Last Year's Project
Last Year's Project
In recent years, our team at Cal Sustainable Solutions has been committed to designing in SketchUp and rendering with TwinMotion. Every project embodies our vision of an ideal city - resourceful, accessible, inclusive, resilient and desirable .
The competition challenged teams to convert an underutilized 5 story commercial building and surrounding lot into a vibrant mixed-use development. Additionally they must design a new 4 story building on the site, including ground-floor retail space. Teams had to manage stormwater with green infrastructure, include 6,000 sq ft of gathering space, incorporate sustainable energy features, and propose transit-related off-site improvements. Designs required justifications based on local codes and best practices. All this simulating a real-world proposal.
Plan view of the site, provided by ASCE
The four competition deliverables:
Report
Envision Checklist
Poster
Presentation
Presentation