The Spring 2026 CEE Capstone Projects include the following projects (with their project number):
2026-001 Parabolic Bridge Rehabilitation & Reconfiguration, Raymondville, NY
2026-002 Storm Water Management Plan & Resilience Report, Norwood, NY
2026-003 Creekwalk Extension Project Phase 3, Syracuse, NY
2026-004 Repairs and Upgrades to the Fall Island Retaining Wall & East Dam, Potsdam, NY
2026-005 Downtown Parking Garage Design, Potsdam, NY
2026-006 Los Alamos National Lab Design Challenge: Waste Container Design, Los Alamos, NM
2026-007 Solinsky & Science Center Capital Project, Clarkson University, Potsdam, NY
2026-008 Remediation of the Congress Street Site, Schenectady, NY
The Hamlet of Raymondville, NY is home to a unique bridge structure: a parabolic bridge (BIN 3341410, https://maps.app.goo.gl/jRCTgbYLbdSGEArj7). Officially owned by the St. Lawrence County Department of Highways, it was originally constructed by the Berlin Bridge Company in 1884. In 1984, given its uniqueness as the longest single span parabolic lenticular in the United States, the bridge was placed on the National Register of Historic Places. Because of its deteriorating condition, the bridge was closed to vehicular traffic in 1979. A group of local citizens in the Town of Norfolk (pronounced “Nor-fork”) desire to rehabilitate the bridge and reconfigure it as a pedestrian crossing inclusive of having improved approaches that create a public park area. Teams will have to aid in the development of a set of plans and specifications for rehabilitated and reconfigured structure. Critical to this will be extensive structural analysis and environmental characterization of the bridge itself and the surrounding site. Concerns related to the abutments will required open channel hydraulic modelling as well as subsurface and geotechnical assessments. Finally, the project will entail determining the final disposition of the site within the County or under new ownership, inclusive of the development of a potential new business entity to manage the rehabilitated and reconfigured site. Teams taking on this project will work with Mr. Martin Bregg of the Norfolk Historical Association and Mr. Andrew Willard, PE of the St. Lawrence County Department of Highways.
In August 2024, the largest single day rainfall in living memory occurred in the center of St. Lawrence County causing massive flooding in the Canton-Potsdam-Norwood area. While the damage and consequences of this were well reported within the Villages of Potsdam and Canton, the Village of Norwood (https://norwoodny.org/) also saw significant flooding and damage. In particular, St. Philip’s Episcopal Church, St. Andrew’s Roman Catholic Church, and the United Methodist Church along with the residents along River Street took a significant hit from the storm. This damage was so significant that the NYS Department of Homeland Security and Emergency Services (DHSES) has been called in to aid the community. The village needs an improved comprehensive understanding of the existing storm water management system and vulnerabilities. Further the project teams will be asked to come up with storm water solutions for the village so as to mitigate damage from future storm events at the magnitude seen in August 2024 and as projected by the NYS Climate Impacts Assessment (https://nysclimateimpacts.org/). Teams will also provide a report to the NYS DHSES related to the damage that occurred at St. Philips as well as the other two Churches in the area in order to provide support for a Hazard Mitigation grant application in accordance with all of the eligibility requirements described in Chapter 8 of the FEMA Public Assistance Program and Policy Guide. Teams taking on this project will work with Mr. Mark Tebo, Village of Norwood Mayor and Mr. Louis Rossi and Mr. Robert Torba of the Division of Homeland Security & Emergency Service, NYS DHSES.
