Project Objectives
High Priority Objectives
Design Universal Force Reader FixtureÂ
Compatible with 35+ different SLK Head Variations
Accurate within <0.1% error
User Friendly: Easy to Navigate
Low Priority Objectives
Mock Device-Under-Testing (DUT) that can generate heat
Also used to test the functionality of the Eclipse
Designed to mimic thermal loads while under testing
Fixture must be adaptable to install this mock DUT
WOW Solution
Fabricate and present a physical design solution by the end of the quarter
Risk Reduction Strategy
Load Cell Risk Reduction
Base Plate FEA Analysis
Mounting Fixture Risk Reduction
Intermediate Milestones
Selection of Sensor
Selection of Material & Dimensions for Base Plate
Designs of 4/5 different mounting fixtures for various SLK head shapes