Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Metal tubes added to the device as a track for the stylet
31g Stylet penetrates 6mm into ballistec gel, while 24g goes into 8mm
Stylet is now manually retractable
Since the device is one time use, for ease of use, the device will come preloaded opposed to reloadable now
Accomplishments from Previous Week
Device finalization with retractable stylet and fluid path
Adhesive pads for attaching the device to a patient has arrived!
Analysis has been added to the report
2 additional devices printed out to be assembled
Fatigue Analysis of Torsion Spring
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Complete report with feedback from Team 7 (Ryan)
Prepare for final review for sponsors (Ryan)
Complete a Draft for the Poster (everyone)
Showcase the device for sponsors (everyone)
Assemble additional devices for presentation (Peter)
Determine shelf life of this preloaded spring (Maverick)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Mass production plans
30 CapBio Prototype sets will be created for $3000-5000
Once buying in mass quantities, will cost between $1.40 and $1.80
“Fatigue Analysis” -> What is the shelf life of the device if the spring is pre-loaded for 2 years?
Ratchet/pawl is a design modification we have created to test the penetration of the skin
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Presentation comments (5/22/2017) with Dr. Tustaniwskyj, Pedro Navarro
Linear buckling analysis may be more forgiving than curved beam buckling
Recommended not using solidworks FEA, so we didn’t
Rationalize why the ratchet and pawl design solution was chosen
Show off more analysis (i.e. dynamic system model)
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
n/a
Risks and Areas of Concern
Will all our devices work as intended for the design review with the sponsors
Resources or Information Required but not Available
n/a
Schedule
Design review with sponsors (6/2/2017)
Gantt Chart Updated.
Budget (list amount spent and amount remaining)
Budget:$700.00
Spent: $303.85
Remaining: $396.15
Progress on Report and Webpage
Progress report updated (5/30/2017)
Most Current draft of report is on webpage
Some analysis is added
Awaiting feedback from peers