Final Poster
Final Presentation
Final Synopsis
Final Deliverables
In the City of Syracuse, Onondaga Creek is an engineered channel constructed circa 1905 by the Army Corps of Engineers as part of a flood control measure to protect Downtown Syracuse from periodic flooding. A renewed focus on developing underutilized resources, resulted in a shift in perspective for Onondaga Creek from a flood control channel to a potential recreational resource. The vision was for a Creekwalk to run from Dorwin Avenue at the southern city limits, heading north to Onondaga Lake. This proposed trail was to form the spine of an interconnected trail system that includes the Erie Canal (now Empire State) Trail and the Onondaga Loop the Lake Trail. Phases I and II were designed and constructed from 2000 to 2020 and encompass the area from Onondaga Lake to Kirk Park (Colvin Street). Phase III encompasses the area from Kirk Park to Dorwin Avenue (Kelley Brothers Memorial Park) at the southern city limits (https://www.syr.gov/Projects/Infrastructure-Overview/Engineering-Projects/Creekwalk-Extension-Project-Phase-3). The Creekwalk Improvement Project Phase 3 will extend the Creekwalk by adding 3 miles of trail along Onondaga Creek from West Colvin Street to Dorwin Avenue. Once completed, the full Creekwalk will span nearly 8 miles, connecting Onondaga Lake to Dorwin Avenue. This extension will provide a vital recreational corridor along the southern half of Syracuse, while also serving as an important commuter route for pedestrians and cyclists. Additionally, new access points to Onondaga Creek will be developed as part of the Creekwalk project. Public meetings have been held to ascertain feedback from the public, but the project is now at the stage where routing options and more detailed design can begin. Teams taking on this project will work with Mr. Doug Stansbury, PE from C&S Engineers (who are serving as owners representatives for the City) as well as Mr. Russell Houck, PE from the City of Syracuse Engineering Department.
Final Poster
Schematic Design Presentation
Final Synopsis
Final Deliverables
The Village of Potsdam, NY (https://villageofpotsdamny.gov/) is considering necessary repairs and upgrades to some critical retaining and dam structures on the east side of Fall Island. These aging elements hold back the Racquette River to ensure that the south end of Fall Island and the current White’s Hardware Store are not flooded, as well as provide the needed weir height to generate power at the anticipated levels, in the adjacent east power plant. While not in a state of imminent collapse, these structures are showing their age and will require short-, medium-, and long-term plans to repair and upgrade them for the next 100 years and beyond. Teams will need to assess the conditions of the retaining wall and dam, develop a number of courses of action for addressing needed repairs, assess the feasibility for targeted upgrades (e.g. weir elevation boards for the dam, alternate retaining structures for the existing retaining wall, etc.). The primary customer for this project is the Village of Potsdam, represented by Ms. Alexandra Jacobs-Wilke, Village Mayor, Ms. Isabelle Gates-Shult, Village Administrator, Mr. Brian Barrett, Director of Public Works, Mr. Greg Thompson, Village Code Enforcement Official, Department of Public Works, and Mr. David Thurlow, Director of Planning and Community Development. Participants will also work closely with the Village and Town of Potsdam Climate Smart Communities (CSC) Task Force as well as the Planning Committee of the Village of Potsdam.
Final Poster
Final Presentation
Final Synopsis
Final Deliverables
The Village of Potsdam, NY (https://villageofpotsdamny.gov/) is contemplating a robust plan for the future of parking. In Fall of 2023, the Clarkson CEM Consulting Group (C3G; https://sites.google.com/clarkson.edu/clarkson-c3g/) completed a parking study for the Village that provided input into significant changes in the parking approach for the available surface lots throughout the core of the village in the Spring and Summer of 2024. Continuous feedback has been provided by community members, the chamber of commerce, and other interested parties about how best to address parking in the village into the future. The village seeks to understand what a structured parking solution might look like for the very central “Probst” parking lot area. Teams will be asked to develop potential parking garage/deck solutions that accommodate a varied volume of vehicles. Consideration for deliveries into the various businesses will be a core evaluation criteria among others, including short and long-term costs (total cost of ownership, revenue stream support). Teams taking on this project will design a parking structure based on project parameters still in development. The primary customer for this project is the Village of Potsdam, represented by Ms. Alexandra Jacobs-Wilke, Village Mayor, Ms. Isabelle Gates-Shult, Village Administrator, and Mr. David Thurlow, Director of Planning and Community Development. Participants will also work closely with the Planning Committee of the Village of Potsdam.
