Hello! My name is Aaron Ziolkowski and I have been working under Eric Furlong with division 550 on the Meta Data Center Project in DeKalb IL. This project is a large scale campus of currently 3 different data centers with plans to expand further. Since there are multiple buildings in the scope of work I have been able to see a many different phases of construction while being on site. During the summer I have been able to observe both fiber and cable pulls, cable terminations, duct bank installation, transformer setting, as well as unrelated work that is performed by the other disciplines on site. Along with observing the site evolve over the summer I have been assisting with inspections, takeoffs, project tracking, and project organization. The experiences I have had during this project helped be grow in both understand in and confidence with electrical contracting.