The Spring 2025 CEE Capstone Projects include the following projects (with their project number):
2025-001 Solinsky & Science Center Capital Project, Clarkson University, Potsdam, NY
2025-002 Town of Hermon Water Bottling Facility Project, Hermon, NY
2025-003 Storm-water System Investigation and Design of Detention Elements for the Cross-town Canal in Potsdam, NY
2025-004 Cheel Campus Center Retail Space Design in Potsdam, NY
2025-005 Village Boat Launch Site Design in Lake Placid, NY
2025-006 LANL Design Challenge: Anti-Mine Ground Penetrator, Los Alamos, NM
In 2022 Ken (ElecE ’71) and Grace Solinsky agreed to the largest financial gift to Clarkson University in its 127 year history, promising $32M in direct contributions on their part to the institution. The gift, however, was not given outright, but rather comprises a challenge to the institution to meet certain marks and gates in order to release the funds. What is also required is that the university fundraise or find matching grants and other revenues to match the contributions by the Solinsky’s dollar for dollar, making the totality of the challenge a $64M investment in engineering education at Clarkson University. Of the $64M total challenge, $48M is focused on a capital investment into the facilities that support the Coulter School of Engineering and Applied Sciences. This capstone project will work to design those facilities as a comprehensive update to CAMP/Rowley as well as the Science Center at Clarkson University. The project envisions an impactful but modest addition to the CAMP/Rowley complex and significant renovations/upgrades to both that complex as well as the Science Center. Teams will get a start on the effort based on preliminary work on the part of Introduction to Architectural Engineering and Building Information Modeling/Integrated Project Delivery class projects (and critiques thereof) from the Fall 2024 semester. Teams on this high profile project will work with the Coulter School leadership (Dean William Jemison, the various department chairs, and Associate Dean Doug Bohl) especially the Solinsky Challenge Co-Director Mr. Scott McNulty) and with the Clarkson Facilities & Services Staff, especially Director of Facilities Mr. Michael Tremper and Project Manager John Lawrence.
Final Poster
Final Presentation
Final Synopsis
Final Deliverable
Final Poster
Final Presentation
Final Synopsis
The Town of Hermon (https://www.hermonny.org/) is a small municipality which has a very high quality spring water supply system. The Town’s demand for domestic water is significantly lower than the production from the spring fed supply system in place. As a consequence, the Town is dumping into a local stream millions of gallons of top quality drinking water. There is a strong desire on the part of the Town Council to evaluate the possibility of developing a bottling facility to monetize this asset. A previous effort was conducted to look at a bulk water facility to be delivered to large customers, but there is a desire to look at a retail option. The Town has collected a large amount of facilities data, water supply information, and other data that can be used to enable the effort to conduct a feasibility study for what might be the options for both the management/business opportunity as well as the facilities needs to actualize the corresponding business plans. This project requires a team that can operate across the spectrum of business/industrial engineering to facilities and technical plant development. Teams will work with Town Trustee Mr. Robert LaClair and Ms. Marisa Clark, PE from Barton & Logudice, PC.
Final Poster
Final Presentation
Final Synopsis
The Village of Potsdam (http://vi.potsdam.ny.us/content) has a series of subsurface canals, also known as “the Crosstown Canal”, that convey storm-water to the Raquette River. These enclosed canals were constructed in the early 1900s for the purpose of diverting small streams in the low lying area near the river into the Raquette. Over time, these canals were built over and are currently unexposed. During the original construction of these canals, maps were not created and as such, there is a lack of knowledge relating to the location, dimensions, and type of materials. As there has been an increase in intensity of rain events in the North Country, these canals have failed to fully serve the purpose and localized flooding has occurred. For instance, in August 2024, the Village of Potsdam experienced a significant rainfall event that resulted in the Crosstown Canal being overwhelmed. This event caused significant damage to local residents, which now have formed a group called the Potsdam Flood Free Coalition. A series of studies (by both professional firms as well as Clarkson Capstone project teams) have looked at the canal related to: a) the events that caused these flooding occurrences, b) a condition assessment of the canal, and c) modeling of the canal capacity. This identified several areas of needed improvement, including: a) the removal of several utility obstructions (completed in 2017), b) the design and construction of several upstream basins to limit the volume of flow into the canal, c) performing cleaning and structural improvements to the canal, d) improved mapping of portions of the canal to record dimensions, material make-up of the canal(s), branch and feeder locations, areas of heavy debris (or those likely to see them in a storm event), and where non-storm-water flows are interdicting & infiltrating into the canal(s). What is critical at this juncture is finding ways to detain storm water flows from entering the canal system at its main entry points. Teams will develop design and construction solutions for the various problems (ascertained through assessments, surveys, analysis and other data) that exist upstream of the Crosstown Canal. The primary customer for this project is the Village of Potsdam, represented by Ms. Alexandra Jacobs-Wilke, Village Mayor, Mr. Greg Thompson, Director of Public Works, Mr. Fred Hanss, Director of Planning and Community Development, and members of the Flood Free Coalition. Participants will also work closely with the Village and Town of Potsdam Climate Smart Communities (CSC) Task Force as well as the Planning Committee of the Village of Potsdam.
