1.Design & Development of a Longitudinal Wave Beach System for a High-Speed Towing Tank (October 1986)-Defense Research & Development Organization
2.Design & Development of a Transverse Wave Absorber System for a High-Speed Towing Tank-Defense Research & Development Organization
3.Design of Fisheries Harbour-Gopalpur Port Project
4.Design of Approach Trestle-Gopalpur Port Project
5.Weather Window for Tamil Nadu Coast (March 1989)-Oil & Natural Gas Commission, Madras
6.Numerical Modelling and Flume Investigations for Pipavav Port, Gujarat (July 1993)-Larsen & Toubro Ltd., Bombay
7.Study of Wave Characteristics in Ravva Field of K.G.Offshore (November 1993)-O.N.G.C., Madras
8.Design of Sea Water Intake System-Birla Periclase, Visakhapatnam
9.Extension of Haddow Wharf (November 1993)-Andaman Harbour Works
10.Spencer’s Aquaculture Project -Spencer’s & Co
11.Design of Sea Water Intake System at Naripaiyur-Entoma Hydro Systems, Madras
12.Development of Colachel Port (March 1996)-Govt. of Tamil Nadu, Tamil Nadu Port Development
13.Design for Diffusor System-ABAN Constructions
14.Development of All Weather Port at Gopalpur (January 1996)-Tata Iron & Steel Co. Ltd.
15.Sea Water Intake-Gopalpur Port Project
16.Design of Deep-Water Berth-Gopalpur Port Project
17.Potential Sites along Orissa Coast-Government of Orissa
18.Dredging Chilka Mouth-Chilka Development Authority
19.Master Plan for Gopalpur-TISCO
20.DRP for GMB Port at POSITRA -FRH
21.Wave Flume Studies for Breakwater Section/Round Heads Proposed for Jaigad, Agargule, Vijaydurg & Redi Ports.-NIO, GOA
22.Analysis of Sea Water Intake System for Kovaya, Gujarat. (December 1996)-LARSEN & TOUBRO LTD. MUMBAI
23.Behaviour Changes in Pulicat Backwaters.-NMTPP TNEB, ENNORE, MADRAS
24.Off shore feed stock handling facility for PP/PE Plant - North of Kakinada.-M.K.R. Industries Ltd. Secunderabad
25.Studies on tidal effect in Adyar River-ESKAY DESIGNS, Madras
26.DPR for Nagapattinam Port (January 1998)-TNPD, Chennai
27.DPR for Cuddalore Port (January 1998)-TNPD, Chennai
28.DPR for Vallinokkam Port-TNPD, Chennai
29.Stability Analysis of Composite Breakwater at Mormugao Port (September 1998 )-Mormugao Port Trust, Goa
30.Construction of Mini Fishing Harbour at Muthalapozhi - Numerical Model Studies (August 1998)-Harbour Engineering Department, Thiruvananthapuram
31.Amba Creek Crossing - Request for Calculations for Floatation and Buoyuancy (November 1997)-ABAN Constructions, Chennai.
32.Design of Diffuser Support System for Jam Nagar (December 1995)-ABAN Constructions, Chennai.
33.Numerical Modeling for Tranquility Studies for Rameswaram Fisheries Harbour (February 1998)-Fisheries Department, Chennai
34.Construction of 25 MLD Capacity Sewage Treatment Plant at Visakhapatnam (January 1999)-Municipal Corporation, Visakhapatnam.
35.Feasibility report for proposed Fishing Harbour at Veerapandiapattinam in Tuticorin (July 1999)-Fisheries Department, Chennai-
36.Breakwater Flume Studies of Thangassery Fishing Harbour (April 1999)-Harbour Engineering Department, Thiruvananthapuram
37.Barge Mounted Power Plant at Mangalore -Encon Services Pvt. Ltd. Chennai-
38.Model Testing of Breakwater Cross Section for Muthalapozhy Fishing Harbour (June 1999)-Harbour Engineering Department, Thiruvananthapuram
39.Seawall - North of Madras Harbour-Kampsax Industries, Chennai-
40.Ennore Manali Road Improvement Project -Additional Surveys and Numerical Modelling (November 1999)-Kampsax Industries, Chennai-
41.Numerical model studies for Rameswaram Fishing Harbour (September 1999)-IHH ,Poondi
42.Sea water intake well and jetty of Simhadri Power Plant of NTPC (November 1999)-Navayuga Engg. Co. Ltd., Visakhapatnam
43.Coastal Erosion Protection at Outer Wheeler Island (April 2000)-DRDO, New Delhi
44.Minor Fishery Harbour at Harwood Point, Kakdweep Dist.- Model Studies -West Bengal Fisheries Corporation Ltd., Calcutta
45.Model study for effluent disposal pipeline at simhadri make up water system-Navayuga Engg. Company ltd
46.Bathymetry survey for Arcottuturai, Tamil Nadu (April 2001)-Dept. of Fisheries, Govt of Tamil Nadu
47.Bathymetry survey for Portonova, Tamil Nadu-Dept. of Fisheries, Govt of Tamil Nadu
48.Bathymetry survey of punnakayal, Tamil Nadu-Inst. Of Hydraulics & Hydrology, Poondi
49.Sea Erosion on the north of Sriharikota Island Andhra Pradesh (October 2003)-Dept. of Space.
50.Hydrodynamic Performance of Geobags protected by Rip-Rap layer (January 2004)-Garware Wall Ropes Ltd, Pune.