Hazardous waste is a necessary byproduct of the national security mission. Removal and transportation of this waste is critical to enabling the national security mission. Los Alamos National Laboratory (LANL, https://www.lanl.gov/) is interested in the feasibility of a smaller, hardened, waste container that can safely transport waste. In this project, team members will be tasked with building and testing an effective design that can withstand not only transportation environments but also potential hostile actors. Teams will design a packaging container with the intent to survive: thermal cycling, shock and vibration from transportation, explosive insult, a free drop test, and a water drop test. The packaging container shall have tamper evident features and be able to provide safety health monitoring to the user. Team members will be given freedom with regards to the design of container, material, and internal components, so long as they are within the provided design requirements and constraints. Additionally, the design should be easily transportable. Teams will be working with coaches from LANL and work alongside Mechanical and Electrical Engineering team members. This unique project will only be open to up to 3 CivE/EnvE/EHS team members and includes an all-expense-paid trip to LANL in early May to present their design.
Final Poster
Final Presentation
Final Synopsis
Final Deliverables
In 2022 Ken (MechE ’71) and Grace Solinsky agreed to the largest financial gift to Clarkson University in its 127 year history, promising $32M in direct contributions to the institution. The gift, however, was not given outright, but rather comprises a challenge to the institution to meet certain marks and gates in order to release the funds. What is also required is that the university fundraise or find matching grants and other revenues to match the contributions by the Solinsky’s dollar for dollar, making the totality of the challenge a $64M investment in engineering education at Clarkson University. Of the $64M total challenge, $48M is focused on a capital investment into the facilities that support the expansion and renovation of the CAMP/Rowley facilities on the Collins Hill Campus. In addition, $12.9M of fundraising and grant support is available to renovate the Cora & Baynard Clarkson Science Center. The overall comprehensive project makes up the Clarkson Engineering & Applied Sciences Educational Complex (CEASEC). This capstone project will work to design renovations within the Science Center at Clarkson University based on a concept design developed by LaBella/SLAM (https://labellapc.com/, https://slamcoll.com/). Teams on this high-profile project will work with the Coulter School leadership (Dean William Jemison, the various department chairs, and Associate Dean Doug Bohl) especially the Academic Facilities Lead for the Solinsky Challenge, Prof. Erik Backus. PE and with the Clarkson Facilities & Services Staff.
A former industrial facility located in New York was in operation from approximately 1910 through 1997 where it produced enamels, insulating varnishes, and resins. The Congress Street site is approximately seven (7) acres in size and is located on a steep embankment consisting of two terraces separated by a forty-five foot drop. In 1996 a feasibility study was completed on the site that identified soil and groundwater contamination; specifically, the contamination was located in two distinct areas and consisted of primarily volatile organic compounds (VOCs) and semi-volatile organic compounds (SVOCs). Specific contaminants included, but were not limited to: trichloroethane, TEX (4, 10-dinitro-2,6,8,12-tetraoxa-4,10-diazatetracyclo[5.5.0.0.0]-dodecane), phenolic compounds, and naphthalene compounds. In an effort to reduce the environmental impact of the contamination to surrounding areas, the facility entered an Order on Consent to prepare a Remedial Investigation / Feasibility Study (RI/FS). A Record of Decision was prepared for the site by the New York Department of Environmental Conservation (NYSDEC) in 2010. The Remedial Design and Remedial Action was completed in 2018. The problem to be solved is to provide a basis-of-design report and preliminary design for remedial actions. The report and preliminary design needs to meet current regulations that govern this type of project in New York State.
DRAFT Final Deliverables - PASE
Final Presentation - PASE
Final Deliverables - REMTEK
Final Presentation - REMTEK