Final Poster
Final Presentation
Final Synopsis
Final Deliverable
Final Poster
Final Presentation
Final Synopsis
Final Deliverable
The Cheel Campus Center, which concluded construction in 1992, was originally envisioned as a combination hockey venue facility, campus gathering and hospitality space, and the student center for the Hill Campus of Clarkson University (as significant portions of the institution remained on the Downtown campus). With the movement of the Business School and the Humanities & Social Science/Communications faculty upon the completion of a new BH Snell Hall in 2002, all undergraduate programs were finally housed on the Hill Campus prompting the development of the Student Center facility which was completed in 2012. What has continued, never fully addressed in either facility, was that the University Bookstore (a wholly owned subsidiary of the University, a part of the Weston Companies) remained on a storefront on Market Street downtown. Additionally, the original “Knight & Day” convenience store in Cheel was shut down and relocated to a decidedly poor location in the Student Center, which has thus been since shuttered. The overall Cheel Campus Center was added to, with construction completing in the summer of 2020, but this expansion did not address the retail needs of the Collins Hill Campus nor consider bringing the bookstore up from its downtown location. Given several factors, there is now a desire to look at the Cheel Campus Center in a new light, and conduct a multi-phased, non-operation impacting, renovation of the facility to address the best approach to: a) relocate and move the bookstore into Cheel (combining the spirit store operations within that same location), b) consider providing a retail/convenience store again within the building, c) given that alcohol sales are now part of events and activities in the arena, relocating the bar within Cheel to a more appropriate location, and d) maximize potential retail sales as a mechanism to generate revenue for the institution especially in light of the sizable amount of non-student/staff/faculty community traffic that frequents this facility. Teams will work with the University Bookstore Committee (consisting of Mr. Jeff Ives, Ms. Laurel Kane, Mr. Brian Grant, Mr. Michael Tremper, Dr. Erik Backus, and Ms. Nicole Donaldson). Additionally, teams will work with the Clarkson Cheel Arena and Bookstore Staff, especially Mr. Logan Norris and Mr. Evan Hitchman.
Final Poster
Final Presentation
Final Synopsis
The Village of Lake Placid (https://northelba.villageoflakeplacid.ny.gov/) owns a limitedly accessible boat launch site alongside a NYS boat launch into Paradox Bay of Lake Placid. There is a strong desire to improve access and consider configurations that may include the purchase of adjacent property. Critical in this development are utility considerations, as a main water intake for the Village water system is within this site as well as a subterranean electric line. Also important, are environmental factors, as there is high sensitivity to the water quality for both Mirror Lake and Lake Placid, with NYS DEC having had issues with private owner dredging operations causing disturbance of waterfowl and aquatic wildlife nesting/feeding/hatching areas. Teams will be working with the Lake Placid/North Elba Development Commission (Ms. Haley Breen, Mr. Dean Deitrich) to develop plans for a new boat launch.
Final Poster
Final Presentation
Final Synopsis
Final Deliverable
Unexploded landmine ordinance poses a threat to the health and safety of numerous civilian areas across the globe. Safe removal of this explosive ordinance not only protects the public but frees up land which can be utilized for agriculture and housing. Los Alamos National Laboratory (LANL) is interested in the feasibility of remotely marking and exploding landmines by dropping ground penetrating devices from low flying drones onto known locations. In this project, students will be tasked with designing and building an effective and robust design for a ground penetrator. Students will design a ground penetrator with the intent to survive thermal, vibrational, penetrative point-shock, and explosive insult. The design shall embed the majority of its length in the ground as deep as possible, leaving at least the aft 6” protruding as a visual location indicator. The penetrator must be able to play an audio cue when impact is detected to warn of the presence of mines should the device miss its mark. Teams will be working with coaches from LANL and work alongside Mechanical and Electrical Engineering students.