51.Anti Sea Erosion work coastline north of Royapuram Fishing Harbour Near Ennore (January 2004)-Public Works Dept, Govt. of Tamil Nadu
52.Construction of a Fishery Harbour at Mahe, Pondicherry state (January 2004)-Government of Kerala, Harbour Engineering Department, Thiruvananthapuram.
53.Sea Protection works along Ennore Expressway (August 2005)-Tamil Nadu Road Development Company Limited, Chennai.
54.Model Study, Wave Flume Study under normal and storm conditions.-Afcons Infrastructure Limited, Mumbai.
55.Bathymetry survey and Numerical model study for periakadu groin work.-Water Resource Organisation, PWD, Madurai
56.EIA Report for Jetty at Bassein Port-Good Earth Maritime Limited, Chennai.
57.Pre cast concrete blocks for use in Marine Envivonment in the Breakwater at the Outer Arm and East Qudy at Chennai Port Trust - Chennai Port Trust, Chennai
58.Mudslides studies & Engg analysis for submarine pipelines in KG Offshore area-IEOT, Oil & Natural gas Commission, Maharashtra
59.Hydrographic survey of Nizampatnam-Good earth Maritime Ltd
60.Improvement schemes for keeping the mouth of river Kuantan, Malaysia open (November 2002)-Perunding Bakti, Kualalumpur, Malaysia (for Dept. of Irrigation, Govt. of Malaysia)
61.Construction of a fishery harbour at Cheruvathur – Model Studies (February 2005)-Government of Kerala, Harbour Engineering Department, Thiruvananthapuram.
62.Model studies for the proposed fishery harbour at Chettuvai (February 2005)-Government of Kerala, Harbour Engineering Department, Thiruvananthapuram.
63.Vizhinjam fishery harbour project – Siltation on the mouth of Wharf at Vizhinjam (July 2004)-Government of Kerala, Harbour Engineering Department, Thiruvananthapuram.
64.Suggesting comprehensive plan and design by conducting mathematical and physical model studies for the minor commercial and fisheries harbours in Karnataka state (September 2004)-Government of Karnataka, Department of Ports & Inland Water Transport.
65.Development of adequate road connectivity to Chennai and Ennore port – sea protection work – Hydrographic surveys-RDS Project LTd, Chennai
66.CPCL-5.8 MGD Desalination project at Ennore – Engg. Related to intake well with pumphouse and jetty (January 2004)-Chennai Petroleum Corporation Limited, Chennai
67.Off-shore pipe protection for GIDC Effluent pipeline (June 2005)-Larsen & Toubro Limited, Chennai
68.Tamil Nadu sea coast – Effect of Tsunami – proposal for construction RMS walls/groynes/retaining walls-consultancy services-Public Works Department, Chennai
69.Construction of a groyne field – numerical studies and site survey at Chennai Port (May 2005)-Chennai Port Trust, Chennai
70.Numerical modeling studies at Impound for dock off Tekra (February 2007)-Kandla Port Trust, Gujarat
71.Model studies for minor fishery harbour at Harwood point, West Bengal (March 2005)-West Bengal Fisheries corporation ltd., Kolkata
72.Extension of South Breakwater – Model studies (August 2005)-Paradip Port Trust, Orissa
73.Shore protection works – numerical model studies (August 2005)-Paradip Port Trust, Orissa
74.Development of fishing harbour at Chellanam in Ernakulam district – model studies (February 2006)-Government of Kerala, Harbour Engineering Department, Thiruvananthapuram
75.Off-shore pipe protection for GIDC Effluent pipeline-Larsen & Toubro Limited, Chennai
76.Construction of Ettikulam fish landing centre in Kannur district – model studies (July 2005)-Government of Kerala, Harbour Engineering Department, Thiruvananthapuram.
77.Development of fishery harbour at Arthungal – Model studies (February 2006)-Government of Kerala, Harbour Engineering Department, Thiruvananthapuram
78.Shore Protection Works along Ennore Expressway, Chennai – Design of shore protection measures between groyne field 1 & 2-Tamil Nadu Road Development Company Ltd.
79.Bathymetry survey and numerical modeling for the construction of groin at Periyathalai (June 2005)-WRO, PWD, Korapallam Division
80.Rock Dredging at Visakhapatnam Port Trust (July 2006)-Dredging Corporation of India Limited, Visakhapatnam
81.EIA Study for fishing harbours at Anthervedipallipalem (January 2006)-Animal Husbandry, Dairy Development & fisheries Dept., Govt of A.P., Hyderabad.
82.EIA Study for fishing harbours at Nizampatnam (July 2006)-Animal Husbandry, Dairy Development & fisheries Dept., Govt of A.P., Hyderabad
83.Repairing the damaged slipway Redesigning the structure at Chennai fishing harbour (January 2006)-Chennai Port Trust
84.Fisheries-Improvement of Pondicherry fishing harbour-preparation of feasibility report for the proposed construction of quay in the existing fishing harbour, Thengaithitte, Pondicherry-Govt. of Pondicherry Dept. of Fisheries and Fisherman welfare Botanical Garden Premises, Pondicherry
85.Shore protection measures for Kerala coastline (January 2006)-Science, Technology & Environment Dept., Thiruvananthapuram
86.Construction of revetment for control of erosion on the eastern side of east quay in Chennai Port – Conducting flume test on model (February 2006)-Chennai Port Trust
87.Erosion at Minor Fishing Harbour at Sultanpur (February 2006)-West Bengal Fisheries Corporation Ltd.
