4:25-5
Table 1. VEX Robotics workstation layout.
Figure 1. Top drawer left side.
Figure 2. Top drawer right side.
5s+Safety Quiz - Google Classroom
Game Scoring Matrix
Introduce Google Sheets Tasking - Luni Drive Build Time Log/ gantt
Luni Drive whole team evaluation. 10-15 minutes.
Announcements
FRC Meeting Monday 9AM-12PM.
Engineering Academy is open
Monday 9-3
Tuesday 4:25-5
Thursday 4:25-5:30
Friday 4:25-5
RACI Quiz-balance team members
5s+Safety Quiz - Google Classroom
Google Team Folder - Task sheet
Assign one task to be completed as homework for each member
Research Push Back rules, videos of current matches, past robotics games with similar play, and look for mechanism trends.
Luni Drive
Engineering Notebook
Create a slide titled Identify the Problem/Design Goals
Create a slide titled Brainstorm Solutions
Rotations
Introduce Rotations and
Team Setup Engineering Notebook - Kraemer
Finalized team name and logos
Inserted team member profiles
Skills Training - Edwards
Electronics
Testing - motors, measurements - motors/ sensors
Tool use - gyro driver
Tool alignment
Luni Drive Build Evaluation and Repair - Team
Engineering notebook/ pictures and write up.
Google Sheet Time Log - Luni Drive Evaluation and Repair
Robotics Files
Single Point Drive - Assignments
RACI Chart
SWOT
Pert Chart
Game Scoring Matrix
Announcements
FRC Meeting Monday 9AM-12PM.
Engineering Academy is open
Monday 9-3
Tuesday 4:25-5
Thursday 4:25-5:30
Friday 4:25-5
Rotations
Team Setup Engineering Notebook - Kraemer
Team name and logos
Team member profiles
Luni Drive - Identify the Problem and Brainstorm sections.
Skills Training - Edwards
Electronics
Testing - motors, measurements - motors/ sensors
Tool use - gyro driver
Tool alignment
Luni Drive Build Evaluation and Repair - Team
Engineering notebook/ pictures and write up. Mr. Kraemer's Example
Luni Drive - remove superstructure and any additional pieces not found in the Luni Drive instructions. Luni Drive Refresh
Determine the parts that need to be used, repaired, or replaced.
Take apart as little as possible to achieve a refreshed drivetrain.
Announcements
Past Due
5s+Safety Evaluating Sort
Google Classroom Registration