Project Objectives
Concisely list and prioritize the project objectives and constraints
High Priority Objectives
Create a prototype of cage that safely distributes or withholds food. Wants it to be easily programmable with Labview.
Second Priority Objectives
Make the feeding system removable so that the cage can be easily cleaned. Wants it to fit within his current cage setup.
Third Priority Objectives:
Make 8 of them running from a single laptop using Labview. Each should be able to have separate programmable feeding times
WOW Design Solution:
Incorporate a scale that notifies you when food is low.
Risk Reduction Strategy
Mouse safety (with moving parts)
Food accessibility
Food Dropping
Food Falling in Water
Food getting stuck
Intermediate Milestones
Approved Design
Working Prototype
Working program (Labview)
Final Product
Individual Component Analysis Topics
Materials of components
Slider Choice
Labview Programming
Microcontroller choice/programming choice
Gears/ Gear Ratios
Torque analysis/motor analysis