Daily Schedule
Day 1 4-4 What is Engineering and Introduction to Engineering
Day 2 4-5 Engineers Can Do Anything DVD and 1.1 Crossword
Day 3 4-8 Act. 1.1.4 What Is Technology
Day 4 4-9 Act 1.2.1 Design Process
Day 5 4-10 Act 1.2.2 Design Elements and Design Brief
Day 6 4-11 Act. 1.3.1 Standard and Metric Measuring
Day 7 4-12 Early Measurement and Act. 1.3.3a Precision Measuring
Day 8-9 4-15 & 4-16 Build the Skimmer
Day 11 4-17 Act. 1.4.1 Sketching Techniques
Day 12 4-18 Act. 1.4.2 Sketching Practice
Day 13 4-22 Act 1.4.4 Orthographic Projection
Day 14 4-23 Act. 1.5.1 Descriptive Geometry and the Coordinate System
Day 15 4-24 Act. 1.5.2 Computer Modeling Fundamentals
Day 16 4-25 Parametric Modeling
Day 17 4-26 Act. 1.5.4 Sketching Plane Cube
Day 20 5-1 Act. 1.4.5 Dimensioning
Day 21-25 5-2 until 5-8 Act. 1.5.5 Pegboard Toy
Day 26-28 5-9 until 5-11 Birdhouse ASM
Day 29-30 12-14 Act. 1.5.6 Bracket
Day 31-32 12-17 and 12-18 Bolt ASM
Day 34-35 12-20 & 12-21 Monkey Bar ASM
Day 38-39 5-18 Climbing Wall ASM
Day 41-42 5-22 & 5-23 Assemble Playground
Day 43 5-24 Add Railings to the Playground
Day 44-End of Quarter 5-25 until 5-29 Wheel ASM (If time allows)