Details of Consultancy work
Proof Consultancy service for ‘Construction of Sewerage system of Bhubneshwar Sewerage District-1 on EPC mode’.(Ref: No./CED/DRCC/c-372/2020-21 dated 10/9/2020. ) ( 22.14 Lacks)
Proof Consultancy service for ‘Construction of Sewerage system of Bhubneshwar Sewerage District-II on EPC mode’. (Ref: No./CED/DRCC/c-373/2020-21 dated 10/9/2020. ) ( 12.30 Lacks)
Proof checking of Design, Drawing, calculations of construction of Sewerage System of Bhubaneswar Dist .IV of Bhubaneswar city, Orissa. (Ref: No./CED/DRCC/4645/2018-19 dated 10/12/2018. )( 10.50 Lacks)
To provide planning and allied works design consultancy service for the construction of cement concrete road from Airport Boundary to Bhimrad gate in south west. (Ref: No./DoCE/DRCC/C-4425/22-23 dated 03/03/2023 ) ( 15 Lacks)
To provide planning and allied works design consultancy service for the construction of cement concrete road from Bhimrad gam junction to khajod highway diamond bourse junction in south west zone.
(Ref: No./DoCE/DRCC/C-1439/22-23 dated 02/08/2022 ) ( 12 Lacks)
Providing and planning and pavement design consultancy services for the construction of phase (1) kalol-Jaspur road in 4.35 K in length and phase (2) Palsana village to kalol Swaminarayan Gurukul road in 2.5 km in length and 60 mt wide. (Ref: No./DoCE/DRCC/C-98/23-24 dated 10/04/2023 ) ( 68.50 Lacks)
Vetting of Constancy services for STP plant for preparation of DPR for provision of STP at Sabarmati. (Ref: No./DoCE/2022-23/C-293 dated 28/04/2022 ) ( 1.25 Lacks)
Third Party Inspection for the SETC work of Electro Mechanical equipment for newly constructed Pratap nagar sewage pumping station. (Ref: No./CED/DRCC/773/2018-19 dated 08/05/2018. ) ( 1.38 Lacks)
Checking and Vetting for Electrical Drawing and design of Intake well & WTP. (Ref: No./EED/288/2021-22 dated 11/05/2022 ) ( 0.28 Lacks)
Professional advice and Guidance, viz, Third party vetting and approval of the DPR for consultancy service for preparation of DPR for provision of STP at air force station, Bhita. (Ref: No./CED/20-21/C-109 dated 08/06/2020. ) ( 1 Lacks)
Proof Checking various components (Ref: No./EED/923/2018-19 dated 17/12/2018 ) ( 0.78 Lacks)
Document verification for water supply Scheme (Ref: No./EED/635/2019-20 dated 13/09/2019 ) (0. 50 Lacks)