88.Coastal Protection Works – Construction of Groyne at Ratchagar Street in Kanyakumari – Conducting bathymetry survey and numerical modeling studies (March 2006)-Public Works Department, Nagercoil
89.Ennore Port Expansion Proposals-Environment Clearance - Advisory assistance for conducting study.-Ennore Port Limited
90.Bid preparation of Design and construction of breakwaters for the proposed Port facility at Karaikal (March 2006)-RDS Project LTd, Chennai
91.ISTK-1-Seawater Intake, outfall & product water conveyance system of CPCL project, Manali, Chennai-system study including computer based CFD analysis for intake sump (May 2006)-Navayuga Engg. Company ltd
92.Dispersion of high saline discharge studies for Chennai Water Desalination Ltd. (May 2006)-Madras Research Centre of Central Marine Fisheries Research Institute
93.Government of Kerala-H.E.D.-Road from Eravipuram-Paravoor in Quilon District-Numerical study (May 2006)-The Chief Engineer, Govt.ofkerala, Harbour Engg.Dept, Thiruvananthapurm.
94.Protection of Karaikal Coast (November 2006)-Irrigation and Public Health Division, Karaikal
95.Coastal protection works –extn. of groyne @ Periyakadu in Kanyakumari district (155m) – Bathymetry survey (May’06 to Nov’08)-WRO, PWD-Nagercoil
96.Coastal protection works – construction of groyne @ Mannakudi village in Kanyakumari district – Bathymetry survey. (December 2006)-WRO, PWD-Nagercoil
97.TTDC Ltd. – Engg. wing – inspection of HT (Beach, resorts, Complex), Mamallapuram (July 2006)-Tamil Nadu Tourism
98.Development of fisheries Harbour at Arnala, Taluka vasai, Dist, Thana, Maharashtra. Investigation & preparation of Techno Economic feasibility report-conducting numerical model study and recommendation there of. (February 2007)-West Bengal Fisheries Corporation Ltd.
99.Construction of 50m wharf for coast guard at Vizhinjam – conducting model studies-Government of Kerala, Harbour Engineering Department, Thiruvananthapuram.
100.Krishnapatnam Port Project – Tranquility and 2D Model studies (Sep’07 to Mar’09) -Krishnapatnam Port Company
101.HED – Construction of a fishing harbour at Chethi in Alappuzha District – model studies (March 2007)-Government of Kerala, Harbour Engineering Department, Thiruvananthapuram.
102.EIA and EMP for Gopalpur Port-Gopalpur Port Limited
103.Design of Breakwater and Diaphragm wall at Nagai Port (January 1998)-Tamil Nadu Maritime Board
104.Advisory Assistance for EIA to Ennore Port (March 2006)-Ennore Port Limited
105.Design of Breakwater at Cuddalore Port-Tamil Nadu Maritime Board
106.Design of Breakwater and Rehabilitation of Diaphragm wall at Nagapattinam Port (November 1997)-Tamil Nadu Maritime Board
107.Design of outfall for seawater desalination Manali-Afcons Infrastructure Limited, Mumbai.
108.Monitoring Rehabilitation of Cuddalore and Nagapattinam Port-Tamil Nadu Maritime Board
109.Numerical Model Studies for offshore Terminal off Tekra with Dredge pit at -9.4m (June 2006)-Kandla Port Trust
110.Disaster Management Department – Study on Coastal Protection on the Entire Coast of the State – Government of Kerala (May 2007)-Revenue Department, Govt. of Kerala,Thiruvananthapuram
111.WRO – Construction of two Groynes of 400m length (each) at Theresapuram in Thoothukudi District (Feb’07 to Feb’09)-WRO, PWD, Korampallam Aru Basin Division, Thoothukudy
112.WRO – Construction of Groynes at Idinthakarai at Tirunelveli District. (May 2007)-WRO, PWD, Chittar Basin Division,Tenkasi
113.Construction of Ro-Ro Berth at the Southern end of the Container Terminal – Numerical model Studies to Verify Tranquility. (June 2007)-Chennai Port Trust
114.Coastal Protection from Sea Hawk Golai at Digha to Jaida in the district of Purba Medinipur – Conducting models study for suggesting measures for beach nourishment (Sep’07 to Mar’09)-Irrigation & Waterways Directorate, Government of West Bengal
115.Study of protective measures along the sea shore by preventing the sea erosion at shore tank facilities (STF) at Puthuvypeen, Kochi (Oct’07 to Oct’08)-Bharat Petroleum Corporation Limited
116.Harbour Engineering Dept – Extension of the breakwaters at Azheekal Port, Kannur District – Model Study (Oct’07-Oct’08)-Government of Kerala, Harbour Engineering Department, Thiruvananthapuram.
117.Design of Marine outfall system for SIMA textile processing centre ltd (November 2007)-IL & FS Cluster Development Initiative Ltd
118.Establishing stability number for Kolos, using Hudson’s formula (Jan’08-Jan’10)-Krishnapatnam Port Company Ltd.
