Preliminary design report (Sept 4, 2018) can be found here
Muon steering group review (Aug 3, 2018) can be found here
TDC specification review (April 27, 2018) can be found here
ePLL-only document can be found here
TDC v1 configuration parameters can be found below
Internal design review of TDC v2 (Sept 10, 2019) can be found here
Final design review can be found here
Follow-up with FDR can be found here
Final production
FDR (Aug 5, 2021) can be found here
Followup meetings #1, #2, #3, #4
Production Readiness Review
TDC QC