Publications

My Google Scholar                           My Research Gate                     My Publons Account

Journal Papers 

1- Karzan, M., Abdul Qder, R., Prshing, A. (2005).Application of Information Technology for developing Information system. Tanmiat Al-Rafidain, 29(77),

2- Karzan, M. (2007). Inventory Control Model building for slow Moving Items in Baghdad Electricity  Distribution State. TANMIAT AL-RAFIDAIN, 29(85), 137–150.

3- Ghafour, K., Ramli, R., & Zaibidi, N. (2014). A Simulation Approach to Determine the Probability Demand during Lead-Time When Demand Distributed Normal and Lead-Time  Distributed Gamma. Journal of Economics and Behavioral Studies, 6(11), 840–847.

4- Ghafour, K., Ramli, R., & Zaibidi, N. Z. (2015). Development of multi-item EOQ when the constraints of investment and storage capacity are active. In AIP (Vol. 030005, p. 030005). Doi:10.1063/1.4937024

5- Ghafour, K., Ramli, R., & Zaibidi, N. . (2016). Optimizing safety stock in cement industry when the demand during lead-time distributed Generalized Gamma four-parameters. International Journal of Applied Mathematics and StatisticsTM, 54(1), 33–40.

6- Ghafour, K., Ramli, R., & Zaibidi, N. (2016a). Developing a Continuous Review (R, Q) Policy when the Demand during Lead-time distributed Generalized Gamma four-parameters. International Journal of Applied Mathematics and StatisticsTM, 54(2), 15–26.

7- Ghafour, K  & Rezan, H.Rashid (2017). Optimizing Multi-Item EOQ when the Constraint of Annual Number of Orders is Active. Modern Applied Science, 11(1),55-61. doi:10.5539/mas.v11n1p55.

8- Ghafour, K., Ramli, R., & Zaibidi, N. Z. (2017). Developing a M/G/C-FCFS queueing model with continuous review (R,Q) inventory system policy in a cement industry. Journal of  Intelligent & Fuzzy System, 32,4059 4068. http://doi.org/10.3233/JIFS-152509

9- Ghafour, K. M. (2017). The Role of Items Quantity Constraint to Control the Optimal Economic Order Quantity. Modern Applied Science, 11(9), 61. doi:10.5539/mas.v11n9p61.

10- Ghafour, K. M. (2018). Optimizing safety stocks and reorder points when the demand and the lead-time are probabilistic in cement manufacturing. Int. J. Procurement Management, 11(3), 387–398. DOI:10.1504/IJPM.2018.10010978

11- Aljanabi, A.R.A. and Ghafour, K.M. (2020), "Supply chain management and market responsiveness: a simulation study", Journal of Business & Industrial Marketing, Vol. ahead-of-print No.  ahead-of-print.https://doi.org/10.1108/JBIM-12-2019-0514

12- Ghafour, K. M. Establishing inventory measurements using intermittent demand forecasting. Journal of Intelligent &  Fuzzy Systems, vol. 42, no. 4, pp. 3465-3475, 2022. DOI: 10.3233/JIFS-211454

13 Ghafour, K.M., Aljanabi, A.R.A. The role of forecasting in preventing supply chain disruptions during the COVID-19  pandemic: a distributor-retailer perspective . Oper Manag Res (2022). https://doi.org/10.1007/s12063-022-00327-y 

14. Ghafour, K. (2023). Multi-objective continuous review inventory policy using MOPSO and TOPSIS methods. Computers & Operations Research, 106512. https://doi.org/10.1016/j.cor.2023.106512  

15. Aljanabi, A. R. A., & Ghafour, K. M. (2024). Fuzzy AHP and Fuzzy TOPSIS methods of analysing online impulsive buying of organic food: A cognitive-affective decision-making perspective. Journal of Intelligent & Fuzzy Systems, Vol. Pre-press, no. Pre-press, pp.1-16. https://doi.org/10.3233/JIFS-237400 


 

Conference Papers 

1. 1st Innovation and analytical conference and Exhibition (IACE 2013) on 29 December 2013 at Convention center, UUM, AIP Conference Proceedings.

2. Karzan, G., Ramli, R., & Zaibidi, N. (2014, September). A Simulation Approach to Determine the Probability of Demand during Lead-Time When Demand Distributed Normal and Lead-Time Distributed Gamma. International Conference on research Methods in Management and social Sciences ( ICRMMS-2014): Proceedings of the 6th International Conference on research Methods in Management and social Sciences (14-138, P.183-190). Kuala Lampur, Malaysia.

3. Ghafour, K. M., Ramli, R., & Zaibidi, N. Z. (2015, December). Development of multi-item EOQ when the constraints of investment and storage capacity are  active. In Innovation And Analytics Conference And Exhibition (IACE 2015): Proceedings of the 2nd Innovation and Analytics Conference & Exhibition (Vol.1691,  p. 030005-(1-9)). AIP Publishin. AlorSetar, Malaysia.