119.Conducting Physical Model Studies for typical sea wall cross section (Jan’08-Jan’10)-Govt. of Kerala
120.Anti Sea Erosion and beach safety project – Reconstruction of river training wall groyne at Kaduvayar and Kallar in Nagapattinam (Feb’08-Aug’08-Govt. of Tamil Nadu
121.Chennai – Ennore Port connectivity project – construction of a groynes and sea walls along the Ennore Expressway – Rectification of damages to the Groynes during the super – cyclone in Nov 2007 (Mar’08-Mar’10)-TNRDC
122.Stability analysis of rubble mound break water cross section for Arnala.(Apr’08- Apr’09)-West Bengal Fisheries
123.Mathematical modelling for development of Yarada fish landing centre (May’08-May’10)-Hauer Associate, Chennai
124.Physical Model testing of breakwater sections for Karaikal port project (May’08-May’10)-MARG Karaaikal port private limited
125.Mathematical Modelling for Development of Nizampatnam fishing harbour (May’08-May’10)-Hauer Associate, Chennai
126.Re-examining of the breakwater sections for Karaikal port project.(July’08-Jan’09)-MARG Kaaraikal port private limited
127.National Round Robin on Tsunami Modelling for Kalpakkam site (Aug’08-Aug’10)-Safety Research Institute
128.Numerical model studies for six specifc coastal stretches along kerala coast (Aug’08-Aug’10)-Government of Kerala
129.Numerical model studies for coastal protection along edavanakkad coast (December 2008)-Government of Kerala
130.Review on the Kattupalli breakwater layout (December 2008)-Larsen & Tourbo Limited
131.Desk studies for design of coastal protection works at Uppada Near Kakinada (Sep’09-Sep’10)-Uppada Beach Erosion
132.Numerical model studies for shore protection at Thalassery in Kerala coast (February 2009)-Harbour Engineering Department
133.Conducting numerical model studies for shore protection at Vatakara Sand Bank in Kerala coast (March 2009)-Harbour Engineering Department
134.Shipyard – cum – minor port project at Kattupalli Tamilnadu (Feb’09-Aug’10)-L & T Shipbuilding Ltd.
135.Numerical model studies for coastal protection at Kandekkadu Malakhapady in) Chellanam (Mar’09-Government of Kerala
136.Design the outfall from proposed CETP to below the sealevel for Mangalore SEZ project (Apr’09-Apr’10)-Voyants solutions pvt ltd.
137.Training works at Veli to keep the mouth open to control flooding in Thiruvananthapuram (Apr’09-Apr’11)-Harbour Engineering Department
138.Study on feasibility of locating mini fishing harbor north of BPCL KR’s short tank Puthuvypeen, Kochi-Bharat Petroleum Corporation Limited (May 2009)
139.Conducting of model studies of Tranquility condition for jetty facility to import coal for Dhopawe TPS (May’09-April’10)-Dhopawe – TPS
140.Conducting numerical model studies for coastal protection at Kannamaly in Chellanam Island (May’09)-Government of Kerala
141.Proof Checking for the bank protection at certain stretch of river Brahmaputra (Feb’09-Aug’10)-Garware Wall Ropes Ltd.
142.Breakwater at fish landing centre at Betapur, A&N Island (October 2009)-West Bengal Fisheries
143.Proof checking of design & drawings of breakwater for L&T shipyard cum port project at Kattupalli(Oct’09-Oct’10)-L&T Proof checking
144.Stability check of (i)sea-dyke for digha coast and (ii)Groins arrest coastal erosion in digha-sankapur-chandpur-jalda area (Jan’10)-Govt. of West Bengal
145.Brine dispersion study for temporary outfall for CWDL (Oct’09-Oct’10)-Chennai Water Desalination
146.Construction of fishing harbor at Valiyathura in Thiruvananthapuram District – model studies (December 2010)-Harbour Engineering Department
147.Fishing Harbour at Chellanam – Construction of Breakwaters (April 2010)-Habour Engg. Dept.
148.Testing of Kolos Armour Units (November 2010)-Krishnapatnam port
149.Shore Protection for Colachel fishing harbor (July 2010)-Institute of Hydraulics & Hydrology
150.Physical model testing for the upper zakum project (April 2010)-Sogreah Gulf Fzco
151.Maldives Tsunami Reconstruction project, Harbour Rehabilitation in selected islands (ungoofaaru, Manadhoo & Makundhoo), Republic of Maldives (July 2010)-Central Engineering Consultancy Bureau
152.Brine dispersion study for reject water desalination plant at NTECL (November 2010)-NTECL
153.Measurement of uplift pressure on a concrete pavement over the crest of the Krishnapatnam port breakwater (October 2011)-Krishnapatnam port
154.Technical study in connection with the sea erosion occurring along the coast of fort Kochi Chellanam channel (March 2011)-Cochin Port Trust
155.Shore protection along adjacent coastal stretches of cochin port due to deepening of navigation channel (March 2011)-Cochin Port Trust
156.Littoral transport study (December 2010)-Rajakamangalamthurai
157.DPR for Kanakesanturai harbor project at Srilanka (May 2011)-Port and Water Resources,Rites Limited
158.Consultancy for development of fishing harbor at Cutbona (Sal River) and at Chapora (River Chapora) in the state of Goa (August 2011)-West Bengal Fisheries Corporation Ltd.
159.Investigation of shoreline stability against coastal erosion at Bhadreshwar (July 2011)-OPG Power Gujarat Pvt. Ltd.
