BSc Graduation Projects:
2013-2014
1- Underbalanced Drilling Engineering. Supervisor of 4th stage Petroleum Engineering Department.
2- Well Control Using DrillBench Software .Supervisor of 4th stage Petroleum Engineering Department.
3- Production Optimization and Modeling. Supervisor of 4th stage Petroleum Engineering Department.
2014-2015
1. Killing a High Rate Blowout Through a Relief Well. Supervisor of 4th stage Petroleum Engineering Department.
BSc Graduation Projects:
2015-2016
1- Well Control Using MPD Approach. Supervisor of 4th stage Petroleum Engineering Department.
2- GOC & WOC observations .Supervisor of 4th stage Petroleum Engineering Department.
2016-2017
1- Managing Pressure During Underbalnced Drilling.
2- Pore Pressure Detection From Real-time Drilling Data.
2017-2018
1- Sand Control Strategy and Management
2- Managed Pressure Drilling Candidate Selection
3- Matrix Acidizing of Carbonate Formations
4- Rig Site Modeling
5- Extended Reach Well Control
2018-2019
1- Production Optimization using gas lift technique
2- GOC & WOC Observations: A Case Study
2019-2020
1- A Comparative Study of Sand Control Technology Methods
2- Managing Pressure During Underbalanced Drilling
3- Matrix Acidizing of Carbonate Formations
4- Risk Assessment of oil and gas pipeline by GIS and Remote sensing in KRG
2020-2021
1- Experimental analysis of different loss control materials for combating lost circulation while drilling tertiary formations in Kurdistan fields
2021-2022
1- Filtration Properties of Water Based Drilling Fluids