Testing is crucial phase before final flight testing. We need to test all the electrical and mechanical connections to prevent possible failures in the system. Testing of the battery load and motor were also crucial during testing period. We need to test the motor to ensure that they were configured properly in Mission Planner and that they were all operating properly. Additionally, we verified that each of the sensors connected to the PixHawk was operational.