160.Improvement and widening to four land with both sides roads of Ennore Expressway from km1/600 to 7/538 (August 2011)-Coastal SPL-JV
161.Bathymetry survey in the vicinity of proposed intake pipeline, Kattupalli (August 2011)-L&T Shipbuilding Limited
162.Coastal Protection along the stretch adjacent to Coromandel Fertilizer, North Chennai (January 2012)-Coromandel International Ltd.
163.Construction of coastal road along the sea shore in Chennai Port (February 2012)-Chennai Port Trust.
164.Coastal Protection along the stretch of Parayakadavu, Kerala (June 2012)-Irrigation Division.
165.Coastal Protection along the stretch of Pallana Coast, Kerala (July 2012)-Irrigation Division.
166.Coastal Protection along the stretch of Perumpally, Kerela (July 2012)-Irrigation Division.
167.Coastal protection along the stretch of vakalapudi-Edatam road, Kakinada (September 2012)-Govt. of Andhra Pradesh
168.Training wall design at Punnaikayal in Thoothukudi District, Tamil Nadu, PWD (January 2013)-PWD
169.Numerical model study for the proposed fishing harbor at Chellanam, Ernakulam District, Kerala (November 2012)-Harbour Engineering Department
170.Rehabilitation of revetment for sea shore protection along Collector Bungalow, Tuticorin (February 2013)-PWD
171.Shore protection work along the stretch of Vivekanandar colony, Thoothukudi (March 2013)-PWD-
172.Climate change adaptation in rural areas of India-CCA RAI. Pilot project in Mousuni Island, West Bengal (July 2013)-GIZ-
173.Bank protection for Kuttanad, Kerala (November 2013)-Techfab India Industries Ltd
174.Stability Analysis of WUP during floatation-M.N.Dustur & Company (P) Ltd.
175.Conducting bathymetry study, design and formulation of specification for shore protection measures along IREL mining area (July 2013)-Indian Rare Earths Limited
176.Engineered Reefs for mitigating wave disturbance inside Kahului harbor, Maui (October 2013)-Univ of Hawaii
177.Construction of Dedicated Berth and other Infrastructural Facilities for the administration of the union Territory of Lakshadweep at Beypore, Calicut SH: Hydraulic Model Studies (June 2013)-Central Public Works
178.APPDCL-Seawater intake and outfall system with groynes, open channel system for 2x800 MW SDSTPS, Krishnapatnam, Nellore District (February 2013)-Navayuga Engg. Company Ltd.
179.Tranquility study in the harbor basin with partially completed BW-Gopalpur port ltd.
180.Techno-economic feasibility study for setting up of a new major ort at Dugarajapatnam in Andhra Pradesh-Rites Ltd.
181.Feasibility study on the development of fish landing facility in Kanyakumari District-Department of Fisheries.
182.Construction of Groyne at Periyathalai in Trichendur Taluk of Thoothukudy District (February 2014)-PWD
183.Construction of Groyne at Kallamozhi in Trichendur Taluk of Thoothukudy District (February 2014)-PWD
184.Construction of Groyne at Veerapanidapattinam in Trichendur Taluk of Thoothukudy District (February 2014)-PWD
185.Consultancy Contract for Construction of Seawall at TERLS, VSSA, Thumba, Trivandrum-Vikram Sarabhi Space Centre
186.Preparation of DPR for creating a protective zone for pilgrims safety in the Ocean off Velankanni church-Velankanni Town Panchayat
187.Collection of field particulars and evolution of design for construction of groyne at Keelavaippar in vilathikulam taluk of thoothukudi-PWD
188.Stability of section built using geosystems for coastal protection along the coast of Kerala (July 2014)-Maccaferri
189.Design of suitable coastal protection scheme for coast stretch of Kollam District, Kerala (March 2014)-WRD
190.Design of suitable coastal protection scheme for the coastal stretches of Alappad centre and Azheekal, Kerala (March 2014)-WRD
191.DPR for the creation of safe beach landing facilities at Kadiyapattinam-Parish council, St. Peter & St.Paul Church
192.Design of suitable coastal problem scheme for the coastal stretches of Alapuzha district, Kerala (March 2014)-Irrigation Dept.
193.Shore protection measures along KMML block, Kerala (July 2014)-Kerala Minerals and Metals Ltd
194.Ennore to Ernavurkuppam – Construction of groins – design and model studies (September 2014)-PWD
195.Disaster management, Risk assessment plan-construction of groins Ennore to Ernavoorkuppam (September 2014)-WRD
196.Preparation of DPR for reconstruction of fishing harbour at Mookaiyur- mathematical and physical model studies. -WAPCOS.
