Site-wide Building Signage & Roofing Lettering Project
Mariscal Painting, Inc., September 2022
Mariscal Painting, Inc., September 2022
Mariscal Painting, Inc., July 2022
Plyco Corp., October 2021
Provide electrical infrastructure for new drinking fountains.
Reyes, August 2021
Renovate the roofs of those buildings noted. Includes both built-up roofs and ketone ethylene ester roofs. Abate all asbestos-containing materials, replaced all flashing, pipe & support penetration systems, and gutters where noted.
Best Contracting Services, Inc., February 2021
Lighting Fixture Retrofit and Replacement Project for the installation of high efficiency lighting equipment and controls.
ReGreen, Inc., December 2020
Install backpack hooks to hang backpacks and get them off the ground - protects backpacks and provides safe ingress and egress from classrooms and keeps pathways clear.
Mariscal Painting, Inc., June 2020
Provide additional electrical infrastructure to support the additional E-rate equipment.
J.P. Electrical Construction, February 2020
Repair compromised flashing, roof penetrations, and roof membrane where leaking occurred for Bldg's. I (123), and L (131)
Rancho Construction Services, November 2019
Replace cracked asphalt and crack seal.
E.C. Construction Company, November 2019
BEFORE
BEFORE
AFTER
AFTER
Replace all existing Uninterruptible Power Supplies (UPS) and Wireless Access Points (WAP or AP) at eighteen (18) school locations. The schools universal service support program, commonly known as the E-rate program, helps schools and libraries to obtain affordable broadband. Funding may be requested under two categories of service: category one services (telecommunications, telecommunications services and Internet access), and category two services that deliver Internet access within schools(internal connections, basic maintenance of internal connections, and managed internal broadband services). The discounts range from 20 percent to 90 percent of the costs of eligible services.
NIC Partners Inc., September 2019