Overview of Status of Analysis, Design, Fabrication, Tests, etc.
close to completion, only need the control unit to be able to increase/decrease the temperature set point.
Accomplishments from Previous Week
experimentally calibrated temperature-bit relationship, and compare with the theoretical model, almost the same relationship
Tested PID controller, heating up looked good but wasn't able to cool down to 23 degree, stopped at ~27 degree
Solved the issue by putting the heatsink in ice water, however after heating up and cooling down for a few times, it dies and temp keeps going up
Ordered a CPU fan to keep heatsink at room temp
Talked to Steve, he gave some advice. Try only use P-control, shut down power before it reaches setpoint to eliminate overshoot, try heat with fan
Overshoot was effectively eliminated by shutting down the power 32-36 degrees.
Debugging the code: time variable was in "unsigned int", which messed up the Arduino code. Changed to "long long int" and worked fine
Heat sink + CPU fan was better, it reached 37.4 and 24 degrees, kP = 0.5, rise time 1.8 second
Cleaned up the wires
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Get rid of thermistor tape and bolt control unit onto base (Canjie)
Assemble the Chamber with a new heatsink (Quanxing, Canjie)
Design a cover for control unit and a adjustable camera stand (Irene)
Continue testing PID, reach +/-1 steady state error (Irene Jinchang)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Wait for a working model to test on flies
noise may affect the experiment. try to minimize noise from the fan
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Printed circuit board: haven't finalized circuit
A cover for the control unit: do it after we have a robust model of design
Get rid of thermistor tape: Canjie will work on it this week
Bolt control unit on base: Canjie will work on it this week
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
Risks and Areas of Concern
Resources or Information Required but not Available
Schedule
Describe upcoming milestone
Update Gantt chart.
Budget (list amount spent and amount remaining)
Progress on Report and Webpage