197.Shore protection work for the coast of St. Micheal Church - Thanni, Kerala -Irrigation Dept, Govt. of Kerala
198.Shore protection work for the coast of Kakkathope, Kerala -Irrigation Dept, Govt. of Kerala
199.Shore protection work for the coast of Thanni, Kerala -Irrigation Dept, Govt. of Kerala
200.Shore protection work for the coast of Kulathilpadom to Garfil Nagar, Kerala -Irrigation Dept, Govt. of Kerala
201.Shore protection work for the coast of Thirukunnapuzha, Kerala -Irrigation Dept, Govt. of Kerala
202.Shore protection work for the coast of Ayiramthai, Kerala -Irrigation Dept, Govt. of Kerala
203.Shore protection work for the coast of Pallipattumuri, Kerala -Irrigation Dept, Govt. of Kerala
204.Shore protection work for the coast of Chennaveli, Kerala -Irrigation Dept, Govt. of Kerala
205.Shore protection work for the coast of Chettikadu, Kerala -Irrigation Dept, Govt. of Kerala
206.Shore protection work for the coast of Arattupuzha, Kerala -Irrigation Dept, Govt. of Kerala
207.Shore protection work for the coast of Alappad, Kerala -Irrigation Dept, Govt. of Kerala
208.Shore protection work for the coast of Azheekal, Kerala -Irrigation Dept, Govt. of Kerala
209.Shore protection work for the coast of Chettikadu, Kerala -Irrigation Dept, Govt. of Kerala
210.Shore protection work for the coast of Arattupuzha, Kerala (November 2015)-Irrigation Dept, Govt. of Kerala
211.Consultancy services for Pudhukuppam Fishing Creek, Cuddalore, Tamil Nadu-IL & FS Tamilnadu Power Company Ltd
212.Establishment of offshore numerical tank: Preparation of project report on establishment of physical test facility (NIOT) (December 2014)-National Institute of Technology
213.Mathematical model studies for proposed extension of existing groins to prevent an unpredicted siltation in open channel of SWIOS, 2x800mw SDSTPS, Nellore (March 2015)-Navayuga Engg. Company Ltd.
214.Stability of existing breakwater at Paradip Port due to Deepening to -20m and suggestion of mitigation measures (November 2014)-Rites Limited
215.Consultancy studies to undertake field monitoring of shoreline changes and intake basin for SWIO system for a period of one year (December 2014)-Wapcos
216.Re-asses the variations in the seabed level and shoreline advancement and its impact near the new CPCL intake well location (December 2014)-L&T Shipbuilding
217.Study on Tidal and Wave Energy in India and Development of a Roadmap (December 2014)-Crisil
218.Consultancy charges for development of fish landing centre at thoothoor in Kanniyakumari District (January 2015)-Fisheries Department
219.Design of groin section for the extended portion at Sea water intake system for 2x800MW APGENCO, Nellore (May 2015)-Navayuga Engg. Company Ltd.
220.Design of suitable coastal protection scheme for the coastal stretches of Alappuzha district, Kerala-Irrigation Division Alappuzha, Kerala
221.Design and Physical modeling of revetment and breakwater extension for the Creation of additional open space of 60 Hectares by reclamation near Gate No.1 to the north of Bharathi Dock adjacent to Eastern Breakwater in Chennai Port (April 2015)-Chennai Port Trust
222.Construction of groins at Beemapally, Thiruvanathapuram (July 2015)-Irrigation Department, Thiruvanathapuram
223.Construction of fishing harbour at valiyathura in Thiruvanathapuram (August 2015)-Harbour Engineering Dept.
224.Consultancy services for undertaking mathematical model studies for the proposed reconstruction and modernization fishing harbour at Mallipattinam in Thanjavur District. (November 2015)-Wapcos Limited
225.Stability and dredging of Eden Channel (November 2015) -Kolkata Port Trust
226.Study for long term measures to prevent the shoreline erosion at STF, Puthuvypeen (October 2015)-Bharat Petroleum Corporation Limited
227.Hydrodynamic and geotechnical stability of section built using geosystem for the coastal protection (December 2015)-Flexituff International Limited
228.Preparation of Comprehensive shoreline protection management plan/Scheme for the entire coast of Tamil Nadu in compliance with the orders of Hon’ble NGT for the protection of the coast (January 2016)-Department of Enviornment
229.Studies on outer harbour vis-à-vis proposal to handle CAPE size vessels in the inner harbour (August 2015)-Paradip Port Trust
230.Nearshore wave modeling and analysis of wave energy concentration near GCB Berth (Sep. 2015)-Kamarajar Port Trust
231.Conducting Mathematical model studies for revalidating the CWPRS studies including data collection for the development of an Outer harbour in Cochin Port (Feb.2016)-Cochin Port Trust
232.Shore protection measures to prevent the coastal erosion along the coastal stretch of IOCL Puthuvypeen (Mar. 2016)-Indian Oil Corporation Ltd
233.Development of web enabled GIS based integrated land management system for Paradip Port Trust (Feb. 2016)-Paradip Port Trust
234.Studies for Intake structures and Outfall structure for the proposed Srikakulam TPS (4x1000 MW) near Polaki, Srikakulam District (A.P) for APGENCO (July 2016)-WAPCOS Limited
235.Study on shore protection measures in front of Administrative building at V.O.Chidambaranar Port Trust (Aug. 2016)-V.O.Chidambaranar Port
236.Sinkage of breakwater at Azheekal (Sep. 2016)-Directorate of Ports
237.Implementation of Coastal Management Information System (CMIS) in the states of Tamil Nadu, Keral and UT of Puducherry (Oct. 2016)-Central Water Commission
238.Design of embankment section of protect the ongoing construction within the IOCL’s Cohin LPG Import Terminal project site (Oct. 2016)-Indian Oil Corporation Limited
