Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Waiting on larger sheets of laminate that are required to complete the full length cast
Updating documents (report, poster, PPT for sponsor) based on 3 point beam bending test
Accomplishments from Previous Week
Tested the final prototype
Adjust report with respect to classmates’ and sponsor’s feedback
3 Point beam bending testing completed
Analysis from 3 point beam bending testing results completed
Troubleshooted issues with enclosure performance
Found a vacuum gauge
Checked pressure variation within casts
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Poster Session - everyone
Finish full length cast - everyone (paper layer - Olesya, grain layer - Kerrianne, Enclosure - Dylan and Brian)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments
In Person (3/13/18)
Mesh arrived
Sponsor final design review will be on Thursday
Move forward with purchasing ball valve from Chem Stockroom
Instructor Comments from Last Meeting and Actions Taken to Address these Comments
In Person: (3/13/18)
For Report:
Connect analysis results to the tests conducted
Explain possible reasons why theoretical final prototype didn’t perform as expected
Make sure figures’ fonts are readable
Move test results not applicable to the final design to the Appendix
For Poster:
Less paragraphs, more bullets
Remove irrelevant pictures
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
N/A
Risks and Areas of Concern
N/A
Resources or Information Required but not Available
N/A
Schedule
Manufacturing of the full length cast
Completing the report up to class’s and sponsor’s standard
Budget (list amount spent and amount remaining)
2152.65 remaining, 247.35 spent
Progress on Report and Webpage
Report split up between people; working on final updates