Final Design Justification
This unit was designed in order to complete three operations: sinking of the full system, resurfacing of each buoy housing pod over equally spaced time intervals, and resurfacing of frame with the mat and chain.
In the central column, releasable weights were attached to the divider bar to sink and resurface the unit. Each of the buoy housing units resurfaced via the corrosion of the galvanic timed releases.
Final Design of Pod + Exploded View
Final Design of Frame + Exploded View
Final Design with Five Pods and Black Mat