239.Conducting mathematical model studies and detaile engineering of jetties, slipway and single point moorings with facilities and utilities in Island (Oct. 2016)-Rites Limited
240.Conducting mathematical model studies and Detailed Engineering of Jetties and slipway with facilities and utilities in Island (Oct. 2016)-Rites Limited
241.Monitoring of Eden channel stability and long term solution for dredging and disposal in navigational channels to Haldia (Oct. 2016)-Kolkata Port Trust
242.Hydrodynamics, Sedimentation Studies and Shoreline Management at Andhra Pradesh (December 2016)-SV Enviro labs & Consultants
243.Online survey for Periyathalai, Veerapandiapattinam and Kallamozhi (February 2017)-Public Works Department
244.Confirmation of alignment and orientation of the groyne for the work of Construction of Groyne at Vembar and Keelavaippar village in Vilanthikulam taluk of Thoothukudi District (March 2017)-Public Works Department
245.Periodical monitoring of the received body at the discharge point (Diffuser Outlet Point) for SWIO system for a period of three years at 2x800 MW SDSTPS Nellore (A.P.) (April 2017)-WAPCOS Limited
246.Field Monitoring of shoreline changes and intake basin for SWIO system for a period of three years at sea water intake and outfall system for 2x8002x800 MW SDSTPS Nellore (A.P.) (April 2017)-WAPCOS Limited
247.Modification to Groyne No 6 and Groyne No 7 to act as a breakwater and as a coastal protection measure. (April 2017)-Water Resources Dept
248.Project Management Consultant for the Kulhudhuffushi harbour expansion project, Maldives (May 2017)-WAPCOS Limited
249.Preparation of DPR and detailed engineering for project trident, Mauritius (July 2017)-Rites Limited
250.Feasibility study for the development of a jetty off GHCL, Sutrap ada (Mar. 2017)-GHCL
251.Consultancy studies for interconnection of pipelines, Hydraulic design of outfall system, Hydrodynamic & siltation studies and mathematical model studies for provision of SWIO system (Aug. 2017)-WAPCOS Limited
252.Feasibility study for investigating tranquility near the proposed naval jetty in Chennai (Sep. 2017)-Naval Project
253.Consultancy services for preparation of CPR for proposed naval jetty at Chennai (Nov. 2017)-Naval Project
254.Online survey for Periyathalai, Veerapandiapattinam and Kallamozhi (Feb. 2017)-PWD
255.Confirmation of alignment and orientation of the groyne for the work of Construction of Groyne at Vembar and Keelavaippar village in Vilanthikulam taluk of Thoothukudi District-PWD
256.Providing Architectural and MEP Services for Project Trident, Mauritius (Feb. 2018)-Rites Limited
257.Construction of fishing harbour at Tharangambadi in Nagapattinam District (March 2018)-Fisheries Department
258.Construction of fishing harbour at Vellapallam in Nagapattinam District (March 2018)-Fisheries Department
259.Extension of Groynes at Periyathalai Village Sathankulam Taluk in Thoothukudi District (April 2018)-PWD
260.Monitoring of Maintenance Dredging Outer Channel and Inner Harbour Area and Bathymetry Surveys at Cochin Port (February 2018)-Cochin Port Trust
261.Comprehensive Feasibility Studies (Techno-economic) to assess requirement of optimum quantum of Maintenance dredging for improvement of navigable depth in the shipping channel leading to Kolkata Dock System (March 2018)-Kolkata Port Trust
262.Conducting Hydrodynamic study in Kosasthalaiyar river mouth (Ennore Creek) and connected backwater (March 2018)-Kamarajar Port Limited
263.Study for Removal of Lock at HDC & Extended monitoring Study of Shopping Channel Leading to HDC (January 2018)-Kolkata Port Trust
264.Formation of geophysical information system(GIS) cell in the Tamil Nadu disaster management agency (June 2018)-Disaster Management
265.Construction of Groyne Fields at Vattachal, Arattupuzha, Pathiyankara, Ambalappuzha & at Kattoor in Alappuzha Dist. (August 2018)-Kerala Irrigation Infrastructure Development Corporation Ltd
266.Comprehensively study for the maintenance dredging requirement at deendayal port trust measures to reduce the cost (September 2018)-Kandla Port Trust
267.Appointment of third party inspection agency for bathymetry survey of dredging works (October 2018)-Mumbai Port Trust
268.Consultancy services for preparation of detailed project report and cost estimate in connection with coastal erosion protection measures at Gangasagar Island (Southern Face) under GBDA (October 2018)-Mackintosh Burn Limited
269.Consultancy services for conducting LNG jetty dredging study by NTCPWC (October 2018)-Kamaraj Port Limited
270.Detailed Engineering for construction of common user Manifold and project Management consultancy for its implemtation Jawaharlal Nehru Port Trust-Jawaharlal Nehru Port Trust
271.Detailed Project Report for setting up of Greenfield port at Ramayapatnam, Andhra Pradesh (January 2019)-Rites Limited
272.PWD/WRD Anti Sea erosion works construction of a series of 9 numbers of groynes from Ennore to Ernavoor kuppam LS along the Coastal 19000 – 15/200km area in Madhavaram taluk of Trivulluar Dt (January 2019)-Public Works Department
273.Shore Protection works from Kollam beach to Thanni in Kollam District (January 2019)-Kerala State Coastal Area Development Corporation Limited
274.Shore protection works in Vypin coastal area in Ernakulam District - studies and mitigation measures (March 2019)-Kerala State Coastal Area Development Corporation Limited
275.Project Management Consultancy Services for Project Trident Mauritius (May 2019)-Rites Limited
