1) Verify IP/subnet/gateway and host name with location
2) If the node will be a gateway to the other nodes turn on GNE and Proxy ARP so it will respond to ARP requests or nodes behind it.
3) Configure Node ID
4) Setup Optical Power Control to manual for time of configuring (when is finished bring it to automatic).
5) Set up other parameters wen you at this page as required. Set clock, time zone, OSPF routing, etc...