276.Monitoring of Maintenance Dredging at Outer Channel and Inner Harbour area and Bathymetry surveys at channels of Cochin Port (May 2019)-Cochin Port Trust
277.Sea coast protection for Vazhakkuttam and Ottamassery in Alappuzzha District, Kerala (July 2019)-Irrigation Division Alappuzha
278.DPR for the fish landing facility at Manappad (July 2019)-Fisheries Department
279.Preparation of detailed project report for the Improved Resilience of Urban Eco svstem to Climate Change through restoration of Pallikaranai Marsh Land (November 2019)-NABARD Consultancy services Private Limited
280.Wave flume studies for the proposed breakwaters at Arcottuthurai Fishing Harbour (December 2019)-Indomer Coastal Hydraulics Private Limited
281.Consultancy services for numerical wave propagation and shoreline change study for planning shore protection scheme of proposed FOB Tuticorin (December 2019)-Garrison Engineer
282.Implementation of Coastal Management Information System (CMIS) in the states of Tamil Nadu, Kerala and UT of Puducherry (January 2020)-Central Water Commission
283.Annual Maintenance, Support And Management Of Web-Enabled Gis Based Integrated land Management System For Paradip Port Trust (January 2020)-Paradip Port Trust
284.Study of siltation in LNG basin (January 2020)-Petronet LNG Limited
285.Technical study on GRW system of protection of walkway and flexi geotextile tubes as submerged groins for Beach Reclamation (January 2020)-Department of Tourism
286.Conducting physical model study for rehabilitation of north breakwater at Kamarajar port (January 2020)-Kamarajar Port Trust
287.Feasibility study for the construction of RCC jetty at Tapong village in Nancowrie group of islands (February 2020)-Andaman Lakshadweep Harbour Works
288.Tranquility study, detailed engineering design of breakwaters and berthing structure (February 2020)-Rites Limited
289.Preparation of detailed estimate and detailed drawings and tender document for assessment and rectification of north breakwater (March 2020)-Kamarajar Port Trust
290.Physical model study of cantilever Promenade (March 2020)-Larsen And Toubro Limited
291.Preparation of design and DPR for construction of tail end structure across river Coleroon to arrest seawater intrusion at Thiukazhipalai village of Chidambaram taluk (June 2020)-Public Works Department
292.TANGEDCO - ETPS Expansion Project (1x 660MW Supercritical) - Conducting bathymetric study and sediment sampling of locations at Ennore creek and Buckingham canal (July 2020)-TANGEDCO
293.Anti sea erosion study for various coastal stretches, Kooduthalai, Kootapuli, Koothankuzhi and Idinthakarai (July 2020)-Fisheries Department
294.Construction of Groyne Fields in the severe erosion prone areas in Ambalapuzha, Kattoor, Nllanikkal North of Vattachal and Ottamassery north of Cherthala in Alappuzha district (September 2020)-Kerala Irrigation Infrastructure Development Corporation Ltd
295.Model studies for development of Greenfield port at Bhavanapadu in Srikakulam district, Andhra Pradesh (September 2020)-Rites Limited
296.Comprehensive development of Muzhupilangad and Dharmadam Beach in Kannur District-Coastal protection work (November 2020)-Kerala Irrigation Infrastructure Development Corporation Ltd
297.Engineering, Design and Documentation of Erosion Control with Coastal Protection of ROP facilities at Hasik (November 2020)-Habog Consultants Private Limited
298.Confirmation of alignment and orientation of the groyne for the work of extension of groynes G1 and G2 at Keelavaippar village - Bathymetry and other survey works (April 2021)-Public Works Department
299.Model studies towards groynes layout, planning, design along Pudhupattinam village and Uyyalikuppam (2021)-Fisheries Department-
300.Project Management (PMC) services for development of Greenfield Port at Machilipatnam in Andhra Pradesh & Detaliled Project Report(DPR) for development of Greenfield Port at Bhavanapadu in Andhra Pradesh. (March 2021)-Rites Limited
301.Construction of offshore submerged dykes for coastal protection at Bommaiyarpalayam in Villupuram district - Alternate design by IIT Madras-Fisheries Department
302.Wave generation software supply (May 2021)-Samudra Consultants Private Limited
303.Construction of new fish landing centres at Neerody, Marthandamthurai and Vallavilai in Kanyakumari district (November 2020)-Fisheries Department
304.Re-visiting the design of coastal protection work at Odalarevu by IIT Madras (November 2020)-Oil Natural Gas Corporation
305.Sea coast protection for Vazhakuttam and Ottamassery in Alappuzha District, Kerala (June 2021)-Irrigation Division Alappuzha
306.Consultancy services on peer review of Breakwater design for Fishing Harbour at Chetty in Alappuzha district (June 2021)-Kerala Infrastructure Investment Fund Board
307.Shore protection works in Vypin coastal area in Ernakulam District - studies and mitigation measures (September 2021)-Kerala State Coastal Area Development Corporation Limited
308.Detailed Engineering Design for Perkhidmatan Perunding Bagi Rekabentuk Terperinci Projek Pemuliharaan Muara Sungai Kerang, Mukim Sungai Tinggi, Perak (October 2021)-PB JURUTERA SDN BHD
309.Consultancy services for preparation of detailed project report for protection measures for Vakalapudi – Edatam Road (Beach road) in East Godavari District (October 2021)-Government of Andhra Pradesh
310.Proof checking of report on design engineering of marine outfall pipeline at Kesanapalli, Andhra Pradesh (October 2021)-Indomer Coastal Hydraulics (P) Ltd.
311.Preparation of DPR for Maldives Coast Guard Facilities at Uthuru Thila Falhu (UTF)” Island (September 2021)-Rites Limited